Laserfiche WebLink
a <br /> MW-2 <br /> Mw-6 MGNTE <br /> INS s�EwnLK � <br /> VE-5 <br /> CHP7 VE ` mW-1 <br /> • I <br /> 1 �D1 <br /> ASO-1 <br /> • / ,' <br /> CHPB VW-1 *AS-1 <br /> Ap <br /> 0 B2 <br /> VE-3* MW-7 <br /> `o -4 <br /> Bll/WPB CB5p �` � 1 <br /> . � VE-1 � <br /> MW-3 VE-2 -7 V' <br /> $ lZ1 <br /> B13/WP8 <br /> p C <br /> CB4/CHP4 9 <br /> [f <br /> •CHP2 <br /> B6/WPI � <br /> 'Z <br /> G B /WP? <br /> ts1 <br /> CHB <br /> CHP5C <br /> VES UNIT <br /> MW-5 <br /> j CHP5 <br /> • <br /> CHPL <br /> B7 <br /> O CB3 <br /> 0/WP5 CHP9 <br /> CHP3 Fa <br /> L-l- <br /> B8/WP3 <br /> LEGEND <br /> ®BUILDING <br /> MW-1 -*MONITORING WELL LOCATION <br /> ASO-1 -3�F AIR SPARGING OBSERVATION WELL <br /> IAS-I -*AIR SPARGING INJECTION WELL <br /> VW-1 0 VAPOR EXTRACTION WELL N <br /> VE-3 j*VAPOR EXTRACTION & AIR SPARGING OBSERVATION WELL <br /> ,150-2 <br /> PROPOSED TEMPORARY GROUND WATER ELEVATION MONITORING POINTS SCALE <br /> B8/WP3 • SOIL BORING 0 40 80 <br /> CB1 O CONFORMATION SOIL BORING PROPOSED SOIL BORING <br /> CHP1 • CONFORMATION HYDRO PUNCH BORING - FEET <br /> SITE PLAN ® Advanced <br /> GeoEnvironmental, Inc. <br /> CAH,{A\PI I N BROS., I N C. of*artbrrn Ca/ilo�nia <br /> 1766 1V10TjiV T E D IAB LO AVENUE PROJECT NO. AGE-NC-95-0103 FILE: CHAPIN FIGURI' <br /> r>. T O C KT O N, CALIFORNIA DATE: 06 DECEMBER 2000 DRAWN BY: MAC 2 <br />