Laserfiche WebLink
Nov 19 2004 4: 31PM Chapin Brothers Investmen 209-46476947 p. 3 <br /> February 24, 1997Recoived pre-approval of Corrective Action Flan 0557 undo <br /> signature oNnmanuel Jacobs with Resources Control ; n�inecr Z ,S.T Cleanup Fund, <br /> March 19, 1997 received :he delivery from the U.S.T. F`FJN'D used equipment <br /> King Buck(kbh) Catalytic and oxidation system (soil vapo: extraction, system). This <br /> equipment was not complete, pars missing etc, causing rnary hours of non-operational <br /> time and expense. <br /> March 28, 1997 In accordance with my request AGE conducted a revicw <br /> o;the soil vapor extraction (SVE)network an in-situ air sparing (IAS) nevvork installed <br /> at this site The review was cond=cd to determine if a reed for additional wells and <br /> networking was expected also lucluding the soil beneath the bilildin¢. <br /> March 28, 1997 we continued to receive delinquent notices E-om the office of S. J. <br /> Public Eealth Services. These char2o6 was be reversed in 1992. Only one tarl. fee was <br /> reversed leaving a balance of$978,26. Many attempts tc correct thus over-billing failed. <br /> We referred this mattes to Scn. Patrick Johnson, ane-vlr. Rick Aguilera assistant to <br /> supen,'sor Gutierrez, Both parties referred this cornplai:;t to Terry Dermody, S.J. County <br /> Counsel.Resuhs-the County stopped billing <br /> October 29.A.G.E provided a status update on the Soil Vapor Extraction/Air <br /> SparginQ Operation noting repaire to the loin-A,__l, ser;:j-_e anA n,:ai:.te ,erten uEfEct$,the. <br /> fragilitics of the SVE izit have incroes.d support time required although the system <br /> through October 1997 operated with less than nvelve (12 j hours of non-operational <br /> time. A total of 546 lbs. or 87 gallons of hydrocarbons as gasoline were removed by the <br /> S\'E tutu Also noting the rise in groundwater table at this site Has reduced the <br /> effectiveness of the soil vapor extraction system.Noting ftp---,her that the unit has <br /> currently not operated with a stable status. <br /> December 27, 1997 Tank Fund provided Prc-Approval for Sci! Vapor Extraction <br /> upgrade <br /> April 28, 1998 Discussicn/Conclusions AGE quarterly report <br /> e The ground water flow has returned to a westerly flow direction over last <br /> quarter. <br /> a The ground water monitoring well slotted intervals have a reduced <br /> effectiveness to characterize the dissolved-phase hydrocarbons plume. The <br /> screened interval of monitoring wells MMI-2-3-5 had groundwater <br /> annroximately live feet (n-above the top of tht screened interval. <br /> s During operation of the SVE systern an estimated 65 gallons of gasoline <br /> were removed bringing the present total t. 381 gallons of gasoline <br /> removed. <br />