My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:26:54 PM
Creation date
4/15/2020 2:08:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC HEALTH SERqVICES <br /> SAN JOAQUIN COUNTY ' <br /> ENVIRONMENTAL HEALTH DIVISION <br /> Karen Furst, M.D., M.P.H., Health Officer <br /> 304 East Weber Avenue,Third Floor • Stockton, CA 95202 %i=oRa <br /> 209/468-3420 <br /> RUSSELL CHAPIN <br /> CHAPIN BROS.INC. <br /> 1203 N CARLTON AVE <br /> STOCKTON <br /> RE: 1766 MONTE DIABLO,STOCKTON LOP SITE CODE: 1190 <br /> WORK PLAN: Remedial Action Work Plan Revision <br /> DATED: June 28,2001 <br /> PREPARED BY:AGE Inc. <br /> APPROVED: <br /> DISAPPROVED: <br /> ADDENDUMNhhL)hL)P Submit bv: <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN[H&S 25299.37,subd(c)(3)]: <br /> 1. Implement revised Corrective Action Plan to conduct groundwater pump and treat remediaton. Due to a rise <br /> in groundwater and the inability to continue with current vapor extraction remediation,groundwater pump and <br /> treat will be conducted to reduce contaminates to the remedial goal of MCLS. <br /> 2. Install 3 additional groundwater extraction well. <br /> 3. Install dedicated groundwater pumps in wells. <br /> 4. Install groundwater treatment system. <br /> 5. Prepare monthly groundwater pump and treat system operation updates. <br /> 6. Continue quarterly groundwater monitoring and reporting. <br /> COMMENTS AND CONDITIONS: <br /> Submit a permit application for well installation. <br /> Submit the groundwater pump and treat system design and engineering specifications. <br /> The"Tri-Regional Board Staff Recommendations For Preliminary Evaluation and Investigation of Underground Tank <br /> Sites" along with its"Appendix A" and"Appendix B" should be used as guidance documents. All work and reports <br /> which require geological or engineering evaluation must be performed under the direction of an appropriate California <br /> registered or certified professional. <br /> DATED �II L01 BY <br /> Harlin Knoll,Senior RENS (209)468-3442 <br /> CC: CRWQCB,Central Valley Region-Marty Hartzell <br /> AGE-Bill Little <br /> A Division of San Joaquin County Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.