+
<br />C:4
<br />EQUIPMENT SCHEDULE
<br />MARK
<br />MAKE MODEL
<br />DESC,
<br />CAPACITIES
<br />AMB
<br />ELECTRICAL
<br />ACCESSORIES
<br />REMARKS
<br />CEF -
<br />MODEL
<br />102
<br />ITEM QTY VOLT PH
<br />VD
<br />CFM
<br />HEAT
<br />COOLING
<br />CS -4
<br />TITUS
<br />CEILING
<br />BLADE
<br />IN/OUT
<br />TOT/SENS
<br />WHITE
<br />INSTALL VD IN WYE
<br />100 WATT 120 10
<br />RTU -8
<br />CARRIER
<br />PACKAGE
<br />2000
<br />72
<br />54.2
<br />85
<br />FLA 25.0 208V 3PH
<br />W/ ECONOMIZER
<br />5 TON
<br />48TCDA06
<br />GAS
<br />0,5°
<br />56
<br />47.8
<br />65
<br />MCA 28.5, MOCP 45
<br />HIGH STATIC MOTOR
<br />SURFACE
<br />ELECTRIC
<br />AFF
<br />AFUE 92%
<br />13 SEER
<br />TITUS 350R
<br />CEILING
<br />ROOF CURB WT -720#
<br />MAU-1
<br />CHAMPION
<br />EVAPORATI
<br />2250
<br />8#
<br />-
<br />-
<br />3/4 HP 120V 1PH
<br />ROOF CURB WT=320#
<br />BRANCH
<br />5000DD
<br />VE COOLER
<br />05"
<br />TITUS 350R
<br />CEILING
<br />BLADE
<br />NA
<br />WYE
<br />0HP-1
<br />TRENTON
<br />OUTDOOR
<br />FURNISHED BY OTHERS
<br />-
<br />10,7
<br />85
<br />FLA 5,6 208V 3PH
<br />WT=150#
<br />BRANCH/BRANCH DUCT
<br />TEHAO11MBHT3
<br />HEAT PUMP
<br />WALL
<br />BLADE
<br />4 -WAY
<br />65
<br />MCA 6,9 MOCP 15
<br />INSTALL VD IN WYE
<br />DU85HFA
<br />CB
<br />SUPPLY
<br />I
<br />SURFACE
<br />MB
<br />BRANCH
<br />NATURAL GAS, LPG LINE
<br />BRANCH/BRANCH DUCT
<br />-
<br />HPFC-1
<br />TRENTON
<br />FAN C❑IL
<br />1240
<br />-
<br />10,7
<br />85
<br />FLA 3,6 120V 1PH MCA
<br />WT=60#
<br />DUCT TEMPERATURE SENSOR
<br />TTL115MASlA
<br />-
<br />FLEXIBLE DUCT CONNECTOR
<br />FC
<br />-
<br />65
<br />3.9 MOCP 15
<br />---
<br />DIFFUSER/REGISTER SCHEDULE
<br />MARK
<br />MAKE
<br />DESCRIPTIO
<br />FACE
<br />BLOW
<br />DAMPER
<br />COLOR
<br />REMARKS
<br />CEF -
<br />MODEL
<br />N
<br />MOUNT
<br />VD
<br />CFM
<br />"ESP
<br />OPERATING WT
<br />CS -4
<br />TITUS
<br />CEILING
<br />BLADE
<br />4 -WAY
<br />WYE
<br />WHITE
<br />INSTALL VD IN WYE
<br />100 WATT 120 10
<br />TDC-3-A4
<br />SUPPLY
<br />T -BAR
<br />BRANCH
<br />ABBREVIATIONS W/OR WO SYMBOLS
<br />BRANCH/BRANCH DUCT
<br />CS -4A
<br />TITUS
<br />CEILING
<br />BLADE
<br />4 ---WAY
<br />WYE
<br />WHITE
<br />INSTALL VD IN WYE
<br />DN
<br />TDC-6-A4
<br />SUPPLY
<br />SURFACE
<br />BRANCH
<br />AFF
<br />BRANCH/BRANCH DUCT
<br />CR -1
<br />TITUS 350R
<br />CEILING
<br />BLADE
<br />NA
<br />WYE
<br />WHITE
<br />INSTALL VD IN WYE
<br />8#
<br />NEW DUCTWORK
<br />RETURN
<br />T --BAR
<br />DEMOLITION TO BE REMOVED
<br />BRANCH
<br />BRANCH/BRANCH DUCT
<br />CR -2
<br />TITUS 350R
<br />CEILING
<br />BLADE
<br />NA
<br />WYE
<br />WHITE
<br />INSTALL VD IN WYE
<br />-
<br />FURNISHED BY OTHERS
<br />RETURN
<br />SURFACE
<br />UP THROUGH ROOF
<br />BRANCH
<br />CAPTIVEAIRE
<br />BRANCH/BRANCH DUCT
<br />WS -1
<br />TITUS 30ORS
<br />WALL
<br />BLADE
<br />4 -WAY
<br />WYE
<br />WHITE
<br />INSTALL VD IN WYE
<br />DU85HFA
<br />HOOD FAN
<br />SUPPLY
<br />I
<br />SURFACE
<br />MB
<br />BRANCH
<br />NATURAL GAS, LPG LINE
<br />BRANCH/BRANCH DUCT
<br />CONTRACTOR SHALL CONFIRM ALL REFLECTED CEILING GRID SYSTEMS WITH THE BORDER SPECIFIED
<br />IN THE SCHEDULE FOR LAYTN DIFFUSERS AND SHALL SUBMIT DIFFUSER BORDERS MATCHING GRID
<br />SYSTEMS.
<br />RUN ALL FRONT FACE REGISTER BLADES PARALLEL TO FLOOR WHEN MOUNTED IN WALLS
<br />SAS SAS - SEE ARCHITECTURAL SCHEDULE FOR FLOOR, CEILING AND WALL FINISHES. CONFIRM REGISTER
<br />FINISH (MILL OR PAINT) WITH ARCHITECT PRIOR TO ORDERING SLOTS.
<br />+ N❑ SCREW HOLES
<br />EXHAUST FAN SCHEDULE
<br />MARK
<br />MAKE MODEL
<br />DESC.
<br />CAPACITIES
<br />ELECTRICAL
<br />ACCESSORIES AND
<br />OPERATING WT#
<br />LINED DUCT WITH INSULATION
<br />SEE DRAWING FOR THICKNESS
<br />CEF -
<br />f&OWSMERM
<br />-- -
<br />ITEM QTY VOLT PH
<br />CONTROLS
<br />VD
<br />CFM
<br />"ESP
<br />RPM
<br />S❑NNES
<br />CEF-1
<br />GROAN L100
<br />CEILING
<br />100
<br />0.5
<br />850
<br />5,4
<br />100 WATT 120 10
<br />BDD, BS, SPEED
<br />8#
<br />BYPASS, NITESTAT, CLOCK
<br />EXHAUST
<br />ABBREVIATIONS W/OR WO SYMBOLS
<br />-
<br />WITH
<br />W/
<br />CONTROLLER AND
<br />WITH OUT
<br />WO/
<br />-
<br />FAN
<br />DN
<br />-
<br />GALVANIZED SHEET METAL
<br />GI
<br />DISCONNECT
<br />AFF
<br />CEF-2
<br />BROAN L60
<br />CEILING
<br />60
<br />0.5
<br />850
<br />5,4
<br />100 WATT 120 10
<br />BDD, BS, SPEED
<br />8#
<br />NEW DUCTWORK
<br />-
<br />EXHAUST
<br />DEMOLITION TO BE REMOVED
<br />TBR
<br />DUCTWORK EXISTING
<br />(E)
<br />CONTROLLER AND
<br />1100#
<br />POINT OF CONNECTION
<br />POC
<br />FAN
<br />CUT OFF POINT
<br />COP
<br />-
<br />FURNISHED BY OTHERS
<br />FBO
<br />DISCONNECT
<br />UP THROUGH ROOF
<br />KHF -1
<br />CAPTIVEAIRE
<br />KITCHEN
<br />2250
<br />05
<br />1307
<br />14,6
<br />.75 HP 115 10
<br />SEE CAPTIVEAIRE
<br />HWS,HWR
<br />- CHWS
<br />DU85HFA
<br />HOOD FAN
<br />-
<br />MACHINE BOLT
<br />MB
<br />G,LPG
<br />NATURAL GAS, LPG LINE
<br />DRAWINGS
<br />-
<br />HVAC Notes
<br />1. Furnish and install alt ductwork in accordance
<br />with the latest editions of CMC (SMACNA duct
<br />construction standards),
<br />2, All pipes, ductwork and conduit shall be installed
<br />and seismically braced per SMACNA's Seismic
<br />Restraint Guidelines, OSHPD pre -approval #R001G.
<br />3, Alt contractor furnished equipment installat#on and
<br />startup instructions shall be kept with the piece
<br />of equipment in weatherproof pouches until finat
<br />inspection. After final inspection, three sets of
<br />operation, installation, maintenance and start-up
<br />instructions shall be given to the Owner for each
<br />piece of equipment per the Ca Green Building Code,
<br />All equipment shall be installeol, isolated and
<br />supported per the manufacturer's written
<br />instructions,
<br />4. All Fire anal Fire Smoke Damper installation
<br />instructions shall be made available to the
<br />inspecting authority for their review.
<br />S. All penetrations through fire rated assemblies
<br />shall be fire stopped and sealed with a material
<br />that meets or exceeds the 'T' rating of the
<br />assembly penetrated. Materlats to be used for
<br />sealing shall be coordinated with the General
<br />Contractor to provide one brand onsite,
<br />6, Install all pipe and duct insulation materials per
<br />T-24 requirements, All material to be installed shall
<br />meet CBC flame and smoke requirements per note
<br />11.
<br />7. All work on this project shall conform to the
<br />fallowing codesl
<br />2016 CBC
<br />2016 CPC
<br />2016 CMC
<br />2016 CEC
<br />2016 CALIFORNIA GREEN BUILDING CODE,
<br />8. All wye branches connected to a diffuser, grllle
<br />or register shalt have a manual volume damper
<br />installed in the Wye branch. OBD's shall only be
<br />used when wye branches will be installed over
<br />inaccessible ceiling areas or in the slab of the
<br />building, Dampers shall be fabricated of the same
<br />gauge as the duct with V standoff, locking
<br />quadrant, and handle, Fasten red ribbon to
<br />handle to mark location,
<br />9. All gas pipe to be schedule 40 with screwed
<br />fittings, Atl air conditioning/refrigeration
<br />condensate drain lines shall be schedule 40 PVC
<br />run to the an approved receptor, Set pipe on
<br />redwood blocks with 24 go. GI cover unless
<br />otherwise shown differently on drawings,
<br />10. Provide smoke detectors in the supply air duct on
<br />all units when the aggregate cfm exceeds 2000 cfm
<br />of all equipment serving a room or more than one
<br />room and the room has no direct exits to the
<br />exterior. Duct smoke detectors shall be installed
<br />after the supply fan before any branch takeoffs.
<br />When more than one unit serves a TI space and
<br />the aggregate cfm of the units serving the TI
<br />space exceeds 2000 cfm, all HVAC equipment shall
<br />have duct smoke detectors, All duct smoke
<br />detectors shall be wired to shut down all units
<br />when a single unit alarms. When fire detection or
<br />alarm systems are provided for the building, all
<br />smoke detectors including those installed for fire
<br />smoke dampers shall be supervised by such
<br />systems per 6081 CMC. Such connections shall be
<br />shown on the deferred fire alarm submittal.
<br />11. Such connections shalt be shown on deferred fire
<br />alarm submittal,
<br />12, All exposed ductwork shall be GI pipe and fittings.
<br />Line all rectangular duct with insulation with the
<br />R -value listed in T--24 for the location of the
<br />duct (attic, conditioned or outside), All duct
<br />materials from insulation to mastics including but
<br />not Umited to sheet metal, Insulation, liners,
<br />plastics, rubber cements, latex, etc. shall be made
<br />of materials with a Flame spread <=25 and smoke
<br /><=50,
<br />13, It is the responsibility of the Mechanlcal
<br />Contractor to coordinate the installation of his
<br />work including equipment substitutions with the
<br />other trades including but no limited to electrical,
<br />fire sprinkler, framing and plumbing,
<br />14, Insulate all ductwork per the T-24 energy
<br />requirements found in the T-24 compliance report,
<br />All ductwork shall be tested for leaks with a
<br />maximum static pressure in the duct of 1,0",
<br />maximum leakage shall not exceed 4/ of the total
<br />supply and return air volumes,
<br />15. All economizer, thermostat and fan systems shall
<br />be tested per T-24 For compliance with the T-24
<br />report and the appropriate forms indlcated in the
<br />T-24 report shall be provided and signed by the
<br />Contractor prior to project close out and the
<br />HERS reports loaded up to the appropriate CHEERS
<br />or CAL -Certs hosting service,
<br />16, Contractor shall label alt equipment with unique
<br />identification using plastic engraved plates with
<br />1/2" tall lettering Indicating the equipment number
<br />and state the areas served by the equipment, See
<br />specifications on olwgs,
<br />17, All flex duct will be stretched as tight as posslble
<br />and as per manufacturers listing to avold alt kinks
<br />and sagging.
<br />18. All smoke detectors shall be tested as required
<br />with an approved smoke system per the City of
<br />Ripon's standards in the presence of the
<br />inspector or fire Marshall,
<br />19, All systems shall require an air balance report
<br />upon final Inspection, Submit reports on NEBS or
<br />NABC forms an independent certlfled air balance
<br />showing system has been balanced and OSA
<br />quantities set to that shown on drawings,
<br />20, Condensate drain lines installed in direct ar
<br />indirect sunlight shall be UV resistant CPUC or
<br />PVC pipe and shall be painted to protect from UV
<br />radiation,
<br />21. Seal all joints and seams with DP --1010 duct seater,
<br />T-24 MECH AND PLUMBING MANDATORY FEATURES
<br />1, EQUIPMENT SHALL BE CERTIFIED TO MINIMUM
<br />EFFICIENCY PER SECTION 110.2 - SEE SCHEDULES ON
<br />M --O
<br />2. HVAC CONTROLS AND EQUIPMENT CERTIFIED PER
<br />SECTION 1202 FOR THERMOSTATS AND DDC CONTROLS -
<br />SEE DETAILS ON MO.
<br />3. SERVICE WATER HEATING SHALL COMPLY WITH SECTION
<br />110.3 ,
<br />4, USE ❑F PILOT LIGHTS ON HVAC, GAS COOKING POOL
<br />AND SPA HEATERS PROHIBITED PER SECTION 110,5
<br />5, LAVAT❑RIES SHALL BE SET TO MAINTAIN DISCHARGE
<br />TEMP AT 110sF OR LESS PER SECTION 110.3 - SEE
<br />PLUMBING SCHEDULE
<br />6, VENTILATION REQUIREMENTS PER 120,1,b,c&d M---1 AIR
<br />BALANCE
<br />7, NATURAL VENTILATION PER 120,1,b,1 N/A
<br />8, CONTROLS SHALL MEET REQUIREMENTS PER 122, SEE
<br />M-0 AND NOTES,
<br />9, SHUT D❑WN AND BACKDRAFT DAMPERS PER 122,f See
<br />schedules on M-0
<br />10. ISOLATION AREA DEVICES PER 122,8 N/A
<br />11. PIPE INSULATION PER 120,3,8 SEE NOTES, TABLE
<br />1203-A
<br />12, REQUIREMENTS FOR DUCTS AND PLENUMS PER 124 SEE
<br />M-0, NOTES AND SPECIFICATIONS
<br />13, MECHANICAL ACCEPTANCE TEST FORMS SUBMITTED AT
<br />END OF PROJECT PER SECTI❑N 120.5, 120.7 AND 120.8
<br />SEE T24 DRAWINGS FOR FORMS REQUIRED (1-17) TO BE
<br />SUBMITTED AT THE END OF THE PROJECT FOR EACH
<br />HVAC AND PLUMBING SYSTEM, AND FOR EACH HVAC AND
<br />PLUMBING PIECE OF EQUIPMENT.
<br />SYMBOL LEGEND
<br />SYMBOL
<br />ITEM
<br />ABBREV.
<br />- HEATPUMP FAN COIL
<br />RECTANGULAR DUCT SIZE
<br />NET INSIDE DIMENSIONS
<br />- SELF CONTAINED HEAT
<br />G. DAVIS
<br />LINED DUCT WITH INSULATION
<br />SEE DRAWING FOR THICKNESS
<br />CEF -
<br />f&OWSMERM
<br />-- -
<br />FLEXIBLE SUPPLY DUCT, CLASS 1
<br />FLEXIBLE RETURN DUCT, CLASS 1
<br />ROOF EXHAUST FAN
<br />VD
<br />VD -VOLUME DAMPER, REQUIRED
<br />FD FIRE DAMPER
<br />FSD - FIRE SMOKE DAMPER
<br />CSFD - CEIL. FIRE SMOKE DAMPER
<br />MD DM - MOTORIZED DAMPER
<br />NONE
<br />FDR
<br />FSD
<br />CSFD
<br />MD DM
<br />CONDENSING UNIT
<br />DUCTWORK - GI SPIRAL PIPE
<br />FAN COIL
<br />TURNING VANES
<br />TV
<br />300
<br />CS -4
<br />12x12
<br />Fz]
<br />CR -1
<br />Fz
<br />CE -1
<br />FIRST LETTER CEILING
<br />LOCATION: FLOOR
<br />WALL
<br />GS -4 SECOND LETTER SUPPLY
<br />SERVICE: [RETURN
<br />NUMBER -TYPE: EXHAUST
<br />SEE SCHED.
<br />300 - CFM, CUBIC FEET PER MINUTE
<br />12x12 - GRILLE NECK SIZE IN INCHES
<br />PROVIDE VD'S AT ALL WYES AND TAPS
<br />SUPPLYING GRILLES AND REGISTERS FOR
<br />AIR BALANCING PER T-24.
<br />O
<br />THERMOSTAT, UNIT N0.
<br />-
<br />©� 0
<br />BYPASS, NITESTAT, CLOCK
<br />ABBREVIATIONS W/OR WO SYMBOLS
<br />-
<br />WITH
<br />W/
<br />-
<br />WITH OUT
<br />WO/
<br />-
<br />DOWN
<br />DN
<br />-
<br />GALVANIZED SHEET METAL
<br />GI
<br />ABOVE FINISHED FLOOR
<br />AFF
<br />-
<br />BELOW FINISHED FLOOR
<br />BFF
<br />-
<br />BELOW FINISHED CEILING
<br />BFC
<br />-
<br />ABOVE FINSHED CEILING
<br />AFC
<br />-
<br />NEW DUCTWORK
<br />-
<br />-X-X X X-
<br />DEMOLITION TO BE REMOVED
<br />TBR
<br />DUCTWORK EXISTING
<br />(E)
<br />z
<br />POINT OF CONNECTION
<br />POC
<br />®
<br />CUT OFF POINT
<br />COP
<br />-
<br />FURNISHED BY OTHERS
<br />FBO
<br />-
<br />UP THROUGH ROOF
<br />UTR
<br />-
<br />UNLESS OTHERWISE NOTED
<br />UON
<br />- C
<br />CONDENSATE, OVERFLOW
<br />C, OF
<br />HWS
<br />HEATING WATER SUPPLY, RETURN
<br />HWS,HWR
<br />- CHWS
<br />CHILLED WATER SUPPLY, RETURN
<br />CHWS,CHWR
<br />-
<br />MACHINE BOLT
<br />MB
<br />G,LPG
<br />NATURAL GAS, LPG LINE
<br />G, LPG
<br />-
<br />ALL THREAD ROD
<br />ATR
<br />-
<br />OUTSIDE AIR
<br />OSA
<br />FEET PER MINUTE
<br />FPM
<br />G
<br />DUCT TEMPERATURE SENSOR
<br />DTS
<br />-
<br />FLEXIBLE DUCT CONNECTOR
<br />FC
<br />-
<br />FLEX DUCT
<br />-
<br />---
<br />STEAM PIPE
<br />S
<br />STEAM CONDENSATE
<br />Sc
<br />--
<br />MAKEUP WATER
<br />CW
<br />I<
<br />SHUT OFF/BALL VALVE
<br />BV
<br />-
<br />DUCT SMOKE DETECTOR
<br />I DSD
<br />CAL GREEN NOTES HVAC
<br />NON-STANDARD ABBREVIATIONS:
<br />RTU -
<br />ROOF TOP UNIT
<br />HPFC
<br />- HEATPUMP FAN COIL
<br />SCHPFC
<br />- SELF CONTAINED HEAT
<br />G. DAVIS
<br />PUMP FAN COIL
<br />CEF -
<br />CEILING EXHAUST FAN
<br />REF --
<br />ROOF EXHAUST FAN
<br />OHP -
<br />OUTDOOR HEAT PUMP
<br />CU -
<br />CONDENSING UNIT
<br />FC -
<br />FAN COIL
<br />1 ALL DUCT SHALL BE DELIVERED T❑ JOBSITE CAPPED AND
<br />SEALED TO PREVENT DIRT AND DEBRIS FROM ENTERING
<br />DUCTWORK,
<br />2, ALL DUCT SHALL. SEALED AT THE END OF EACH DAY TO PREVENT
<br />DIRT AND DEBRIS FROM ENTERING DUCTWORK KEEP ALL
<br />REGISTER CONNECTIONS TAPED SHUT,
<br />3, INSTALL 50% MERV 6 FILTERS IN EACH RETURN AIR GRILLE IF
<br />UNITS ARE TO BE RUN BEFORE FINAL OCCUPANCY, FILTERS
<br />SHALL REMAIN IN PLACE UNTIL BUILDING CERTIFICATE OF
<br />OCCUPANCY IS RECEIVED,
<br />4. ALL HVAC REFRIGERANT LINES SHALL BE INSTALLED PER
<br />SECTION 5.508,2,1 OF THE CAL GREEN CODE (IE THE 2016 CMC),
<br />CONTRACTOR SHALL SUBMIT MANUFACTURER'S DATA SHEETS
<br />SHOWING COMPLIANCE WITH THIS SECTI❑N TO THE GENERAL
<br />CONTRACTOR,
<br />208v 30
<br />W/GROUND
<br />WIRE
<br />i I
<br />FUSED DISC BY
<br />ELECTRICAL
<br />CQNTRACTER j_ T
<br />LINE
<br />RTU-
<br />RH G Yl Y2 Wl W2 C
<br />0
<br />RC RH G Y1 Y2 Wl W2 C
<br />HONEYWELL VISI❑NPRO 8000 WITH
<br />AUTOMATED DEMAND RESPONSE
<br />FUNCTION SERIES Y AND W
<br />TERMINALS TO MATCH UNITS
<br />LINE VOLTAGE WIRING BY EC
<br />LINE VOLTAGE WIRING BY MC
<br />LOW VOLTAGE WIRING BY MC
<br />NOTE APPLIES TO ALL DETAILS
<br />THERMOSTAT
<br />DETAIL
<br />POSITIVE FLOW
<br />WEATHERT❑P OR
<br />COUNTERFLASHIN
<br />1' CLEAR SPACE
<br />BETWEEN JACK
<br />FLUE/DUCT
<br />FINISH ROOFING
<br />UP JACK AND A
<br />UNDER COUNTER
<br />ROOF JACK - 2,
<br />NAIL TO ROOF
<br />4-2'104 NAILS
<br />SEE STRUCT DW
<br />FOR TRUSSES
<br />2x BLOCKING B`
<br />FLUE OR R❑UND
<br />EXH, DUCT
<br />120v 10
<br />W/GROUND
<br />WIRE
<br />EC❑N L©GIC I
<br />BOARD
<br />IR - -- i
<br />li
<br />II
<br />DSD, SD
<br />AIR PRODUCTS SL 2000
<br />PHOTELECTRIC SMOKE
<br />DETECTOR
<br />0 0+r
<br />FIREX REMOTE
<br />TEST SWITCH
<br />AND LED'S GRN LEDp
<br />RED LED O O
<br />WORN/STROBE O
<br />RESET 0
<br />AIR PRODUCTS
<br />MS-RH/KA/P/AT
<br />4-12"0 DUCT THRU R❑❑F
<br />DETAIL
<br />RTU -
<br />GASKET - USE MANUFACTURER'S
<br />SUPPLIED WITH CURB -
<br />I2 GA ANGLE CLIP - ATTACH
<br />TO CURB W/3#10x1' SM SCREWS
<br />TO UNIT W/#10x1' SM SCREWS-
<br />CLIP
<br />CREWS-
<br />CLIP TO BE G'MIN LONG, 2 EA
<br />LONG SIDE or UNIT AT CORNERS
<br />26 GA GI
<br />C❑UNTERFLASHING
<br />(E)RTU- MANUFACTURER'S ROOF CURB
<br />14' MIN HT, 18 MIN CONSTRUCTION
<br />CURB INSTALLED AS PART OF SHELL
<br />PERMIT
<br />SEAL AIRTIGHT
<br />SHEET METAL DUCT
<br />W/1' 6.2R LINER
<br />RTU -8 ATTACHMENT TO CURB
<br />DETAIL
<br />CL
<br />208V, 240V SYSTEM
<br />DISCONNECT (42' FOR 460V
<br />SYSTEM)
<br />ELECTRICAL PANEL OR UNIT
<br />DISCONNECT
<br />DEDICATED CLEAR
<br />UNOBSTRUCTED WORKING SPACE
<br />IN FRUNT OF PANEL,
<br />FLOUR/ROOF TO STRUCTURAL
<br />MEMBER ABOVE PER NEC110-16 P.
<br />364-4. VERIFY ALL POSSIBLE
<br />CONFLICTS WITH OTHER TRADES
<br />PRIOR TO ROUGHING IN THE
<br />PANEL BOARD OR DISCONNECT,
<br />ELECTRICAL PANEL/DISCONNECT
<br />DETAIL
<br />WYE/ELB❑W/SAMCNA
<br />LOW LUSS 'T'
<br />FITTING
<br />VD ----
<br />CS- 4A.CS-1, E
<br />TITUS OR
<br />EQUAL, WHITE
<br />FINISH, NO DBD,
<br />SIZE AS INDICATED
<br />ON FLOOR PLANS
<br />-ATTACH TO JOIST
<br />W/2 -1/4'0x2' LAGS -
<br />EMBED 1-1/2' MIN
<br />DOUBLE NUTTED ALL
<br />THREAD ROD WITH
<br />SQ 1-j'xl-�'xi'
<br />WASHER TO SUPPORT
<br />STRAP
<br />DUCT SUPPORT
<br />'A' OR 'B'
<br />BELOW
<br />5' MAX FLEX
<br />VST FURNISH AT ALL SUPPLY
<br />REGISTERS IN WYE OR TAP,
<br />DAMPER SHALL HAVE
<br />LOCKING QUADRANT ON 1'
<br />STANDOFF, 3/8'0 DIAMETER
<br />SHAFTS.
<br />PLYW❑❑D/SKIP
<br />SHEETING ROOF
<br />ATTACH TO (E) JOISTS
<br />WITH 1-#10x1-1/2'
<br />FASTAP SCREW,
<br />DUCT STRAP
<br />PER CMC
<br />1--'x24 GA _/
<br />BELLY BAND)
<br />AROUND PIPE 'A' DUCT SUPPORT
<br />PLYWOOD/SKIP
<br />SHEETING R❑❑F 2E
<br />3/8'x2" LAG BOLT
<br />EMBED 1'[NT❑
<br />J❑IST/TRUSS
<br />1-b'xl-h'x18 GA
<br />SEISMIC BRACE
<br />-LOCATE EVERY 40'_1_111"AND AT CHANGES IN
<br />DIRECTION OF PIPE
<br />LATERAL BRACE
<br />40' OC AND AT
<br />CHANGE OF
<br />DIRECTION
<br />x2x ANGL
<br />ATTACH TO
<br />JOIST/TRUSS
<br />J'xl-1/2'
<br />LAG BELT -
<br />EMBED I' MIN
<br />DOUBLE NUTTED ALL
<br />THREAD ROD WITH SQ
<br />IA'xl-i'x&' WASHER
<br />TO SUPPORT STRAP
<br />1-'x24 GA BELLY
<br />-BAND ARCUND PIPE
<br />- DUCT IS EXPOSED
<br />LATERAL BRACE 60'
<br />OC AND AT CHANGE
<br />OF DIRECTION
<br />'B' SEISMIC ANCHORAGE DETAIL
<br />DUCT DUPPORTS
<br />DETAIL
<br />FLEX DUCT TO MAIN RUN TO BE
<br />MIN 3'R' LENGTH SO THAT THE
<br />DUCT SIZE AND INSULATION
<br />VALUE IS SHOWN ON ALL DUCTS
<br />AND MAX LENGTH TO BE 10'0' FOR
<br />❑SHPD AND 5'0' FOR ALL OTHERS.
<br />12' GI DUCT EXTENSION
<br />ABOVE CEILING
<br />INSULATION, FLEX
<br />DUCT TO MAIN RUN
<br />24 GAUGE GI REGISTER
<br />CAN
<br />SCREW CAN TO
<br />BLOCKING - 4 TOTAL
<br />[REGISTER - SEE PLAN
<br />FOR SIZES - PROVIDE
<br />1/2' SOUND LINER IN
<br />REGISTER CAN
<br />f rTi TKIf. I,>Vr. n rATI
<br />DETAIL
<br />x24 GA GI DUCT SUPPORT STRAP
<br />€THIN 2' OF REGISTER -- MIN FLEX
<br />)CT LENGTH IS 3'2' SO THAT ALL
<br />)CTS SHALL DISPLAY THE DUCT
<br />ZE AND INSULATION VALUE AND
<br />�X LENGTH IS 10' FOR ❑SHPD, 5'0'
<br />IR ALL OTHERS, ALL ELBOW
<br />...0IUS'S TO BE 1.5 DUCT DIAMETER,
<br />FLEX DUCT TURNS TO BE 2,0 DUCT
<br />DIAMETER
<br />T -BAR REGISTER
<br />DETAIL
<br />AT CEILING SYSTEM
<br />IR OUTLET - WT(10#
<br />7 SM SCREW OR #12
<br />A SLACK WIRE ON
<br />PPOSITE CORNCRS
<br />OTE:
<br />ECURE CEILING OUTLET TO S,A,T,
<br />FILING GRID WITH (2) #10x1/2' S/M
<br />CREWS THRU OUTLET FLANGE TO
<br />RID RUNNER AND AT DIAGONAL
<br />❑RNERS INSTALL (2) #12 GA. SLACK
<br />(IRES ATTACHED TO STRUCTURE
<br />BO VE USING CLOSED LOOP EYEBOLTS,
<br />WIRE AND SCREWS ARE REQUIRED ON
<br />ALL REGISTERS,
<br />JOB # 2019-018
<br />GDMD ENGINEERING, INC
<br />Mechanical and Safety Engineers
<br />212 W Pine St, Ste 4
<br />Lodi, Ca 95242
<br />Ph 209-367-0899
<br />Fax 209-367-0898
<br />E-mail:gdmdengrinc@sbcglobal.net
<br />api COPYRIGHT 2619
<br />REVISIONS
<br />lL PLANCHECK #1 XX/XX/XX
<br />THIS DOCUMENT, AND THE IDEAS AND DESIGNS
<br />INCORPORATED HEREIN, AS AN INSTRUMENT OF
<br />PROFESSIONAL SERVICE, IS THE PROPERTY OF
<br />1.api" AND fS NOT TO BE USED, IN WHOLE OR IN
<br />PART, FOR ANY OTHER PROJECT WITHOUT
<br />WRITTEN AUTHORIZATION.
<br />PLANNING ■ ■ ■
<br />ARCHITECTURE ■ID
<br />■
<br />■ ■
<br />ARCHITECTURE PLUS INC.
<br />4335-B NORTH STAR WAY
<br />MODESTO, CA 95356
<br />►.
<br />ph. 209.577.4661
<br />fX. 209.577.0213
<br />www.apiarc.com
<br />FRANK C. BOOTS
<br />JOSEPH L. SMITH
<br />RODNEY C. ALONZO
<br />ARCHITECTS
<br />m
<br />W
<br />W
<br />t/1
<br />1113
<br />oQ
<br />=a
<br />w
<br />W IIx
<br />Z ILU
<br />W
<br />W
<br />N
<br />N
<br />N
<br />Q
<br />V
<br />Z
<br />O
<br />DATE:
<br />JANUARY 2014
<br />JOB NO.:
<br />18115
<br />DRAWN:
<br />G. DAVIS
<br />CHECKED:
<br />G. DAVIS
<br />SHEET
<br />Q�,
<br />
|