My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:26:54 PM
Creation date
4/15/2020 2:08:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Advanced <br /> GeoEnvironmental Inc . <br /> o 'Northern Califnrnia <br /> 27 May 1997 <br /> AGE-NC Project No. 95-0103 <br /> Mr. Russell Chapin <br /> CHAPIN BROS. <br /> 1203 North Carlton Avenue <br /> Stockton, California 95203 <br /> Subject: Status of SVE and IAS System Operation <br /> CHAPIN BROS., INC. <br /> 1766 Monte Diablo Avenue, Stockton, California <br /> Dear Mr. Chapin: <br /> The following is an update for the setup of a soil vapor extraction (SVE) and in-situ air sparging <br /> (IAS) system at the referenced site: <br /> • On 09 May 1997 asphalt was placed over the remediation trenching network. This asphalt <br /> was installed at your request and is now a permanent fixture on the site. <br /> • The current vapor well network has allowed for additional soil vapor extraction. However, <br /> lower then anticipated extraction concentration have been demonstrated with the catalytic <br /> oxidation system. The vapor recovery is related to the intermittent operation of the SVE unit, <br /> due to an unstable power supply to the site. <br /> • As noted in conversations with you and your tenant at 1766 Monte Diablo,the power supply <br /> to the site is inadequate. Fluctuations of the power have been noted by your tenant and by <br /> representatives of Green Electrical. PG&E has confirmed this finding and has prepared an <br /> engineered solution for the power deficiency. Your PG&E representative, Ms. Sandy Cran <br /> has informed me that the most likely and soonest installation of their increased power supply <br /> to the site is during the last week of May 1997. <br /> • The soil vapor extraction system has been operating when opportunities are available, <br /> specifically during the night hours and weekends. However,the extraction system operation <br /> remains unreliable due to the lack of a dependable power supply and competing use of power <br /> by the extraction unit and your tenant at the site and local users. <br /> • We will continue to maximize the soil vapor extraction and update you on the operation of <br /> the extraction unit. <br /> 1803 West March Lane,Suite A,Stockton,California 95207 <br /> Telephone(209)956-0264 FAX(209)956-0700 <br />
The URL can be used to link to this page
Your browser does not support the video tag.