Laserfiche WebLink
+ <br />)K <br />DIFFUSER/REGISTER SCHEDULE <br />ACCESSORIES <br />W/ ECONOMIZER <br />HIGH STATIC MOTOR <br />ROOF CURB WT=720# <br />ROOF CURB WT=320# <br />WT= 150# <br />WT=60# <br />MARK <br />MAKE <br />DESCRIPTIO <br />EQUIPMENT SCHEDULE <br />MARK <br />MAKE MODEL <br />DESC, <br />CAPACITIES <br />AMB <br />ELECTRICAL <br />N <br />MOUNT <br />5,4 <br />CFM HEAT CO❑LING <br />102 <br />ITEM QTY VOLT PH <br />CS -4 <br />TITUS <br />CEILING <br />IN/OUT TOT/BENS <br />4 -WAY <br />WYE <br />RTU -8 <br />CARRIER <br />PACKAGE <br />2000 72 542 <br />85 <br />FLA 25.0 208V 3PH <br />5 TON <br />48TCDA06 <br />GAS <br />0.5" 56 47.8 <br />65 <br />MCA 28.5, MOCP 45 <br />CEILING <br />BLADE <br />ELECTRIC <br />AFUE 82% 13 SEER <br />WHITE <br />INSTALL VD IN WYE <br />MAU-1 <br />CHAMPION <br />EVAPORATI <br />2250 - <br />- <br />3/4 HP 120V 1PH <br />HWS <br />5000DD <br />VE COOLER <br />0,5" <br />CEILINGBLADE <br />FIRST LETTERCEILING <br />OHP -1 <br />TRENTON <br />OUTDOOR <br />- - 10,7 <br />85 <br />FLA 5.6 208V 3PH <br />RETURN <br />TEHA011M$HT3 <br />HEAT PUMP <br />BRANCH <br />65 <br />MCA 6.9 MLJCP 15 <br />CR -2 <br />CB <br />CEILING <br />BLADE <br />NA <br />WYE <br />HPFC-1 <br />TRENTON <br />FAN COIL 11240 <br />- 10,7 <br />85 <br />FLA 3.6 120V 1PH MCA <br />BYPASS, NITESTAT, CLOCK <br />TTLI15MASlA <br />S <br />BRANCH/BRANCH DUCT <br />65 <br />3.9 MOCP 15 <br />DIFFUSER/REGISTER SCHEDULE <br />ACCESSORIES <br />W/ ECONOMIZER <br />HIGH STATIC MOTOR <br />ROOF CURB WT=720# <br />ROOF CURB WT=320# <br />WT= 150# <br />WT=60# <br />MARK <br />MAKE <br />DESCRIPTIO <br />FACE <br />BLOW <br />DAMPER <br />COLOR <br />REMARKS <br />5.4 <br />MODEL <br />N <br />MOUNT <br />5,4 <br />2250 <br />0,5 <br />OPERATING WT <br />CS -4 <br />TITUS <br />CEILING <br />BLADE <br />4 -WAY <br />WYE <br />WHITE <br />INSTALL VD IN WYE <br />FLEXIBLE RETURN DUCT, CLASS 1 <br />TDC-3-A4 <br />SUPPLY <br />T -BAR <br />NONE <br />BRANCH <br />F9 - FIRE DAMPER <br />BRANCH/BRANCH DUCT <br />CS -4A <br />TITUS <br />CEILING <br />BLADE <br />4 -WAY <br />WYE <br />WHITE <br />INSTALL VD IN WYE <br />MD DM <br />TDC-6-A4 <br />SUPPLY <br />SURFACE <br />OVERFLOW <br />BRANCH <br />HWS <br />BRANCH/BRANCH DUCT <br />CR -1 <br />TITUS 3508 <br />CEILINGBLADE <br />FIRST LETTERCEILING <br />NA <br />WYE <br />WHITE <br />INSTALL VD IN WYE <br />NATURAL GAS, LPG LINE <br />SERVICE: <br />RETURN <br />T -BAR <br />ATR <br />BRANCH <br />CR --1 <br />BRANCH/BRANCH DUCT <br />CR -2 <br />TITUS 3508 <br />CEILING <br />BLADE <br />NA <br />WYE <br />WHITE <br />INSTALL VD IN WYE <br />l� <br />THERMOSTAT, UNIT NO. <br />RETURN <br />SURFACE <br />BYPASS, NITESTAT, CLOCK <br />BRANCH <br />S <br />BRANCH/BRANCH DUCT <br />WS -1 <br />r7777RS <br />WALL <br />BLADE <br />4 -WAY <br />WYE <br />WHITE <br />INSTALL VD IN WYE <br />- - <br />DUCT SMOKE DETECTOR <br />SUPPLY <br />SURFACE <br />BRANCH <br />BRANCH/BRANCH DUCT <br />f fNIT!?Of Tflfa <br />Cunt i rr nirTIII <br />r -� <br />�� �� utiLllvL u111 SYS I LMS WITH THE BORDER SPECIFIED <br />,�� �� <br />r r <br />IN THE SCHEDULE FOR LAYIN DIFFUSERS AND SHALL SUBMIT DIFFUSER BORDERS MATCHING GRID <br />uy�s <br />SYSTEMS, <br />RUN ALL FRONT FACE REGISTER BLADES PARALLEL TO FLC❑R WHEN MOUNTED IN WALLS <br />SAS SAS - SEE ARCHITECTURAL SCHEDULE FOR ELCOR, CEILING AND WALL FINISHES. CONFIRM REGISTER <br />FINISH (MILL OR PAINT) WITH ARCHITECT PRIOR TO ORDERING SLOTS, <br />+ NO SCREW HOLES <br />MARK I MAKE MODEL <br />DESC, <br />CEF-1 'BROAN L100 CEILING <br />EXHAUST <br />FAN <br />CEF-2 BROAN L60 CEILING <br />EXHAUST <br />FAN <br />KHF -1 CAPTIVEAIRE KITCHEN <br />DU85HFA HOOD FAN <br />EXHAUST FAN SCHEDULE <br />CAPACITIES <br />CFM <br />"ESP <br />RPM <br />SONNES <br />100 <br />0,5 <br />850 <br />5.4 <br />60 <br />0.5 <br />850 <br />5,4 <br />2250 <br />0,5 <br />1307 <br />14.6 <br />HVAC Notes <br />1, Furnish and install all ductwork In accordance <br />with the latest editions of CMC (SMACNA duct <br />construction standards), <br />2. All pipes, ductwork and conduit shall loe Installed <br />and seismically braced per SMACNA's Seismic <br />Restraint Guidelines, OSHPD pre -approval #80010: <br />3, All contractor furnished equipment installation and <br />startup instructlons shall be kept with the piece <br />of equipment in weatherproof pouches until final <br />Inspection. After final inspection, three sets of <br />operation, installation, maintenance and start-up <br />instructions shall be given to the Owner for each <br />piece of equipment per the Co, Green Building Code, <br />All equipment shall 6einstalled, isolated and <br />supported per the manufacturer's written <br />instructions, <br />4. All Fire and Eire Smoke Damper Installation <br />instructions shall be made available to the <br />inspecting authority for their review, <br />5, All penetrations through fire rated assemblies <br />shall be -Fire stopped and sealed with a material <br />that meets or exceeds the 'T' rating of the <br />assembly penetrated: Materiats to be used for <br />sealing shall be coordinated with the General <br />Contractor to provide one brand onsite, <br />6. Install all pipe and duct insulation materials per <br />T-24 requirements. All material to be installed shall <br />meet CBC flame and smoke requirements per note <br />11. <br />7. All work on this project shaft conform tc the <br />following codes; <br />2016 CBC <br />P016 CPC <br />2016 CMC <br />2016 CEC <br />2016 CALIFORNIA GREEN BUILDING CODE: <br />8. All Wye branches connected to a diffuser, grille <br />or register shall have a manual Volume damper <br />installed in the Wye branch, OBD's shalt only be <br />used when Wye branches will be installed over <br />InGCCeSSIIOIe ceiling areas or in the slab of the <br />building. Dampers shall be fabricated of the same <br />gauge as the duct with 1" standoff, locking <br />quadrant, and handle. Fasten red ribbon to <br />hardle to mark location, <br />9. All gas pipe to be schedule 40 with screwed <br />fittlrgs, AU air conditioning/refrigeration <br />condensate drain fires shalt be schedule 40 PVC <br />run to the an approved receptor, Set pipe on <br />redwood blocks with 24 ga GI cover unless <br />otherwise shown differently on drawings: <br />10. Provide smoke detectors in the supply air duct on <br />all units when the aggregate cfm exceeds 2000 cfm <br />of of l equipment Serving a room or more than one <br />room and the room has no direct exits to the <br />exterior, Duct smoke detectors shalt be installed <br />after the supply fan before any branch takeoffs, <br />When more than ane unit serves a TI space and <br />the aggregate cfm of the units servirg brie TI <br />space exceeds 2000 cfm, all HVAC equipment shall <br />have duct smoke detectors: All duct Smoke <br />detectors shall be wired to shut down all units <br />when a single unit alarms, When fire detection or <br />alarm Systems are provided for the building, all <br />smoke detectors including those installed for fire <br />smoke dampers shall be supervised by such <br />systems per 608,1 CMC, Such corrections shall toe <br />shown on the deferred fire alarm submittal: <br />11, Such cornectlons shall be shown on deferred fire <br />alarm submittal,. <br />12. All exposed ductwork shall 10e GI pipe and fittings, <br />Line all rectangular duct with insulation with the <br />R -value listed in T-24 for the locatior of the <br />duct (attic, canditiored or outside). All duct <br />materials from insulation to mastics lrcluding but <br />not limited to sheet metal, lnsulation, liners, <br />plastics, rubber cements, latex, etc, shall be made <br />Of materials with a Flame spread <=25 and smoke <br /><=50, <br />ELECTRICAL <br />ACCESSORIES AND <br />ITEM <br />QTY <br />VOLT PH <br />CONTROLS <br />100 <br />WATT <br />120 10 <br />BDD 8S <br />OPERATING WT# <br />DRAWINGS <br />13, It is the responslloillty of the Mechanical <br />Contractor to coordinate the installation cf his <br />work lncluding equipment substitutions with the <br />other trades including but no limited to electrical, <br />fire sprinkler, framing and plumbing, <br />14 Insulate all ductwork per the T-24 energy <br />requirements found In the T-24 coMpl'once report, <br />All ductwork shall be tested for leaks with a <br />maximum Static pressure in the duct of 1.01, <br />maximum leakage shall not exceed 47 of the total <br />supply and return air volumes, <br />15, All economizer, thermostat and fan systems shall <br />lop tested per T-24 for compliance with the T-24 <br />report and the appropriate forms indicated in the <br />T-24 report shall loe provided and signed by the <br />Contractor prior to project close out and the <br />HERS reports loaded up to the appropriate CHEERS <br />or CAL -Certs hosting Service, <br />16. Contractor shall label all equipment withunique <br />identification using plastic engraved plates with <br />1/2" tall lettering indicating the equipment number <br />and state the areas served by the equipment. See <br />specifications on dwgs. <br />17. Ali flex duct Will be Stretched as tight as possible <br />and as per marufacturers fisting to avoid all kinks <br />and sagging, <br />18. All smoke detectors shall Toe tested as required <br />with an approved smoke system per the City of <br />Ripon's standards in the presence of the <br />inspector or fire Marshall. <br />19: All systems shall require an air balance report <br />upon final inspection Submit reports or NEBS or <br />NABC forms an independent certified air balance <br />showing System has been 10atanced and OSA <br />quantities set to that showr on drawings, <br />20. Condensate drain lines installed in direct or <br />indirect sunlight shall be UV resistant CPVC or <br />PVC pipe and shall be painted to protect from UV <br />radiation. <br />21. Seal all joints and Seams with DP -1010 duct sealer, <br />T-24 MECH AND PLUMBING MANDATORY FEATURES <br />1. EQUIPMENT SHALL BE CERTIFIED TO MINIMUM <br />EFFICIENCY PER SECTIDN 110.2 - SEE SCHEDULES ON <br />M-0. <br />2. HVAC CONTROLS AND EQUIPMENT CERTIFIED PER <br />SECTI❑N 1202 FOR THERMOSTATS AND DDC CONTROLS -- <br />SEE DETAILS ON M0, <br />3. SERVICE WATER HEATING SHALL COMPLY WITH SECTION <br />110.3 , <br />4. USE OF PILOT LIGHTS ON HVAC, GAS COOKING POOL <br />AND SPA HEATERS PROHIBITED PER SECTI❑N 110.5 <br />5. LAVATORIES SHALL BE SET TO MAINTAIN DISCHARGE <br />TEMP AT 110QF OR LESS PER SECTION 1103 - SEE <br />PLUMBING SCHEDULE <br />6, VENTILATION REQUIREMENTS PER 120,1,b,c&d M-1 AIR <br />BALANCE <br />7, NATURAL VENTILATION PER 1201101 N/A <br />8. CONTROLS SHALL MEET REQUIREMENTS PER 122, SLE <br />M-0 AND NOTES, <br />9: SHUT DOWN AND BACKDRAFT DAMPERS PER 122,E See <br />schedules on M-0 <br />10 ISOLATION AREA DEVICES PER 122,g N/A <br />11. PIPE INSULATION PER 120.3.g SEE NOTES, TABLE <br />120:3-A <br />12. REQUIREMENTS FOR DUCTS AND PLENUMS PER 124 SEE <br />M-0, NOTES AND SPECIFICATIONS <br />13, MECHANICAL ACCEPTANCE TEST FORMS SUBMITTED AT <br />END OF PROJECT PER SECTION 120:5, 1207 AND 120.8 - <br />SEE T24 DRAWINGS FOR FORMS REQUIRED (1-17) TO BE <br />SUBMITTED AT THE END OF THE PROJECT FOR EACH <br />HVAC AND PLUMBING SYSTEM, AND FOR EACH HVAC AND <br />PLUMBING PIECE OF EQUIPMENT, <br />SYMBOL LEGEND <br />SPEED <br />g#1 <br />ABBREV. <br />CONTROLLER AND <br />GALVANIZED SHEET METAL <br />RECTANGULAR DUCT SIZE <br />DISCONNECT <br />ABOVE FINISHED FLOOR <br />100 WATT 120 10 <br />BDD, BS, SPEED <br />8# <br />BFF <br />CONTROLLER AND <br />LINED DUCT WITH INSULATION <br />BFC <br />DISCONNECT <br />ABOVE FINSHED CEILING <br />75 HP 115 10 <br />SEE CAPTIVEAIRE 1106# <br />&aff2HM <br />DRAWINGS <br />13, It is the responslloillty of the Mechanical <br />Contractor to coordinate the installation cf his <br />work lncluding equipment substitutions with the <br />other trades including but no limited to electrical, <br />fire sprinkler, framing and plumbing, <br />14 Insulate all ductwork per the T-24 energy <br />requirements found In the T-24 coMpl'once report, <br />All ductwork shall be tested for leaks with a <br />maximum Static pressure in the duct of 1.01, <br />maximum leakage shall not exceed 47 of the total <br />supply and return air volumes, <br />15, All economizer, thermostat and fan systems shall <br />lop tested per T-24 for compliance with the T-24 <br />report and the appropriate forms indicated in the <br />T-24 report shall loe provided and signed by the <br />Contractor prior to project close out and the <br />HERS reports loaded up to the appropriate CHEERS <br />or CAL -Certs hosting Service, <br />16. Contractor shall label all equipment withunique <br />identification using plastic engraved plates with <br />1/2" tall lettering indicating the equipment number <br />and state the areas served by the equipment. See <br />specifications on dwgs. <br />17. Ali flex duct Will be Stretched as tight as possible <br />and as per marufacturers fisting to avoid all kinks <br />and sagging, <br />18. All smoke detectors shall Toe tested as required <br />with an approved smoke system per the City of <br />Ripon's standards in the presence of the <br />inspector or fire Marshall. <br />19: All systems shall require an air balance report <br />upon final inspection Submit reports or NEBS or <br />NABC forms an independent certified air balance <br />showing System has been 10atanced and OSA <br />quantities set to that showr on drawings, <br />20. Condensate drain lines installed in direct or <br />indirect sunlight shall be UV resistant CPVC or <br />PVC pipe and shall be painted to protect from UV <br />radiation. <br />21. Seal all joints and Seams with DP -1010 duct sealer, <br />T-24 MECH AND PLUMBING MANDATORY FEATURES <br />1. EQUIPMENT SHALL BE CERTIFIED TO MINIMUM <br />EFFICIENCY PER SECTIDN 110.2 - SEE SCHEDULES ON <br />M-0. <br />2. HVAC CONTROLS AND EQUIPMENT CERTIFIED PER <br />SECTI❑N 1202 FOR THERMOSTATS AND DDC CONTROLS -- <br />SEE DETAILS ON M0, <br />3. SERVICE WATER HEATING SHALL COMPLY WITH SECTION <br />110.3 , <br />4. USE OF PILOT LIGHTS ON HVAC, GAS COOKING POOL <br />AND SPA HEATERS PROHIBITED PER SECTI❑N 110.5 <br />5. LAVATORIES SHALL BE SET TO MAINTAIN DISCHARGE <br />TEMP AT 110QF OR LESS PER SECTION 1103 - SEE <br />PLUMBING SCHEDULE <br />6, VENTILATION REQUIREMENTS PER 120,1,b,c&d M-1 AIR <br />BALANCE <br />7, NATURAL VENTILATION PER 1201101 N/A <br />8. CONTROLS SHALL MEET REQUIREMENTS PER 122, SLE <br />M-0 AND NOTES, <br />9: SHUT DOWN AND BACKDRAFT DAMPERS PER 122,E See <br />schedules on M-0 <br />10 ISOLATION AREA DEVICES PER 122,g N/A <br />11. PIPE INSULATION PER 120.3.g SEE NOTES, TABLE <br />120:3-A <br />12. REQUIREMENTS FOR DUCTS AND PLENUMS PER 124 SEE <br />M-0, NOTES AND SPECIFICATIONS <br />13, MECHANICAL ACCEPTANCE TEST FORMS SUBMITTED AT <br />END OF PROJECT PER SECTION 120:5, 1207 AND 120.8 - <br />SEE T24 DRAWINGS FOR FORMS REQUIRED (1-17) TO BE <br />SUBMITTED AT THE END OF THE PROJECT FOR EACH <br />HVAC AND PLUMBING SYSTEM, AND FOR EACH HVAC AND <br />PLUMBING PIECE OF EQUIPMENT, <br />SYMBOL LEGEND <br />SYMBOL <br />ITEM <br />ABBREV. <br />— <br />GALVANIZED SHEET METAL <br />RECTANGULAR DUCT SIZE <br />— <br />ABOVE FINISHED FLOOR <br />AFF <br />NET INSIDE DIMENSIONS <br />BELOW FINISHED FLOOR <br />BFF <br />— <br />LINED DUCT WITH INSULATION <br />BFC <br />CONDENSING UNIT <br />ABOVE FINSHED CEILING <br />SFE DRAWING FOR THICKNESS <br />— <br />&aff2HM <br />FLEXfBLE SUPPLY DUCT, CLASS 1 <br />_x -X.---X--X- <br />— — — — <br />FLEXIBLE RETURN DUCT, CLASS 1 <br />FLEX DUCT TURNS TO BE 2.0 DUCT <br />DUCTWORK EXISTINC <br />VD - VOLUME DAMPER, REQUIRED <br />NONE <br />POINT OF CONNECTION <br />F9 - FIRE DAMPER <br />FOR <br />VD <br />FSD - FIRE SMOKE DAMPER <br />FSD <br />FURNISHED BY OTHERS <br />CSFD - CEIL FIRE SMOKE DAMPER <br />CSFD <br />UP THROUGH ROOF <br />MD DM - MOTORIZED DAMPER <br />MD DM <br />UNLESS OTHERWISE NOTED <br />(JON <br />— CCONDENSATE, <br />OVERFLOW <br />DUCTWORK - GI SPIRAL PIPE <br />HWS <br />HEATING WATER SUPPLY, RETURN <br />TURNING VANES <br />TV <br />1 300 <br />FIRST LETTERCEILING <br />CS -4 <br />12x12 <br />LOCATION: FLOOR <br />® <br />WALL <br />CS -4 SECOND LETTER SUPPLY <br />NATURAL GAS, LPG LINE <br />SERVICE: <br />1 <br />0NUMBER-TYPE: <br />RETURN <br />EXHAUST <br />ATR <br />SEE SCHED. <br />CR --1 <br />300 - CFM, CUBIC FEET PER MINUTE <br />— <br />12x12 _ GRILLE NECK SIZE IN INCHES <br />21 <br />PROVIDE VD'S AT ALL WYLS AND TAPS <br />DUCT TEMPERATURE SENSOR <br />SUPPLYING GRILLES AND REGISTERS FOR <br />CE -1 <br />AIR BALANCING PER T-24. <br />l� <br />THERMOSTAT, UNIT NO. <br />— <br />BYPASS, NITESTAT, CLOCK <br />— <br />S <br />ABBREVIATIONS W/OR WO SYMBOLS <br />STEAM CONDENSATE <br />— <br />WITH <br />W/ <br />— <br />WITH OUT <br />WO/ <br />— <br />RTU - <br />DOWN <br />DN <br />— <br />GALVANIZED SHEET METAL <br />GI <br />— <br />ABOVE FINISHED FLOOR <br />AFF <br />— <br />BELOW FINISHED FLOOR <br />BFF <br />— <br />BELOW FINISHED CEILING <br />BFC <br />CONDENSING UNIT <br />ABOVE FINSHED CEILING <br />AEG <br />— <br />NEW DUCTWORK <br />_x -X.---X--X- <br />DEMOLITION TO BE REMOVED <br />TBR <br />FLEX DUCT TURNS TO BE 2.0 DUCT <br />DUCTWORK EXISTINC <br />(E) <br />DIAMETER <br />POINT OF CONNECTION <br />POC <br />AT CEILING SYSTEM <br />CUT OFF POINT <br />COP <br />— <br />FURNISHED BY OTHERS <br />FBO <br />— <br />UP THROUGH ROOF <br />UTR <br />— <br />UNLESS OTHERWISE NOTED <br />(JON <br />— CCONDENSATE, <br />OVERFLOW <br />C, OF <br />HWS <br />HEATING WATER SUPPLY, RETURN <br />HWS,HWR <br />CHWS— <br />CHILLED WATER SUPPLY, RETURN <br />CHWS,CHWR <br />— <br />MACHINE BOLT <br />MB <br />G,LPG <br />NATURAL GAS, LPG LINE <br />G LPG <br />SCREWS THRU OUTLET FLANGE To <br />ALL THREAD ROD <br />ATR <br />— <br />OUTSIDE AIR <br />OSA <br />— <br />FEET PER MINUTE <br />FPM <br />WIRES ATTACHED TO STRUCTURE <br />DUCT TEMPERATURE SENSOR <br />DTS <br />— <br />FLEXIBLE DUCT CONNECTOR <br />FC <br />-- <br />FLEX DUCT <br />— <br />STEAM PIPE <br />S <br />— <br />STEAM CONDENSATE <br />Sc <br />— <br />MAKEUP WATER <br />CW <br />I>4 <br />SHUT OFF/BALL VALVE <br />BV <br />- - <br />DUCT SMOKE DETECTOR <br />DSD <br />NON --STANDARD ABBREVIATIONS: <br />RTU - <br />ROOF TOP UNIT <br />HPFC <br />- HEATPUMP FAN COIL <br />SCHPFC <br />- SELF CONTAINED HEAT <br />DUCT LENGTH IS 3'2' SO THAT ALL <br />PUMP FAN COIL <br />CEF - <br />CEILING EXHAUST FAN <br />REF - <br />ROOF EXHAUST FAN <br />OHP - <br />OUTDOOR HEAT PUMP <br />CU - <br />CONDENSING UNIT <br />FC - <br />FAN COIL <br />CAL GREEN NOTES HVAC <br />1, ALL DUCT SHALL BE DELIVERED TO JOBSITE CAPPED AND <br />SEALED TO PREVENT DIRT AND DEBRIS FROM ENTERING <br />DUCTWORK, <br />2. ALL DUCT SHALL SEALED AT THE END OF EACH DAY TO PREVENT <br />DIRT AND DEBRIS FROM ENTERING DUCTWORK, KEEP ALL <br />REGISTER CONNECTIONS TAPED SHUT. <br />3, INSTALL 50Y. MERV 6 FILTERS IN EACH RETURN AIR GRILLE IF <br />UNITS ARE TO BE RUN BEFORE FINAL OCCUPANCY, FILTERS <br />SHALL REMAIN IN PLACE UNTIL BUILDING CERTIFICATE OF <br />OCCUPANCY IS RECEIVED, <br />4. ALL HVAC REFRIGERANT LINES SHALL BE INSTALLED PER <br />SECTION 5,508,2,1 OF THE CAL GREEN CODE (IL THE 2016 CMC), <br />CONTRACTOR SHALL SUBMIT MANUFACTURER'S DATA SHEETS <br />SHOWING COMPLIANCE WITH THIS SECTION TO THE GENERAL <br />CONTRACTOR: <br />208v 30 <br />W/GROUND <br />WIRE <br />I I I <br />FUSED DISC BY _ <br />ELECTRICAL <br />CONTRACTOR 1 <br />LINE <br />RTIJ_ <br />RH G Y1 Y2 Wl W2 C <br />LJ <br />RC RH G Yl Y2 W1 W2 C <br />HONEYWELL VISIONPR❑ 8000 WITH <br />AUTOMATED DEMAND RESPONSE <br />FUNCTION SERIES Y AND W <br />TERMINALS TO MATCH UNITS <br />--- <br />--LINE VOLTAGE WIRING BY EC <br />LINE VOLTAGE WIRING BY MC <br />LOW VOLTAGE WIRING BY MC <br />NOTE APPLIES TO ALL DETAILS <br />THERMOSTAT <br />DETAIL <br />POSITIVE FL <br />WEATHERTOP <br />C❑UNTERFLAS <br />1' CLEAR SPS <br />BETWEEN JAI <br />FLUE/DUCT <br />FINISH ROOF <br />UP JACK ANI <br />UNDER COUN- <br />ROOF JACK - <br />NAIL TO ROD <br />4-2'10d NAIL <br />SEE STRUCT <br />FOR TRUSSES <br />2x BLOCKING <br />FLUE OR ROL <br />EXH, DUCT <br />120v 10 <br />W/GROUND <br />WIRE <br />EC❑N LOGIC <br />IT BOARD <br />RMR ! <br />I <br />I 1 <br />DSD, SD <br />AIR PRODUCTS SL 2000 <br />PHOTELECTRIC SMOKE <br />DETECTOR <br />NC �e•�• <br />FIREX REMOTE <br />TEST SWITCH <br />AND LED'S GRN LED 0 <br />RED LED <br />HORN/STROBE p R <br />RESET 0 <br />AIR; PRODUCTS <br />MS-RH/KA/P/AT <br />4-12"0 DUCT THRU ROUT <br />DETAIL <br />RTU - <br />GASKET - USE MANUFACTURER'S <br />SUPPLIED WITH CURB - <br />12 GA ANGLE CLIP - ATTACH <br />TO CURB W/3#10x1' SM SCREWS <br />TO UNIT W/#10x1' SM SCREWS <br />CLIP TO BE 6'MIN LONG: 2 EA <br />LONG SIDE OF UNIT AT CORNERS <br />26 GA GI <br />C❑UNTERFLASHING^� <br />(E)RTU- MANUFACTURER'S ROOF CURB <br />14' MIN HT, 18 MIN CONSTRUCTION <br />CURB INSTALLED AS PART OF SHELL <br />PERMIT <br />SEAL AIRTIGH- <br />SHEET METAL DUC <br />W/1' 6.2R LINER <br />RTU -8 ATTACHMENT TO CURB <br />DETAIL <br />CL <br />208V, 240V SYSTEM <br />DISCCINNECT (42' FOR 480V <br />SYSTEM) <br />ELECTRICAL PANEL UR UNIT <br />DISCONNECT <br />DEDICATED CLEAR <br />UNOBSTRUCTED WORKING SPACE <br />IN FRONT DF PANEL, <br />FLOOR/R❑❑F TO STRUCTURAL <br />MEMBER ABOVE PER NEC110--16 & <br />384-4. VERIFY ALL POSSIBLE <br />CONFLICTS WITH OTHER TRADES <br />PRIOR TO ROUGHING IN THE <br />PANEL BOARD OR DISCONNECT: <br />ELECTRICAL PANEL/DISCONNECT <br />DETAIL <br />WYE/ELBOW/SAMCNA DUCT SUPPORT <br />LOW LOSS T' 'A' OR 'B' <br />FITTING] -BEL❑W <br />VD- � 5' MA� t LEX <br />CS.- 4A -1, _.DS -1 YZ FURNISH AT ALL SUPPLY <br />TITUS OR REGISTERS IN WYE OR TAP, <br />EQUAL, WHITE DAMPER SHALL HAVE <br />FINISH, NO OBD, LOCKING QUADRANT ON 1' <br />SIZE AS INDICATED STANDOFF, 3/8'0 DIAMETER <br />ON FLOOR PLANS SHAFTS, <br />PLYWOOD/SKIP <br />SHEETING ROOF <br />ATTACH TO (E) JOISTS <br />WITH 1--#10x1-1/2' <br />2x2x1.: _�IVGLE FASTAP SCREW, <br />-- - <br />-ATTACH TO J❑IST -` <br />W/2 -1/4'0x2' LAGS <br />EMBED 1-1/2' MIN ° <br />DOUBLE NUTTED ALL DUCT STRAP <br />PER CMC"!_7 <br />THREAD ROD WITH ° <br />SQ 1-3'x1-h'x6' <br />WASHER TO SUPPORT <br />STRAP <br />1-h'x24 GA <br />BELLY BAND <br />AROUND PIPE <br />'A' DUCT SUPPORT <br />PLYW❑OIJ/SKIP <br />SHEETING ROOF 2x2xj' ANGLE <br />- ATTACH TO <br />-- - 1 - ==1: - <br />JOIST/TRUSS <br />``�W/ R'xl-1/2' <br />LAG BOLT - <br />h J FMBED 1' MIN <br />3/8'x2" LAG BOLT DOUBLE NUTTED ALL <br />EMBED PINT❑ THREAD ROD W:TH SQ <br />JOIST/TRUSS 1 j'xl-�'x6' WASHER <br />1-J'xl-1h'x1a GA TO SUPPORT STRAP <br />SEISMIC BRACE <br />-LOCATE EVERY 40' 1-'x24 GA BELLY <br />AND AT CHANGES IN BAND AROUND PIPE <br />DIRECTION OF PIPE - DUCT IS EXPOSED <br />LATERAL BRACE 80' <br />❑C AND AT CHANGE <br />LATERAL BRACE OF DIRECTION <br />40' ❑C AND AT <br />CHANGE OF <br />DIRECTION I - <br />'B' SEISMIC ANCHORAGE DETAIL <br />DUCT DUPPORTS <br />D ETAI L <br />FLEX DUCT TO MAIN RUN TO BE <br />MIN 312' LENGTH S❑ THAT THE <br />DUCT SIZE AND INSULATION <br />VALUE IS SHOWN ON ALL DUCTS <br />AND MAX LENGTH TO BE 10'0' FOR <br />OSHPD AND 5'0' FOR ALL OTHERS. <br />12' GI DUCT EXTENSION <br />AB❑VE CEILING <br />INSULATION, FLEX <br />DUCT TO MAIN RUN <br />f24 GAUGE GI REGISTER <br />CAN <br />SCREW CAN To <br />BLOCKING - 4 TOTAL <br />REGISTER - SEE PLAN <br />FOR SIZES - PROVIDE <br />1/2' SOUND LINER IN <br />REGISTER CAN <br />CEILING REG DETAIL <br />DETAIL <br />JOB # 2019-018 <br />GDMD ENGINEERING, INC <br />Mechanical and Safety Engineers <br />212 W Pine St, Ste 4 <br />Lodi, Ca 95242 <br />Ph 209-357-0899 <br />Fax 209-367-0898 <br />E-mail:gdmdengrinc@sbcglobal.net <br />dpi COPYRIGHT 2019 <br />REVISIONS <br />Q PLANCHECK #1 - XX/XX/XX <br />THIS DOCUMENT, AND THE IDEAS AND DESIGNS <br />INCORPORATED HEREIN, AS AN INSTRUMENT OF <br />PROFESSIONAL SERVICE, 15 THE PROPERTY OF <br />"opl" AND IS NOT TO BE USED, IN WHOLE OR IN <br />PART, FOR ANY OTHER PROJECT WITHOUT <br />WRITTEN AUTHORIZATION. <br />PLANNING ■ ■ ■ <br />ARCHITECTURE ■ ■ <br />ARCHITECTURE PLUS INC. <br />4335-B NORTH STAR WAY <br />MODESTO, CA 95356 <br />ph. 209.577.4661 <br />fx. 209.577.0213 <br />www.aplarc.com <br />FRANK C. BOOTS <br />JOSEPH L. SMITH <br />RODNEY C. ALONZO <br />ARCHITECTS <br />uj <br />W .j <br />0a <br />= 0 <br />W IlX <br />ix <br />Z W <br />L <br />W <br />N <br />N <br />N <br />/�\ ON A(G. FA <br />O � , <br />A <br />a <br />U <br />0 <br />+tL <br />DATE : <br />2'x24 GA GI DUCT SUPPORT STRAP <br />JOB NO.: <br />18115 <br />WITHIN 2' ❑F REGISTER - MIN FLEX <br />G. DAVIS <br />CHECKED : <br />DUCT LENGTH IS 3'2' SO THAT ALL <br />DUCTS SHALL DISPLAY THE DUCT <br />IZE AND INSULATION VALUE AND <br />MAX LENGTH IS 10' FOR OSHPD, 5'0' <br />FOR ALL OTHERS ALL ELBOW <br />RADIUS'S TO BE 1,5 DUCT DIAMETER, <br />FLEX DUCT TURNS TO BE 2.0 DUCT <br />DIAMETER <br />AT CEILING SYSTEM <br />- <br />AIR OUTLET - WT<1011# <br />#7 SM SCREW OR 41112 <br />GA SLACK WIRE ON <br />OPPOSITE CORNERS <br />NOTE: <br />SECURE CEILING OUTLET TO S.A,T, <br />-_ <br />CEILING GRID WITH (2) #10x1/2' S/M <br />SCREWS THRU OUTLET FLANGE To <br />GRID RUNNER AND AT DIAGONAL <br />- CORNERS INSTALL (2) #12 GA: SLACK <br />WIRES ATTACHED TO STRUCTURE <br />ABOVE USING CLOSED LOOP EYEBELTS, <br />WIRE AND SCREWS ARE REQUIRED ON <br />ALL REGISTERS. <br />T -BAR <br />REGISTER <br />3 <br />DETAIL <br />AAfS <br />JOB # 2019-018 <br />GDMD ENGINEERING, INC <br />Mechanical and Safety Engineers <br />212 W Pine St, Ste 4 <br />Lodi, Ca 95242 <br />Ph 209-357-0899 <br />Fax 209-367-0898 <br />E-mail:gdmdengrinc@sbcglobal.net <br />dpi COPYRIGHT 2019 <br />REVISIONS <br />Q PLANCHECK #1 - XX/XX/XX <br />THIS DOCUMENT, AND THE IDEAS AND DESIGNS <br />INCORPORATED HEREIN, AS AN INSTRUMENT OF <br />PROFESSIONAL SERVICE, 15 THE PROPERTY OF <br />"opl" AND IS NOT TO BE USED, IN WHOLE OR IN <br />PART, FOR ANY OTHER PROJECT WITHOUT <br />WRITTEN AUTHORIZATION. <br />PLANNING ■ ■ ■ <br />ARCHITECTURE ■ ■ <br />ARCHITECTURE PLUS INC. <br />4335-B NORTH STAR WAY <br />MODESTO, CA 95356 <br />ph. 209.577.4661 <br />fx. 209.577.0213 <br />www.aplarc.com <br />FRANK C. BOOTS <br />JOSEPH L. SMITH <br />RODNEY C. ALONZO <br />ARCHITECTS <br />uj <br />W .j <br />0a <br />= 0 <br />W IlX <br />ix <br />Z W <br />L <br />W <br />N <br />N <br />N <br />/�\ ON A(G. FA <br />O � , <br />A <br />a <br />U <br />0 <br />+tL <br />DATE : <br />JANUARY 2019 <br />JOB NO.: <br />18115 <br />DRAWN: <br />G. DAVIS <br />CHECKED : <br />G. DAMS <br />SHEET: <br />