My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:26:54 PM
Creation date
4/15/2020 2:08:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 COPY <br /> :SPR 13 1999 <br /> Russell Chapin <br /> Soil and groundwater samples need to be collected to determine the current conditions <br /> and evaluate those concentrations in relationship to concentrations previously <br /> documented prior to VES operation. <br /> The vertical extent of contamination in soil has not been defined on site in the area of <br /> MW-1; sample number S-20-B1 contained 15 ppm TPI-Ig and 0.26 ppm Benzene at 20 <br /> feet bgs. This area needs to be further characterized vertically. Further vertical soil <br /> definition also needs to be completed in the areas of MW-4 and VE-1. <br /> The soil and groundwater conditions off site, downgradient of the facility in the area of <br /> MW-3 and MW-5, also need further definitions in order to perform a mass volume <br /> estimate and evaluate the possible need to perform active or passive off site <br /> remediation. <br /> PHS/EHD agrees with AGE's proposal to destroy MW-7 which has tested below <br /> detection limits in soil and groundwater. Please submit a work plan and permit <br /> application for review and permit issuance. <br /> If you have any further questions regarding this matter, please contact Harlin Knoll at <br /> (209) 468-3442. <br /> Donna Heran, REHS, Director <br /> Environmental Health Division <br /> Harlin Knoll, Senior REHS Margareftagorio, REHS <br /> LOP/Site Mitigation Unit IV Supervisor <br /> HK:Ib <br /> c: RWQCB, Central Valley Region — Mark List <br /> c: AGE <br /> chaplet <br />
The URL can be used to link to this page
Your browser does not support the video tag.