My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012604
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2324
>
3500 - Local Oversight Program
>
PR0545602
>
ARCHIVED REPORTS_XR0012604
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 4:32:47 PM
Creation date
4/15/2020 4:10:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012604
RECORD_ID
PR0545602
PE
3528
FACILITY_ID
FA0004066
FACILITY_NAME
SCHUFF STEEL
STREET_NUMBER
2324
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16335001
CURRENT_STATUS
02
SITE_LOCATION
2324 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
=� "-7 ?.. <br /> 6 <br /> cement-grade bentonite, and 94 pounds of API Class A Portland cement will <br /> be used for the annular seal. The grout slurry will be placed in the HSA <br /> until the HSA is filled with grout to the surface. Sections of the HSA <br /> will be retracted and removed (maintaining a level of grout above the lead <br /> auger). Grout will be added to the inside of the HSA until filled with <br /> grout to the surface. The procedure will be repeated until all HSAs have <br /> been removed. A six-inch-diameter protective steel casing with locking <br /> cover will be placed over the well and cemented in-place to protect the <br /> well. <br /> i After well installation is complete and the grout has set for 24 hours, the <br /> will will be developed by mechanical surging, using a surge block, and a <br /> ° bailer. The development water will be stored on-site in a Baker tank, <br /> subject to disposal after analysis. <br /> y� <br /> ZZ.. <br /> The elevation of all three monitoring wells will be determinn'd by land <br /> survey. Additionally, the existing well (H-1) will be recompleted for <br /> subgrade access after construction of the South Bay Addition. Specific <br /> monitoring wall construction details and a geologic log will be recorded by <br /> �.. the field geologist/engineer. f <br /> 2.3 . Gol]eg tion of Ground Witer Samos <br /> Samples of the ground water will be obtained from the three ground water <br /> monitoring wells and analyzed for TEPH. The sample results will determine <br /> th <br /> if any diesel fuel has entered the ground water and migrated in the <br /> direction of these wells. U s 6l.��t.� YY1e'f-�iaa� <br /> Hater level measurements will be taken in each well prior to sampling, <br /> ' Then, each well will be purged of at least three casing volumes using a <br /> , < ! bailer or submersible pump. Purge water will be stored on-site in a Baker <br /> tank, subject to disposal atter analysis. Following the purge of the well, <br /> samples will be collected using a bailer and stared in glass sample <br /> containers with Teflo6l-lined caps. <br /> oeEnvir�nmen <br /> �ttal <br /> , <br /> 3t - <br />
The URL can be used to link to this page
Your browser does not support the video tag.