My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:26:54 PM
Creation date
4/15/2020 2:08:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Advanced .� <br /> GeoEnvironmental, Inc. .:o.- <br /> of Northern California <br /> 05 May 1997 <br /> AGE-NC Project No. 95-0103 <br /> Mr. Russell Chapin <br /> CHAPIN BROS. <br /> 1203 North Carlton Avenue <br /> Stockton, California 95203 <br /> Subject: Status of Soil Vapor Extraction Unit and In-Situ Air Sparging System Setup <br /> CHAPIN BROS., INC. <br /> 1766 Monte Diablo Avenue, Stockton, California <br /> Dear Mr. Chapin: <br /> The folloNving is an update for the setup of a soil vapor extraction (SVE) and in-situ air sparging <br /> (IAS) system at the referenced site: <br /> • On 19 April 1997, six in-situ air-sparging points were installed oil the site using a Geoprobe <br /> unit. The six IAS points were installed surround the single IAS well at the site. On the same <br /> day a soil vapor extraction well was installed on the site to provide soil extraction <br /> capabilities in the southeast corner of the treatment area. <br /> • Beginning on 25 March 1997, the newly installed IAS points, the soil vapor extraction well <br /> and vapor wells VE-1 and VW-1 were netNN-orked into the existing remediation network. This <br /> phase of work has not been completed, asphalt still is required to finish the network <br /> installation. <br /> • On 30 April 1997 the King, Buck/Hasstech (KBH) catalytic oxidation system (soil vapor <br /> extraction system) completed a full-24 hours of operation. The unit has been able to remove <br /> additional hydrocarbons from the newly added SVE wells to the network. <br /> • However, the upper limit of hydrocarbon vapors which the catalytic oxidation unit can <br /> process has already been exceeded. The upper limit was reached within the initial 24-hours <br /> of operation, causing the catalytic oxidation oven to over-heat and shutdown automatically. <br /> • The EnvioSparge IAS system began full-scale operation on 01 May 1997. The seven- <br /> well/point network leas already increase dissolved oxygen concentrations to the ground water <br /> and volatilization of the dissolved hydrocarbon has been observed in the surrounding <br /> monitoring wells on the site: <br /> 1803 Rest March Lane;Suite A;Stockton,California 95207 <br /> Telephone(209)956-0264 . FAX(209)956.-0700', <br />
The URL can be used to link to this page
Your browser does not support the video tag.