Laserfiche WebLink
CERS Consolidated Emergency Response!Contingency Plan <br /> H. EARTHQUAKE VULNERABILITY <br /> -Identify•areas of the facility that are vulnerable to hazardous materials releases due to seismic motion.These areas require immediate isolation and ins tion. <br /> VULNERABLE AREAS(Check all that apply): Hl. LOCATIONS(e.g.,Shop,outdoor shed,lab): H2. <br /> 1.HAZARDOUS MATERIALS AND/OR WASTE STORAGE AREAS <br /> ❑ 2.PROCESS LINES AND PIPING <br /> ❑ 3.LABORATORY <br /> ❑ 4.WASTE TREATMENT AREA <br /> Identifv mechanicals stems vulnerable to releases/spills due to earthquake-related motion.These systems require immediate isolation and inspection. <br /> VU NERABLE SYSTEMS AND/OR EQUIPMENT(Check all that apply): H3. LOCATIONS: Ha. <br /> 1.SHELVES,CABINETS AND/OR RACKS A , <br /> ❑ 2.TANKS AND SHUT-OFF VALVES I K <br /> ❑ 3.PORTABLE GAS CYLINDERS <br /> ❑ 4.EMERGENCY SHUT-OFF AND/OR UTILITY VALVES <br /> ❑ 5.SPRINKLER SYSTEMS <br /> ❑ 6.STATIONARY PRESSURIZED CONTAINERS(e.g.,Propane tank) <br /> I. EMPLOYEE TRAINING <br /> Employee training is required for all employees and/or contractors handling hazardous materials and/or hazardous wastes during normal and/or emergency operations. <br /> Most facilities will need to submit a separate Training Plan,However,your CUPA may accept this section as the Training Plan for some small facilities. <br /> Employee training plans may include the following content; <br /> • Applicable laws and regulations; Communication and alarm systems; ! <br /> • Emergency response plans and procedures; • Personal protective equipment; <br /> • Safety Data Sheets; • Use and maintenance of emergency response equipment and supplies <br /> • Hazard communication related to health and safety; (e.g Fire extinguishers,respirators,spill control materials); <br /> • Methods for safe handling of hazardous substances; • Decontamination procedures; <br /> • Hazards of materials and processes(e.g.,fire,explosion,asphyxiation); Evacuation procedures and evacuation staging locations; <br /> • Hazard mitigation,prevention and abatement procedures; • Identification of facil ity areas,equipment,and systems vulnerable to <br /> • Coordination of emergency response actions; earthquakes and other natural disasters. <br /> • Notification procedures for local emergency responders,CUPA, OTHER(Specify): <br /> Cal OES,and onsite personnel; <br /> Check the applicable boxes below to indicate how the employee training program is administered. j <br /> ❑1. FORMAL CLASSROOM ❑2. VIDEOS 9_3 SAFETY MEETINGS �4. STUDY GUIDES/MANUALS It I <br /> [15. OTHER(Specify): <br /> ❑6. NOT APPLICABLE SINCE FACILITY HAS NO EMPLOYEES <br /> 7. CHECK IF A SEPARATE EMPLOYEE TRAINING PLAN iS USED AND UPLOADED TO CERS AS A PDF DOCUMENT p• I <br /> 8. CHECK IF EMPLOYEE TRAINING IS COVERED BY THE ABOVE REFERENCED CONTENT AND OTHER DOCUMENTS ONSITE 14' <br /> —EMPLQVEE TRAIP_{ING FREQUENCY AND RECORDKEEPIh1G TRAINING MUST BE; <br /> Provided initially for.new employees as-soon as-pmjble following the date of hire,- New employees should not work in an unsupervised position. hat involves <br /> hazardous materials-handling and/or hazardous waste management without proper training; <br /> • Provided within six months from the date of hire for new employees at a large quantity generator; <br /> • Ongoing and provided at least annually; <br /> • Amended prior to a change in process or work assignment; <br /> • Given upon modification to the Emergency Response/Contingency Plan.. i <br /> Large Quantity Generator Training:Large quantity generators(11,000 kg or more)must retain written plan and documentation of employee training which includes: <br /> •A written description of the type and amount of both initial and ongoing training that will be given to persons filling each job position having responsibility for hazardous i <br /> waste management and/or emergency response. <br /> i <br /> • The name,job tide and job description for each position at the facility related to hazardous waste management. <br /> • Current employee training records must be retained until-closure of the facility and forner employee training records must be retained for at least fhree years after <br /> termination of employment i <br /> Small Quantity Generator Training; Small quantity generators(less than 1,000 kg)must include basic hazardous Haste management and emergency response <br /> procedures but a written employee training plan and training records are not required. In order to show that the facility has met the small quantity generator employee <br /> training requirement,an employee training plan and training records may be made available. <br /> Hazardous Materials Business Plan Training:Businesses must provide initial and annual employee training that includes the content referenced above. The training <br /> may be based on the job position and training records must be made available for a period of at least three years. <br /> J. LIST OF ATTACHMENTS <br /> Check one of the fol lowing: It. <br /> 1. NO ATTACHMENTS ARE REQUIRED;or <br /> ❑2. THE FOLLOWING DOCUMENTS ARE ATTACHED: 12. <br /> Rev.03/07/17 Page 4 of 4 <br />