My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:28:03 PM
Creation date
4/15/2020 2:17:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPIN BRO �n . , INC . <br /> Properties andAgricithure, Shice 1040 <br /> 1203 N. Carlton Avenue Stockton, California 95203 <br /> >% <br /> Fax -6947 1 •, • <br /> F ECER ED <br /> a 2006 <br /> EMVIAEALTH <br /> p'wvo-ilu.RviCES <br /> September 17, 2006- <br /> N0e1 C. Henderson <br /> Environmental Health Dept. <br /> S.J. County <br /> 304 East Weber Ave. <br /> Stockton, Ca. 95202/2708 <br /> RE: Proposal for Work Plan No 06-3022/Revised#04/2820 <br /> 1766 Mounte Diablo Ave. <br /> Stockton, Ca. <br /> We have instructed Advanced GeoEnviornmental. Inc. to provide a work plan that <br /> includes additional assessment and criteria by the CVRWQCB for closure consideration <br /> Of most importance is the potential for vapor intrusion. This could include up-date <br /> vapor extraction system and a duel-phase deeper low flow special pump. It is our belief <br /> this plan covers in detail a response to excerpts from your directive letter of March 03, <br /> 2005 It should be noted the work plan#2820 submitted by AGE (June 15, 06)was <br /> unacceptable an less than adequate. <br /> We believe this completed work plan will answer the E.V.H. health concern of Soil <br /> Vapor and that the site merits closure. <br /> Should there be any regulatory objections that might cause further delay and add to the <br /> already excessive cost to this project(commenced in 1990)we are prepared to re-submit <br /> our letter(Nov. 04)Underground Tank Closure Appeal. Based on the information <br /> previously provided we believe,that appropriate response action has been completed. <br /> That acceptable remedial practices were implemented, and that, at this time, no further <br /> investigation, remedial action or monitoring is required at this site(1766 Mt. Diablo) <br /> The relevant question why conditions remaining at the site will not adversely impact <br /> water quality,health, or other beneficial use?. This assumptions must include we are <br />
The URL can be used to link to this page
Your browser does not support the video tag.