My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:28:03 PM
Creation date
4/15/2020 2:17:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• It is troubling to realize that the above action and with the threat of a <br /> suspension, I am now facing fines and Administrative Civil Liabilities. <br /> The failure of a contractional agreement with the UST fund to repay our <br /> costs within sixty 60 days of receipt has caused a living nightmare. I <br /> remain committed to comply with all regulatory directives as possible. <br /> • I am now in the process of a second Underground Tank Closure Appeal <br /> however; this action is not intended to escape our responsibility as a tank <br /> owner. <br /> • As I consider the merits of continuing with the regulator to advance this <br /> process Chapin Bros. has obtained a draft work plan from three <br /> consultants 1. Source Group, Inc. 2. Closure Solutions, Inc 3. AGE of <br /> Stockton. All three proposals require additional costs exceeding <br /> $200,000. (dollars)and several years to complete. Even with this <br /> additional remediation effort, it is the consultants' opinion; Chapin Bros <br /> will never reach the goals presently in place. It is now time to ask, "What <br /> is enough"? <br /> This letter attempts to outline my general concerns from a Tank Owners perspective. <br /> Perhaps not specific to the technical issues raised but certainly enough to define our <br /> frustration level. Chapin Bros case has been open since 1995. A review of UST cleanup <br /> cases such as ours (class B#557) should insure a high priority and receive appropriate <br /> regulatory attention. <br /> I appreciate the Board and staffs attempt to correct many of my concerns, however, I am <br /> not very hopeful even if the Regional Board and Local Agency supports the proposed <br /> Resolution; the fact remains, nothing in the past action was fair and reasonable. <br /> Respectively Submitted, <br /> ej <br /> Russell F. Chapin <br />
The URL can be used to link to this page
Your browser does not support the video tag.