PLUMBING SS, GAS, AND VENT FIRST FLOOR PLAN
<br />SCALE: 1/4" -
<br />PLUMBING SS, GAS, AND VENT FLOOR PLAN NOTES
<br />F1 SPILL 1-1/4' TAILPIECE FROM BEER DISPENSER FBO
<br />TO FS --1,
<br />E SPILL 1-1/4" TAILPIECE FROM HWS -11 TO FS -1F
<br />R SPILL 1-1/2" TAILPIECE FROM 3CS-1 TO FS -1.
<br />SPILL 1-1/4' TAILPIECE FROM ESPRESSO MAKER FBI]
<br />TO FS -1.
<br />SPILL 1-1/4' TAILPIECE FROM ICE BIN FB❑ TO ES -1,
<br />SPILL 1-1/4" TAILPIECE FROM PS -1 TO FS -1,
<br />0 SPILL I' TAILPIECE FROM ICE MAKER FB❑ AND 3/4'
<br />TAILPIECE FROM ICE MAKER BIN TO FS --L
<br />10 SPILL 1-1/4" TAILPIECE FROM SS1 TO FS -1.
<br />0 SPILL 1-1/4' TAILPIECE FROM DISHWASHER FBO TO
<br />C'C-1
<br />GAS SIZING TABLE
<br />DEVLEL❑PED
<br />PIPE
<br />CFH
<br />100'
<br />1/2"
<br />50
<br />SIZES FROM
<br />TABLE 1216.2(1)
<br />3/4'
<br />104
<br />2016 CPC
<br />1"
<br />195
<br />3/4'
<br />1-1/4'
<br />400
<br />VEL<=5
<br />FPS HW
<br />1-1/2"
<br />600
<br />(M1"CW TO (E)CW
<br />2'
<br />1150
<br />TO
<br />2-1/2'
<br />1640
<br />1/20CW TO
<br />3'
<br />3260
<br />NORTH
<br />10. SPILL 3/4' T&P RELIEF TO MS -1
<br />111 CONNECT (N)3'GL TO (E)GL
<br />121 CONNECT (N)3"SS TO (E)SS
<br />13. CONNECT (N)2' GAS TO (E)GAS
<br />14.
<br />(E)ROOF DRAIN AND OVERFLOW,
<br />15, SPILL TAILPIECE FROM WF -1 TO FS -1 VERIFY SIZE
<br />IN FIELD.
<br />161 POC - CONNECT (N)1'G 120 GFH W/SOV TO (E)2'G AND
<br />RUN TO (N)WH-1. (N)DEMAND ON (E)2'G = 192 CFH,
<br />17. POC - CONNECT (N)3"HV TO (E)4'VTR.
<br />181 1-1/2' DRAIN FROM MAU-1 ON ROOF PER DETAIL 9/P0,
<br />RUN DOWN WALL AND CONNECT TO SS AS SHOWN,
<br />19, SPILL 3/4" CEND FROM HPFC 1 W/CP-1 TO MS -1,
<br />PLUMBING HOT AND COLD WATER FIRST FLOOR PLAN
<br />SCALE: 1/4'' = V-0"
<br />PLUMBING HOT AND COLD WATER FLOOR PLAN NOTES
<br />3/4" H&CW IN C❑NDUIT RUN UNDER SLAB TO BAR
<br />AREA,
<br />NORTH
<br />CW SIZING TABLE dP=2
<br />1/2"
<br />FCW
<br />TO ESPRESSO MAKER FBI].
<br />0
<br />3/4'
<br />HW
<br />TO DISHWASHER FBO,
<br />FLT'S
<br />1/2'
<br />FCW
<br />TO ICE MACHINE FBI],
<br />5�
<br />3/4'
<br />H&CW
<br />RUN IN BAR CABINETRY TO PLUMBING.
<br />VEL<=5
<br />FPS HW
<br />CONNECT
<br />1/2'
<br />(M1"CW TO (E)CW
<br />NA
<br />1'CW
<br />TO
<br />AND 1'FTCW FROM WF -1.
<br />3/4'
<br />1/20CW TO
<br />MAU-1 ON ROOF PER DETAIL 9/PD,
<br />NORTH
<br />CW SIZING TABLE dP=2
<br />PST/100'
<br />FIXTURE
<br />UNITS
<br />FLT'S
<br />GPM
<br />SIZE
<br />FT
<br />FV
<br />VEL<=5
<br />FPS HW
<br />VEL<= 8
<br />FPS CW
<br />1/2'
<br />2
<br />NA
<br />2
<br />2
<br />3/4'
<br />5
<br />NA
<br />5
<br />5
<br />1'
<br />8
<br />NA
<br />8
<br />8
<br />1-1/4'
<br />20
<br />NA
<br />14
<br />14
<br />1-1/2'
<br />35
<br />15
<br />23
<br />23
<br />2'
<br />155
<br />65
<br />53
<br />53
<br />2-1/2'
<br />250
<br />130
<br />72
<br />80
<br />3'
<br />500
<br />350
<br />107
<br />140
<br />V
<br />2°VTR
<br />a
<br />,A N7
<br />E nz
<br />6A#%17n
<br />n
<br />PLUMBING ROOF PLAN
<br />SCALE: 1/4" = 1'-0"
<br />PLUMBING ROOF PLAN NOTES
<br />lid (E)1"G STUBBED UP TO RTU -6, CONNECT TO RTU -8,
<br />MAX DEMAND = 125 CFH, ACTUAL DEMAND = 72 CFH.
<br />1-21 (E)ROOF DRAIN AND OVERFLOW.
<br />LTJ SPILL 3/4' GOND W/CQ TO (E)ROOF DRAIN,
<br />E (2)(E)4' VTR'S
<br />0 KEEP ALL PLUMBING VENTS, FLUES, ETC, 10'0-- MIN,
<br />AWAY FROM ALL OSA INTAKES.
<br />1-1/2' DRAIN AND 1/2" CW THRU RO13F TO MAU-1
<br />PER DETAIL 9/P0.
<br />JOB # 2019-018
<br />NORTH
<br />GDMD ENGINEERING, INC
<br />Mechanical and Safety Engineers
<br />212 W Pine St, Ste 4
<br />Lodi, Ca 95242
<br />Ph 209-367-0899
<br />Fax 209-367-0898
<br />E-mail:gdmdengrinc@sbcgloba1.net
<br />api COPYRIGHT 2019
<br />REVISIONS
<br />ZL PLANCHECK #1 - XX/XX/XX
<br />THIS DOCUNvENT, AND THE IDEAS AND DESIGNS
<br />INCORPORATFD HEREIN, AS AN INSTRWvl NT OF
<br />PROFESSIONAL SERVICE, IS THE PROPERTY OF
<br />"bpi' AND IS NOT TO BE USED, IN WHOLE OR IN
<br />PART, FOR ANY OTHER PROJECT W ITHOUT
<br />WRITTEN AUTHORIZATION.
<br />PLANNING ■ ■ ■
<br />ARCHITECTURE ■ ■ ■
<br />V)
<br />z
<br />CL
<br />0
<br />0
<br />D
<br />Q
<br />0
<br />0
<br />w
<br />0
<br />Z
<br />d
<br />ARCHITECTURE PLUS INC.
<br />4335-B NORTH STAR WAY
<br />MODESTO, CA 95356
<br />ph. 209.577.4661
<br />fx. 209.577.0213
<br />www.apiarc.com
<br />FRANK C. BOOTS
<br />JOSEPH L. SfOITH
<br />RODNEY C. ALONZO
<br />ARCHITECTS
<br />m
<br />W
<br />W
<br />O
<br />W
<br />Z W
<br />L
<br />tsi
<br />W
<br />N
<br />N
<br />N
<br />�S\pNAC F
<br />+� M2
<br />QLD
<br />Q
<br />V
<br />0
<br />ix
<br />II DATE: JANUARY 2019 1
<br />JOB NO.: 18115
<br />DRAWN: G. DAVIS
<br />CHECKED: G. DAVIS
<br />SHEET :
<br />P1
<br />j,
<br />1
<br />J
<br />'
<br />I
<br />6A#%17n
<br />n
<br />PLUMBING ROOF PLAN
<br />SCALE: 1/4" = 1'-0"
<br />PLUMBING ROOF PLAN NOTES
<br />lid (E)1"G STUBBED UP TO RTU -6, CONNECT TO RTU -8,
<br />MAX DEMAND = 125 CFH, ACTUAL DEMAND = 72 CFH.
<br />1-21 (E)ROOF DRAIN AND OVERFLOW.
<br />LTJ SPILL 3/4' GOND W/CQ TO (E)ROOF DRAIN,
<br />E (2)(E)4' VTR'S
<br />0 KEEP ALL PLUMBING VENTS, FLUES, ETC, 10'0-- MIN,
<br />AWAY FROM ALL OSA INTAKES.
<br />1-1/2' DRAIN AND 1/2" CW THRU RO13F TO MAU-1
<br />PER DETAIL 9/P0.
<br />JOB # 2019-018
<br />NORTH
<br />GDMD ENGINEERING, INC
<br />Mechanical and Safety Engineers
<br />212 W Pine St, Ste 4
<br />Lodi, Ca 95242
<br />Ph 209-367-0899
<br />Fax 209-367-0898
<br />E-mail:gdmdengrinc@sbcgloba1.net
<br />api COPYRIGHT 2019
<br />REVISIONS
<br />ZL PLANCHECK #1 - XX/XX/XX
<br />THIS DOCUNvENT, AND THE IDEAS AND DESIGNS
<br />INCORPORATFD HEREIN, AS AN INSTRWvl NT OF
<br />PROFESSIONAL SERVICE, IS THE PROPERTY OF
<br />"bpi' AND IS NOT TO BE USED, IN WHOLE OR IN
<br />PART, FOR ANY OTHER PROJECT W ITHOUT
<br />WRITTEN AUTHORIZATION.
<br />PLANNING ■ ■ ■
<br />ARCHITECTURE ■ ■ ■
<br />V)
<br />z
<br />CL
<br />0
<br />0
<br />D
<br />Q
<br />0
<br />0
<br />w
<br />0
<br />Z
<br />d
<br />ARCHITECTURE PLUS INC.
<br />4335-B NORTH STAR WAY
<br />MODESTO, CA 95356
<br />ph. 209.577.4661
<br />fx. 209.577.0213
<br />www.apiarc.com
<br />FRANK C. BOOTS
<br />JOSEPH L. SfOITH
<br />RODNEY C. ALONZO
<br />ARCHITECTS
<br />m
<br />W
<br />W
<br />O
<br />W
<br />Z W
<br />L
<br />tsi
<br />W
<br />N
<br />N
<br />N
<br />�S\pNAC F
<br />+� M2
<br />QLD
<br />Q
<br />V
<br />0
<br />ix
<br />II DATE: JANUARY 2019 1
<br />JOB NO.: 18115
<br />DRAWN: G. DAVIS
<br />CHECKED: G. DAVIS
<br />SHEET :
<br />P1
<br />
|