My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:28:03 PM
Creation date
4/15/2020 2:17:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapin Brothers Page 6 <br /> 1766 Monte Diablo May 21, 2009 <br /> Stockton, CA <br /> extraction system back on and installing additional extraction wells, the EHD <br /> responded in a letter this date that they agreed with turning the ground water <br /> extraction system back on and requested justification for the additional extraction <br /> wells. <br /> 02/23/07 The date of the EHD letter approving installation of additional ground water <br /> extraction wells and expressing concern that additional site assessment, <br /> especially vapor intrusion, was not included in the work plan. <br /> 03/14-15/07 Ground water extraction wells EW4 through EW6 were installed on these dates. <br /> 06/04/07 The date of Quarterly Report- First Quarter 2007 that discusses the March 2007 <br /> installation of extraction wells and recommends restarting operation of the <br /> ground water extraction system. <br /> 09/10/07 The date of the EHD letter approving the ground water extraction work plan to <br /> restart the ground water extraction system. <br /> 09/24/07 The ground water extraction system was put back into operation on this date. <br /> 11/25/08 The date of the EHD letter that they had been notified that the ground water <br /> extraction system had been shut down without approval and directed that <br /> operation of the system was to resume within 14 days. <br /> 12/11/08 The operation of the ground water extraction system was resumed on this date. <br /> 02/17//09 The date of a second petition by Russell Chapin for closure of the site. This time <br /> it was sent to the Governor of California. <br /> 02/27/09 The date of a request from Advanced GeoEnvironmental Inc. (Chapin's <br /> consultant) for suspension of corrective action at the site and notification that the <br /> ground water extraction system would be turned off on 2/28/09. <br /> 03/19/09 The date of the EHD response to Ron Duff, the Cleanup Fund Manager, <br /> regarding the petition for closure of the site. <br /> 04/20/09 The date of the SWRCB letter requesting the EHD to respond to the petition for <br /> closure. <br /> 04/27/09 The date of the EHD letter to Chapin Brothers informing them that the ground <br /> water extraction system had been shut down for the second time without EHD <br /> approval so the case would be referred to the CVRWQCB for enforcement <br /> action. <br /> 05/17/09 The date of the EHD letter to the SWRCB providing information as to why the site <br /> should not be closed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.