Laserfiche WebLink
12-01-1996 9:28Ph9 FROM RUSSELL F CHAPIN 209 4646947 P. 2 <br /> r-ffi .A anmoi® <br /> - - � - <br /> --- - <br /> 11 it <br /> DATE NOVEMBER 26, 1996 <br /> TO ANDY LUSH <br /> FROK RI.1S'SELLF.CHAPIN <br /> AS PER OUR PREVIOUS CONVERSATION CONCERNING THE SUCCESS OF OUR CLEANUP <br /> SITE WE HAVE REQUESTED A PRELIMINARY REPORT WHICH IS NOW OVERDUE_.IT IS <br /> MORE IMPORTANT SINCE T14E PRESENT SYSTEM IS NOT OPERATING CONTINUOUSLY <br /> WITH A SUBSTANTIAL LOSS OF OPERATING TIME EVEN THOUGH IT IS BEING INTENSELY <br /> MONITORED. rN ADDATION THE HIGH RATE OF OIL C:ONSUMMON AND frS COSTS OR <br /> NOT AMIMNABLE TO CONTINUOUSLY RUN TIME, AS TO THE REQUEST NVE ARE.EXPEC'T'ING, <br /> LISTED BELOW ARE SOME OF THE.DATA THAT SHOULD BE INCLUDED IN T14E REPORT. <br /> HOURS OF OPPRATION <br /> Total run time and documentation of when the system was shut down.Why the <br /> system was shut down,and when the system was placed hack in service. We realize that poor equiPment <br /> or rest nse time to a doom system may significantly protract remediation. <br /> MASS EXTRACTION RATE <br /> The average flow rate and the average concentration ofthe vapor stream plotted <br /> an a daily basis_ Since mass extraction rates plotted on a daily basis allow estimates of other technologies <br /> which may be appropriate <br /> VAPOR CONC:EN J RATION ATTHE WELLIREAU <br /> Simc vapor cok)"ntxation at the wellhead is important and useful when <br /> negotiating with the agewy to close the site, <br /> SPECTATION OF THE INLET AND WELLHEAD VAPOR STREAMS <br /> We believe this speciation of the vapor stream is critical for fuel hydrocarbons <br /> site such as determining the need of additional wells and areas where hydrocarbons are being drawn from <br /> locations far removed from the targeted areaa such as the dirt tot across the street. <br /> WE HAVE EXPRESSED OUR CONCERNS MANY"TIMES THAT THE.SITE BE CLEANED UP TN A- <br /> REASONABLE TllvfF,, THUS FAIT OUR)1XPERLENCES AND THEIR SOLUTIONS HAVE <br /> CERTAINLY LOWERED OUR COMFORT LEVEL, SINCE TETE SITE CONDITION'S WERE WELL <br /> KNOWN THERE IS NO EXCUSE FOR NOT DESIGNING A SYSTEM TO CLEAN UP THE SITE IN A <br />