My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:26:54 PM
Creation date
4/15/2020 2:08:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S-30-1997 2:20PM FRS' AGE NC 209 956 0700 P. 2 <br /> Advanced <br /> GeoEnvironmental Inc. _ --- <br /> of Northern California <br /> 30 May 1997 <br /> AGE-NC Project No. 95-0103 <br /> Mr.Russell Chapin <br /> CHAPIN BROS. <br /> 1203 North Carlton Avenue <br /> Stockton,California 95203 <br /> Subject: Status PG&E Transformer upgrade <br /> CHA.PIN BROS.,INC. <br /> 1766 Monte Diablo Avenue, Stockton,California <br /> Dear Mr. Chapin: <br /> The following is an update for the upgrade to the PG&E power transformer that services the site: <br /> • On 29 May 1997 is spoke with your PG&E representative,Sandy Cran. She informed me <br /> that the power transformer needed to operate the King/Buck SVE unit provided by the <br /> USTCF without interruptions,would be installed in a two daytime-span beginning Friday <br /> 30 May 1997 <br /> • On Friday 30 May 1997,a representative of AGE visited the site. Your tenant explained to <br /> AGE that PG&E would first need to removed and re-establish a power pole installed near <br /> the site in 1941,prior to any changes would be made to any of the surrounding power poles. <br /> This pole is located at the northwest corner of your property. Therefore the additional <br /> transformer was not installed on Friday. <br /> • The pole was reportedly going to be installed on Tuesday 03 June 1997,to allow for the <br /> required under ground service alert notification and appropriate permitting.Once the 55-year <br /> old pole has been upgraded to meet the design needs of PG&E,the new transformer will be <br /> installed. <br /> • AGE will continue to maximize the soil vapor extraction on the week-ends and at night and <br /> will also update you on the operation of the extraction unit. <br /> 1803 West March Lane,Suite A,Stockton,California 95207 <br /> Telephone(209)956-0264 FAX(209)956-0700 <br />
The URL can be used to link to this page
Your browser does not support the video tag.