Laserfiche WebLink
:Nov 19 2004 4: 01PM Chp n Brothers Investmen 209-4-54-6947 p. 4 <br /> G BASED ON ALL THE MANY PEARS OF EFFORT IT IS REASONABLE TO <br /> BELIEVE 1HAT DUE TO SITE SPECIFIC GEOLOGIC CONDITIONS AND THE <br /> LIMITATION OF CURRENT EFFECTIVENESS OF REMEDIAL TECHNOLOGY <br /> NO SXSTEM WILL.ACRIEVE TOIAL MASS jg?sjOVAL. <br /> rN CONCLUSION I HOPE THAT STAFF AGREES THAT THF PETROLEUM <br /> SOURCE IS REMOVED OR REMEDIATED, RISKS TO PUBLIC HEALTH AND <br /> SAFETY AND ECOLOGICAL RECEPTORS ARE REDUCED TO INSIGNIFICANT <br /> LEVELS, AND GROUNDWATER HAS BEEN CLEANTED TO ACCEPTABLE <br /> LEVEL. ALSO RECOGNIZE THAT THE TOTAL CLEA-NUP OF THIS SITE, <br /> ALTHOUGH MAY BE POSSIBLE, IN THE `REAL WORLD", IS NOT ALWAYS <br /> TECHNICALLY OR ECONOMICALLY FEASIBLE. Th'EREFOR.E NO FURTHER <br /> REMEDL4TION ACTION IS APPROPRIATE FOR THIS SITE. <br /> Contacts James L. L. Barton, R.G. Engineering Geologist E.P.A. <br /> 3443 Routicr Road, Suite A Sacramonton Ca. (916) 255-3115 <br /> Harlan Knoll Senior R.BHS Site Mitigation Unit <br /> 304 E, Weber Ave. gtoc}:ton, Ca. (209)468-3420 <br /> Ft"w P Cho* <br /> 1203 N. Carton Ave. <br /> -Skvkton, CA,962o)3r 1 M <br />