My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:26:54 PM
Creation date
4/15/2020 2:08:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 _ <br /> PROPOSED MEETING AGENDA <br /> CHAPIN BROTHERS INC <br /> 1766 Monte Diablo Ave. <br /> Stockton, California <br /> Location: San Joaquin County Public Health Services - Environmental Health Services <br /> Date: 05 April 2000 <br /> Attending: Mr. Russell Chapin-Property Owner/Responsible Party <br /> Mr. Marty Hartzell -RWQCB <br /> Mr. Harlin Knoll and Ms. Margaret Lagorio - PHS-EHD <br /> Mr. William Little -Advanced GeoEnvironmental, Inc. ,et al. <br /> Proposed Topics for Discussion: <br /> 1. Data from confirmation sampling <br /> 2. Apparent dissolved hydrocarbon plume stability. <br /> 3. Soil vapor recovery concentrations (Dec 1999). <br /> 4. Site Closure Criteria <br /> AGE recommends the following: <br /> • Conduct an additional ground water monitoring event <br /> • Prepare to reactivate the remediation system: IAS and SVE - monitor soil vapor recovery <br /> concentrations to determine extent of operation or dissolved hydrocarbons response to IAS. <br /> • Prepare a request for certified site closure. <br /> • Abandon wells on and off the site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.