My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:26:54 PM
Creation date
4/15/2020 2:08:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Advanced <br /> GeoEnvironmental, Inc . _--- ' <br /> of Nort/tNrn <br /> 19 March 1997 <br /> AGE-ITC Project No. 95-0103 <br /> Mr. Russell Chapin <br /> CHAPIN BROS. <br /> 1203 North Carlton Avenue <br /> Stockton, California 95203 <br /> Subject: Status of Extraction Unit and Sparging System Setup <br /> CHAPIN BROS., INC. <br /> 1766 Monte Diablo Avenue, Stockton, California <br /> Dear Mr. Chapin: <br /> The following is an update for the setup of a soil extraction (SVE) and in-situ air sparging (IAS) <br /> system at the referenced site: <br /> • On 04 March 1997, a King, Buck/Hasstech (KBH) catalytic oxidation system (soil vapor <br /> extraction system) was delivered to the site by VPS, Inc. It is our understanding that the <br /> extraction system was supplied to you by the Underground Storage Tank Cleanup Fund. <br /> • The unit arrived in good condition with no visible exterior damage. However, after an <br /> interior inspection, several internal metal braces were discovered to have come loose during <br /> transportation. Also,several coil-iection sleeves for natural gas input were missing or broken. <br /> • After inspection of the unit, AGE contacted KBH. According to KBH personnel, the unit <br /> delivered to the site was constructed in 1990 and was the 32nd unit constructed by KBH. <br /> • Replacement parts for all missing or broken items Nvere purchased and are presently being <br /> installed. <br /> • On 12 March 1997, the natural gas line was extended and comnected to the SVE unit. <br /> • On 17 March 1997, installation of the necessary electrical power source was initiated. <br /> However, testing of the electrical source cannot be completed until final installation of the <br /> natural gas line. Final gas line installation is scheduled for 21 March 1997. <br /> • The EnvioSparge IAS system was delivered to the site on 19 March 1997. The EnviroSparge <br /> system will be connected to the existing sparging point piping. <br /> • We anticipate startup procedures for both units to commence on 25 March 1997. <br /> 1803 West March Lane, Suite A, Stockton,California 95207 <br /> Telephone(209)956-0264 FAX(209)956-0700 <br />
The URL can be used to link to this page
Your browser does not support the video tag.