+
<br />)K
<br />DIFFUSER/REGISTER SCHEDULE
<br />ACCESSORIES
<br />W/ ECONOMIZER
<br />HIGH STATIC MOTOR
<br />ROOF CURB WT=720#
<br />ROOF CURB WT=320#
<br />WT= 150#
<br />WT=60#
<br />MARK
<br />MAKE
<br />DESCRIPTIO
<br />EQUIPMENT SCHEDULE
<br />MARK
<br />MAKE MODEL
<br />DESC,
<br />CAPACITIES
<br />AMB
<br />ELECTRICAL
<br />N
<br />MOUNT
<br />5,4
<br />CFM HEAT CO❑LING
<br />102
<br />ITEM QTY VOLT PH
<br />CS -4
<br />TITUS
<br />CEILING
<br />IN/OUT TOT/BENS
<br />4 -WAY
<br />WYE
<br />RTU -8
<br />CARRIER
<br />PACKAGE
<br />2000 72 542
<br />85
<br />FLA 25.0 208V 3PH
<br />5 TON
<br />48TCDA06
<br />GAS
<br />0.5" 56 47.8
<br />65
<br />MCA 28.5, MOCP 45
<br />CEILING
<br />BLADE
<br />ELECTRIC
<br />AFUE 82% 13 SEER
<br />WHITE
<br />INSTALL VD IN WYE
<br />MAU-1
<br />CHAMPION
<br />EVAPORATI
<br />2250 -
<br />-
<br />3/4 HP 120V 1PH
<br />HWS
<br />5000DD
<br />VE COOLER
<br />0,5"
<br />CEILINGBLADE
<br />FIRST LETTERCEILING
<br />OHP -1
<br />TRENTON
<br />OUTDOOR
<br />- - 10,7
<br />85
<br />FLA 5.6 208V 3PH
<br />RETURN
<br />TEHA011M$HT3
<br />HEAT PUMP
<br />BRANCH
<br />65
<br />MCA 6.9 MLJCP 15
<br />CR -2
<br />CB
<br />CEILING
<br />BLADE
<br />NA
<br />WYE
<br />HPFC-1
<br />TRENTON
<br />FAN COIL 11240
<br />- 10,7
<br />85
<br />FLA 3.6 120V 1PH MCA
<br />BYPASS, NITESTAT, CLOCK
<br />TTLI15MASlA
<br />S
<br />BRANCH/BRANCH DUCT
<br />65
<br />3.9 MOCP 15
<br />DIFFUSER/REGISTER SCHEDULE
<br />ACCESSORIES
<br />W/ ECONOMIZER
<br />HIGH STATIC MOTOR
<br />ROOF CURB WT=720#
<br />ROOF CURB WT=320#
<br />WT= 150#
<br />WT=60#
<br />MARK
<br />MAKE
<br />DESCRIPTIO
<br />FACE
<br />BLOW
<br />DAMPER
<br />COLOR
<br />REMARKS
<br />5.4
<br />MODEL
<br />N
<br />MOUNT
<br />5,4
<br />2250
<br />0,5
<br />OPERATING WT
<br />CS -4
<br />TITUS
<br />CEILING
<br />BLADE
<br />4 -WAY
<br />WYE
<br />WHITE
<br />INSTALL VD IN WYE
<br />FLEXIBLE RETURN DUCT, CLASS 1
<br />TDC-3-A4
<br />SUPPLY
<br />T -BAR
<br />NONE
<br />BRANCH
<br />F9 - FIRE DAMPER
<br />BRANCH/BRANCH DUCT
<br />CS -4A
<br />TITUS
<br />CEILING
<br />BLADE
<br />4 -WAY
<br />WYE
<br />WHITE
<br />INSTALL VD IN WYE
<br />MD DM
<br />TDC-6-A4
<br />SUPPLY
<br />SURFACE
<br />OVERFLOW
<br />BRANCH
<br />HWS
<br />BRANCH/BRANCH DUCT
<br />CR -1
<br />TITUS 3508
<br />CEILINGBLADE
<br />FIRST LETTERCEILING
<br />NA
<br />WYE
<br />WHITE
<br />INSTALL VD IN WYE
<br />NATURAL GAS, LPG LINE
<br />SERVICE:
<br />RETURN
<br />T -BAR
<br />ATR
<br />BRANCH
<br />CR --1
<br />BRANCH/BRANCH DUCT
<br />CR -2
<br />TITUS 3508
<br />CEILING
<br />BLADE
<br />NA
<br />WYE
<br />WHITE
<br />INSTALL VD IN WYE
<br />l�
<br />THERMOSTAT, UNIT NO.
<br />RETURN
<br />SURFACE
<br />BYPASS, NITESTAT, CLOCK
<br />BRANCH
<br />S
<br />BRANCH/BRANCH DUCT
<br />WS -1
<br />r7777RS
<br />WALL
<br />BLADE
<br />4 -WAY
<br />WYE
<br />WHITE
<br />INSTALL VD IN WYE
<br />- -
<br />DUCT SMOKE DETECTOR
<br />SUPPLY
<br />SURFACE
<br />BRANCH
<br />BRANCH/BRANCH DUCT
<br />f fNIT!?Of Tflfa
<br />Cunt i rr nirTIII
<br />r -�
<br />�� �� utiLllvL u111 SYS I LMS WITH THE BORDER SPECIFIED
<br />,�� ��
<br />r r
<br />IN THE SCHEDULE FOR LAYIN DIFFUSERS AND SHALL SUBMIT DIFFUSER BORDERS MATCHING GRID
<br />uy�s
<br />SYSTEMS,
<br />RUN ALL FRONT FACE REGISTER BLADES PARALLEL TO FLC❑R WHEN MOUNTED IN WALLS
<br />SAS SAS - SEE ARCHITECTURAL SCHEDULE FOR ELCOR, CEILING AND WALL FINISHES. CONFIRM REGISTER
<br />FINISH (MILL OR PAINT) WITH ARCHITECT PRIOR TO ORDERING SLOTS,
<br />+ NO SCREW HOLES
<br />MARK I MAKE MODEL
<br />DESC,
<br />CEF-1 'BROAN L100 CEILING
<br />EXHAUST
<br />FAN
<br />CEF-2 BROAN L60 CEILING
<br />EXHAUST
<br />FAN
<br />KHF -1 CAPTIVEAIRE KITCHEN
<br />DU85HFA HOOD FAN
<br />EXHAUST FAN SCHEDULE
<br />CAPACITIES
<br />CFM
<br />"ESP
<br />RPM
<br />SONNES
<br />100
<br />0,5
<br />850
<br />5.4
<br />60
<br />0.5
<br />850
<br />5,4
<br />2250
<br />0,5
<br />1307
<br />14.6
<br />HVAC Notes
<br />1, Furnish and install all ductwork In accordance
<br />with the latest editions of CMC (SMACNA duct
<br />construction standards),
<br />2. All pipes, ductwork and conduit shall loe Installed
<br />and seismically braced per SMACNA's Seismic
<br />Restraint Guidelines, OSHPD pre -approval #80010:
<br />3, All contractor furnished equipment installation and
<br />startup instructlons shall be kept with the piece
<br />of equipment in weatherproof pouches until final
<br />Inspection. After final inspection, three sets of
<br />operation, installation, maintenance and start-up
<br />instructions shall be given to the Owner for each
<br />piece of equipment per the Co, Green Building Code,
<br />All equipment shall 6einstalled, isolated and
<br />supported per the manufacturer's written
<br />instructions,
<br />4. All Fire and Eire Smoke Damper Installation
<br />instructions shall be made available to the
<br />inspecting authority for their review,
<br />5, All penetrations through fire rated assemblies
<br />shall be -Fire stopped and sealed with a material
<br />that meets or exceeds the 'T' rating of the
<br />assembly penetrated: Materiats to be used for
<br />sealing shall be coordinated with the General
<br />Contractor to provide one brand onsite,
<br />6. Install all pipe and duct insulation materials per
<br />T-24 requirements. All material to be installed shall
<br />meet CBC flame and smoke requirements per note
<br />11.
<br />7. All work on this project shaft conform tc the
<br />following codes;
<br />2016 CBC
<br />P016 CPC
<br />2016 CMC
<br />2016 CEC
<br />2016 CALIFORNIA GREEN BUILDING CODE:
<br />8. All Wye branches connected to a diffuser, grille
<br />or register shall have a manual Volume damper
<br />installed in the Wye branch, OBD's shalt only be
<br />used when Wye branches will be installed over
<br />InGCCeSSIIOIe ceiling areas or in the slab of the
<br />building. Dampers shall be fabricated of the same
<br />gauge as the duct with 1" standoff, locking
<br />quadrant, and handle. Fasten red ribbon to
<br />hardle to mark location,
<br />9. All gas pipe to be schedule 40 with screwed
<br />fittlrgs, AU air conditioning/refrigeration
<br />condensate drain fires shalt be schedule 40 PVC
<br />run to the an approved receptor, Set pipe on
<br />redwood blocks with 24 ga GI cover unless
<br />otherwise shown differently on drawings:
<br />10. Provide smoke detectors in the supply air duct on
<br />all units when the aggregate cfm exceeds 2000 cfm
<br />of of l equipment Serving a room or more than one
<br />room and the room has no direct exits to the
<br />exterior, Duct smoke detectors shalt be installed
<br />after the supply fan before any branch takeoffs,
<br />When more than ane unit serves a TI space and
<br />the aggregate cfm of the units servirg brie TI
<br />space exceeds 2000 cfm, all HVAC equipment shall
<br />have duct smoke detectors: All duct Smoke
<br />detectors shall be wired to shut down all units
<br />when a single unit alarms, When fire detection or
<br />alarm Systems are provided for the building, all
<br />smoke detectors including those installed for fire
<br />smoke dampers shall be supervised by such
<br />systems per 608,1 CMC, Such corrections shall toe
<br />shown on the deferred fire alarm submittal:
<br />11, Such cornectlons shall be shown on deferred fire
<br />alarm submittal,.
<br />12. All exposed ductwork shall 10e GI pipe and fittings,
<br />Line all rectangular duct with insulation with the
<br />R -value listed in T-24 for the locatior of the
<br />duct (attic, canditiored or outside). All duct
<br />materials from insulation to mastics lrcluding but
<br />not limited to sheet metal, lnsulation, liners,
<br />plastics, rubber cements, latex, etc, shall be made
<br />Of materials with a Flame spread <=25 and smoke
<br /><=50,
<br />ELECTRICAL
<br />ACCESSORIES AND
<br />ITEM
<br />QTY
<br />VOLT PH
<br />CONTROLS
<br />100
<br />WATT
<br />120 10
<br />BDD 8S
<br />OPERATING WT#
<br />DRAWINGS
<br />13, It is the responslloillty of the Mechanical
<br />Contractor to coordinate the installation cf his
<br />work lncluding equipment substitutions with the
<br />other trades including but no limited to electrical,
<br />fire sprinkler, framing and plumbing,
<br />14 Insulate all ductwork per the T-24 energy
<br />requirements found In the T-24 coMpl'once report,
<br />All ductwork shall be tested for leaks with a
<br />maximum Static pressure in the duct of 1.01,
<br />maximum leakage shall not exceed 47 of the total
<br />supply and return air volumes,
<br />15, All economizer, thermostat and fan systems shall
<br />lop tested per T-24 for compliance with the T-24
<br />report and the appropriate forms indicated in the
<br />T-24 report shall loe provided and signed by the
<br />Contractor prior to project close out and the
<br />HERS reports loaded up to the appropriate CHEERS
<br />or CAL -Certs hosting Service,
<br />16. Contractor shall label all equipment withunique
<br />identification using plastic engraved plates with
<br />1/2" tall lettering indicating the equipment number
<br />and state the areas served by the equipment. See
<br />specifications on dwgs.
<br />17. Ali flex duct Will be Stretched as tight as possible
<br />and as per marufacturers fisting to avoid all kinks
<br />and sagging,
<br />18. All smoke detectors shall Toe tested as required
<br />with an approved smoke system per the City of
<br />Ripon's standards in the presence of the
<br />inspector or fire Marshall.
<br />19: All systems shall require an air balance report
<br />upon final inspection Submit reports or NEBS or
<br />NABC forms an independent certified air balance
<br />showing System has been 10atanced and OSA
<br />quantities set to that showr on drawings,
<br />20. Condensate drain lines installed in direct or
<br />indirect sunlight shall be UV resistant CPVC or
<br />PVC pipe and shall be painted to protect from UV
<br />radiation.
<br />21. Seal all joints and Seams with DP -1010 duct sealer,
<br />T-24 MECH AND PLUMBING MANDATORY FEATURES
<br />1. EQUIPMENT SHALL BE CERTIFIED TO MINIMUM
<br />EFFICIENCY PER SECTIDN 110.2 - SEE SCHEDULES ON
<br />M-0.
<br />2. HVAC CONTROLS AND EQUIPMENT CERTIFIED PER
<br />SECTI❑N 1202 FOR THERMOSTATS AND DDC CONTROLS --
<br />SEE DETAILS ON M0,
<br />3. SERVICE WATER HEATING SHALL COMPLY WITH SECTION
<br />110.3 ,
<br />4. USE OF PILOT LIGHTS ON HVAC, GAS COOKING POOL
<br />AND SPA HEATERS PROHIBITED PER SECTI❑N 110.5
<br />5. LAVATORIES SHALL BE SET TO MAINTAIN DISCHARGE
<br />TEMP AT 110QF OR LESS PER SECTION 1103 - SEE
<br />PLUMBING SCHEDULE
<br />6, VENTILATION REQUIREMENTS PER 120,1,b,c&d M-1 AIR
<br />BALANCE
<br />7, NATURAL VENTILATION PER 1201101 N/A
<br />8. CONTROLS SHALL MEET REQUIREMENTS PER 122, SLE
<br />M-0 AND NOTES,
<br />9: SHUT DOWN AND BACKDRAFT DAMPERS PER 122,E See
<br />schedules on M-0
<br />10 ISOLATION AREA DEVICES PER 122,g N/A
<br />11. PIPE INSULATION PER 120.3.g SEE NOTES, TABLE
<br />120:3-A
<br />12. REQUIREMENTS FOR DUCTS AND PLENUMS PER 124 SEE
<br />M-0, NOTES AND SPECIFICATIONS
<br />13, MECHANICAL ACCEPTANCE TEST FORMS SUBMITTED AT
<br />END OF PROJECT PER SECTION 120:5, 1207 AND 120.8 -
<br />SEE T24 DRAWINGS FOR FORMS REQUIRED (1-17) TO BE
<br />SUBMITTED AT THE END OF THE PROJECT FOR EACH
<br />HVAC AND PLUMBING SYSTEM, AND FOR EACH HVAC AND
<br />PLUMBING PIECE OF EQUIPMENT,
<br />SYMBOL LEGEND
<br />SPEED
<br />g#1
<br />ABBREV.
<br />CONTROLLER AND
<br />GALVANIZED SHEET METAL
<br />RECTANGULAR DUCT SIZE
<br />DISCONNECT
<br />ABOVE FINISHED FLOOR
<br />100 WATT 120 10
<br />BDD, BS, SPEED
<br />8#
<br />BFF
<br />CONTROLLER AND
<br />LINED DUCT WITH INSULATION
<br />BFC
<br />DISCONNECT
<br />ABOVE FINSHED CEILING
<br />75 HP 115 10
<br />SEE CAPTIVEAIRE 1106#
<br />&aff2HM
<br />DRAWINGS
<br />13, It is the responslloillty of the Mechanical
<br />Contractor to coordinate the installation cf his
<br />work lncluding equipment substitutions with the
<br />other trades including but no limited to electrical,
<br />fire sprinkler, framing and plumbing,
<br />14 Insulate all ductwork per the T-24 energy
<br />requirements found In the T-24 coMpl'once report,
<br />All ductwork shall be tested for leaks with a
<br />maximum Static pressure in the duct of 1.01,
<br />maximum leakage shall not exceed 47 of the total
<br />supply and return air volumes,
<br />15, All economizer, thermostat and fan systems shall
<br />lop tested per T-24 for compliance with the T-24
<br />report and the appropriate forms indicated in the
<br />T-24 report shall loe provided and signed by the
<br />Contractor prior to project close out and the
<br />HERS reports loaded up to the appropriate CHEERS
<br />or CAL -Certs hosting Service,
<br />16. Contractor shall label all equipment withunique
<br />identification using plastic engraved plates with
<br />1/2" tall lettering indicating the equipment number
<br />and state the areas served by the equipment. See
<br />specifications on dwgs.
<br />17. Ali flex duct Will be Stretched as tight as possible
<br />and as per marufacturers fisting to avoid all kinks
<br />and sagging,
<br />18. All smoke detectors shall Toe tested as required
<br />with an approved smoke system per the City of
<br />Ripon's standards in the presence of the
<br />inspector or fire Marshall.
<br />19: All systems shall require an air balance report
<br />upon final inspection Submit reports or NEBS or
<br />NABC forms an independent certified air balance
<br />showing System has been 10atanced and OSA
<br />quantities set to that showr on drawings,
<br />20. Condensate drain lines installed in direct or
<br />indirect sunlight shall be UV resistant CPVC or
<br />PVC pipe and shall be painted to protect from UV
<br />radiation.
<br />21. Seal all joints and Seams with DP -1010 duct sealer,
<br />T-24 MECH AND PLUMBING MANDATORY FEATURES
<br />1. EQUIPMENT SHALL BE CERTIFIED TO MINIMUM
<br />EFFICIENCY PER SECTIDN 110.2 - SEE SCHEDULES ON
<br />M-0.
<br />2. HVAC CONTROLS AND EQUIPMENT CERTIFIED PER
<br />SECTI❑N 1202 FOR THERMOSTATS AND DDC CONTROLS --
<br />SEE DETAILS ON M0,
<br />3. SERVICE WATER HEATING SHALL COMPLY WITH SECTION
<br />110.3 ,
<br />4. USE OF PILOT LIGHTS ON HVAC, GAS COOKING POOL
<br />AND SPA HEATERS PROHIBITED PER SECTI❑N 110.5
<br />5. LAVATORIES SHALL BE SET TO MAINTAIN DISCHARGE
<br />TEMP AT 110QF OR LESS PER SECTION 1103 - SEE
<br />PLUMBING SCHEDULE
<br />6, VENTILATION REQUIREMENTS PER 120,1,b,c&d M-1 AIR
<br />BALANCE
<br />7, NATURAL VENTILATION PER 1201101 N/A
<br />8. CONTROLS SHALL MEET REQUIREMENTS PER 122, SLE
<br />M-0 AND NOTES,
<br />9: SHUT DOWN AND BACKDRAFT DAMPERS PER 122,E See
<br />schedules on M-0
<br />10 ISOLATION AREA DEVICES PER 122,g N/A
<br />11. PIPE INSULATION PER 120.3.g SEE NOTES, TABLE
<br />120:3-A
<br />12. REQUIREMENTS FOR DUCTS AND PLENUMS PER 124 SEE
<br />M-0, NOTES AND SPECIFICATIONS
<br />13, MECHANICAL ACCEPTANCE TEST FORMS SUBMITTED AT
<br />END OF PROJECT PER SECTION 120:5, 1207 AND 120.8 -
<br />SEE T24 DRAWINGS FOR FORMS REQUIRED (1-17) TO BE
<br />SUBMITTED AT THE END OF THE PROJECT FOR EACH
<br />HVAC AND PLUMBING SYSTEM, AND FOR EACH HVAC AND
<br />PLUMBING PIECE OF EQUIPMENT,
<br />SYMBOL LEGEND
<br />SYMBOL
<br />ITEM
<br />ABBREV.
<br />—
<br />GALVANIZED SHEET METAL
<br />RECTANGULAR DUCT SIZE
<br />—
<br />ABOVE FINISHED FLOOR
<br />AFF
<br />NET INSIDE DIMENSIONS
<br />BELOW FINISHED FLOOR
<br />BFF
<br />—
<br />LINED DUCT WITH INSULATION
<br />BFC
<br />CONDENSING UNIT
<br />ABOVE FINSHED CEILING
<br />SFE DRAWING FOR THICKNESS
<br />—
<br />&aff2HM
<br />FLEXfBLE SUPPLY DUCT, CLASS 1
<br />_x -X.---X--X-
<br />— — — —
<br />FLEXIBLE RETURN DUCT, CLASS 1
<br />FLEX DUCT TURNS TO BE 2.0 DUCT
<br />DUCTWORK EXISTINC
<br />VD - VOLUME DAMPER, REQUIRED
<br />NONE
<br />POINT OF CONNECTION
<br />F9 - FIRE DAMPER
<br />FOR
<br />VD
<br />FSD - FIRE SMOKE DAMPER
<br />FSD
<br />FURNISHED BY OTHERS
<br />CSFD - CEIL FIRE SMOKE DAMPER
<br />CSFD
<br />UP THROUGH ROOF
<br />MD DM - MOTORIZED DAMPER
<br />MD DM
<br />UNLESS OTHERWISE NOTED
<br />(JON
<br />— CCONDENSATE,
<br />OVERFLOW
<br />DUCTWORK - GI SPIRAL PIPE
<br />HWS
<br />HEATING WATER SUPPLY, RETURN
<br />TURNING VANES
<br />TV
<br />1 300
<br />FIRST LETTERCEILING
<br />CS -4
<br />12x12
<br />LOCATION: FLOOR
<br />®
<br />WALL
<br />CS -4 SECOND LETTER SUPPLY
<br />NATURAL GAS, LPG LINE
<br />SERVICE:
<br />1
<br />0NUMBER-TYPE:
<br />RETURN
<br />EXHAUST
<br />ATR
<br />SEE SCHED.
<br />CR --1
<br />300 - CFM, CUBIC FEET PER MINUTE
<br />—
<br />12x12 _ GRILLE NECK SIZE IN INCHES
<br />21
<br />PROVIDE VD'S AT ALL WYLS AND TAPS
<br />DUCT TEMPERATURE SENSOR
<br />SUPPLYING GRILLES AND REGISTERS FOR
<br />CE -1
<br />AIR BALANCING PER T-24.
<br />l�
<br />THERMOSTAT, UNIT NO.
<br />—
<br />BYPASS, NITESTAT, CLOCK
<br />—
<br />S
<br />ABBREVIATIONS W/OR WO SYMBOLS
<br />STEAM CONDENSATE
<br />—
<br />WITH
<br />W/
<br />—
<br />WITH OUT
<br />WO/
<br />—
<br />RTU -
<br />DOWN
<br />DN
<br />—
<br />GALVANIZED SHEET METAL
<br />GI
<br />—
<br />ABOVE FINISHED FLOOR
<br />AFF
<br />—
<br />BELOW FINISHED FLOOR
<br />BFF
<br />—
<br />BELOW FINISHED CEILING
<br />BFC
<br />CONDENSING UNIT
<br />ABOVE FINSHED CEILING
<br />AEG
<br />—
<br />NEW DUCTWORK
<br />_x -X.---X--X-
<br />DEMOLITION TO BE REMOVED
<br />TBR
<br />FLEX DUCT TURNS TO BE 2.0 DUCT
<br />DUCTWORK EXISTINC
<br />(E)
<br />DIAMETER
<br />POINT OF CONNECTION
<br />POC
<br />AT CEILING SYSTEM
<br />CUT OFF POINT
<br />COP
<br />—
<br />FURNISHED BY OTHERS
<br />FBO
<br />—
<br />UP THROUGH ROOF
<br />UTR
<br />—
<br />UNLESS OTHERWISE NOTED
<br />(JON
<br />— CCONDENSATE,
<br />OVERFLOW
<br />C, OF
<br />HWS
<br />HEATING WATER SUPPLY, RETURN
<br />HWS,HWR
<br />CHWS—
<br />CHILLED WATER SUPPLY, RETURN
<br />CHWS,CHWR
<br />—
<br />MACHINE BOLT
<br />MB
<br />G,LPG
<br />NATURAL GAS, LPG LINE
<br />G LPG
<br />SCREWS THRU OUTLET FLANGE To
<br />ALL THREAD ROD
<br />ATR
<br />—
<br />OUTSIDE AIR
<br />OSA
<br />—
<br />FEET PER MINUTE
<br />FPM
<br />WIRES ATTACHED TO STRUCTURE
<br />DUCT TEMPERATURE SENSOR
<br />DTS
<br />—
<br />FLEXIBLE DUCT CONNECTOR
<br />FC
<br />--
<br />FLEX DUCT
<br />—
<br />STEAM PIPE
<br />S
<br />—
<br />STEAM CONDENSATE
<br />Sc
<br />—
<br />MAKEUP WATER
<br />CW
<br />I>4
<br />SHUT OFF/BALL VALVE
<br />BV
<br />- -
<br />DUCT SMOKE DETECTOR
<br />DSD
<br />NON --STANDARD ABBREVIATIONS:
<br />RTU -
<br />ROOF TOP UNIT
<br />HPFC
<br />- HEATPUMP FAN COIL
<br />SCHPFC
<br />- SELF CONTAINED HEAT
<br />DUCT LENGTH IS 3'2' SO THAT ALL
<br />PUMP FAN COIL
<br />CEF -
<br />CEILING EXHAUST FAN
<br />REF -
<br />ROOF EXHAUST FAN
<br />OHP -
<br />OUTDOOR HEAT PUMP
<br />CU -
<br />CONDENSING UNIT
<br />FC -
<br />FAN COIL
<br />CAL GREEN NOTES HVAC
<br />1, ALL DUCT SHALL BE DELIVERED TO JOBSITE CAPPED AND
<br />SEALED TO PREVENT DIRT AND DEBRIS FROM ENTERING
<br />DUCTWORK,
<br />2. ALL DUCT SHALL SEALED AT THE END OF EACH DAY TO PREVENT
<br />DIRT AND DEBRIS FROM ENTERING DUCTWORK, KEEP ALL
<br />REGISTER CONNECTIONS TAPED SHUT.
<br />3, INSTALL 50Y. MERV 6 FILTERS IN EACH RETURN AIR GRILLE IF
<br />UNITS ARE TO BE RUN BEFORE FINAL OCCUPANCY, FILTERS
<br />SHALL REMAIN IN PLACE UNTIL BUILDING CERTIFICATE OF
<br />OCCUPANCY IS RECEIVED,
<br />4. ALL HVAC REFRIGERANT LINES SHALL BE INSTALLED PER
<br />SECTION 5,508,2,1 OF THE CAL GREEN CODE (IL THE 2016 CMC),
<br />CONTRACTOR SHALL SUBMIT MANUFACTURER'S DATA SHEETS
<br />SHOWING COMPLIANCE WITH THIS SECTION TO THE GENERAL
<br />CONTRACTOR:
<br />208v 30
<br />W/GROUND
<br />WIRE
<br />I I I
<br />FUSED DISC BY _
<br />ELECTRICAL
<br />CONTRACTOR 1
<br />LINE
<br />RTIJ_
<br />RH G Y1 Y2 Wl W2 C
<br />LJ
<br />RC RH G Yl Y2 W1 W2 C
<br />HONEYWELL VISIONPR❑ 8000 WITH
<br />AUTOMATED DEMAND RESPONSE
<br />FUNCTION SERIES Y AND W
<br />TERMINALS TO MATCH UNITS
<br />---
<br />--LINE VOLTAGE WIRING BY EC
<br />LINE VOLTAGE WIRING BY MC
<br />LOW VOLTAGE WIRING BY MC
<br />NOTE APPLIES TO ALL DETAILS
<br />THERMOSTAT
<br />DETAIL
<br />POSITIVE FL
<br />WEATHERTOP
<br />C❑UNTERFLAS
<br />1' CLEAR SPS
<br />BETWEEN JAI
<br />FLUE/DUCT
<br />FINISH ROOF
<br />UP JACK ANI
<br />UNDER COUN-
<br />ROOF JACK -
<br />NAIL TO ROD
<br />4-2'10d NAIL
<br />SEE STRUCT
<br />FOR TRUSSES
<br />2x BLOCKING
<br />FLUE OR ROL
<br />EXH, DUCT
<br />120v 10
<br />W/GROUND
<br />WIRE
<br />EC❑N LOGIC
<br />IT BOARD
<br />RMR !
<br />I
<br />I 1
<br />DSD, SD
<br />AIR PRODUCTS SL 2000
<br />PHOTELECTRIC SMOKE
<br />DETECTOR
<br />NC �e•�•
<br />FIREX REMOTE
<br />TEST SWITCH
<br />AND LED'S GRN LED 0
<br />RED LED
<br />HORN/STROBE p R
<br />RESET 0
<br />AIR; PRODUCTS
<br />MS-RH/KA/P/AT
<br />4-12"0 DUCT THRU ROUT
<br />DETAIL
<br />RTU -
<br />GASKET - USE MANUFACTURER'S
<br />SUPPLIED WITH CURB -
<br />12 GA ANGLE CLIP - ATTACH
<br />TO CURB W/3#10x1' SM SCREWS
<br />TO UNIT W/#10x1' SM SCREWS
<br />CLIP TO BE 6'MIN LONG: 2 EA
<br />LONG SIDE OF UNIT AT CORNERS
<br />26 GA GI
<br />C❑UNTERFLASHING^�
<br />(E)RTU- MANUFACTURER'S ROOF CURB
<br />14' MIN HT, 18 MIN CONSTRUCTION
<br />CURB INSTALLED AS PART OF SHELL
<br />PERMIT
<br />SEAL AIRTIGH-
<br />SHEET METAL DUC
<br />W/1' 6.2R LINER
<br />RTU -8 ATTACHMENT TO CURB
<br />DETAIL
<br />CL
<br />208V, 240V SYSTEM
<br />DISCCINNECT (42' FOR 480V
<br />SYSTEM)
<br />ELECTRICAL PANEL UR UNIT
<br />DISCONNECT
<br />DEDICATED CLEAR
<br />UNOBSTRUCTED WORKING SPACE
<br />IN FRONT DF PANEL,
<br />FLOOR/R❑❑F TO STRUCTURAL
<br />MEMBER ABOVE PER NEC110--16 &
<br />384-4. VERIFY ALL POSSIBLE
<br />CONFLICTS WITH OTHER TRADES
<br />PRIOR TO ROUGHING IN THE
<br />PANEL BOARD OR DISCONNECT:
<br />ELECTRICAL PANEL/DISCONNECT
<br />DETAIL
<br />WYE/ELBOW/SAMCNA DUCT SUPPORT
<br />LOW LOSS T' 'A' OR 'B'
<br />FITTING] -BEL❑W
<br />VD- � 5' MA� t LEX
<br />CS.- 4A -1, _.DS -1 YZ FURNISH AT ALL SUPPLY
<br />TITUS OR REGISTERS IN WYE OR TAP,
<br />EQUAL, WHITE DAMPER SHALL HAVE
<br />FINISH, NO OBD, LOCKING QUADRANT ON 1'
<br />SIZE AS INDICATED STANDOFF, 3/8'0 DIAMETER
<br />ON FLOOR PLANS SHAFTS,
<br />PLYWOOD/SKIP
<br />SHEETING ROOF
<br />ATTACH TO (E) JOISTS
<br />WITH 1--#10x1-1/2'
<br />2x2x1.: _�IVGLE FASTAP SCREW,
<br />-- -
<br />-ATTACH TO J❑IST -`
<br />W/2 -1/4'0x2' LAGS
<br />EMBED 1-1/2' MIN °
<br />DOUBLE NUTTED ALL DUCT STRAP
<br />PER CMC"!_7
<br />THREAD ROD WITH °
<br />SQ 1-3'x1-h'x6'
<br />WASHER TO SUPPORT
<br />STRAP
<br />1-h'x24 GA
<br />BELLY BAND
<br />AROUND PIPE
<br />'A' DUCT SUPPORT
<br />PLYW❑OIJ/SKIP
<br />SHEETING ROOF 2x2xj' ANGLE
<br />- ATTACH TO
<br />-- - 1 - ==1: -
<br />JOIST/TRUSS
<br />``�W/ R'xl-1/2'
<br />LAG BOLT -
<br />h J FMBED 1' MIN
<br />3/8'x2" LAG BOLT DOUBLE NUTTED ALL
<br />EMBED PINT❑ THREAD ROD W:TH SQ
<br />JOIST/TRUSS 1 j'xl-�'x6' WASHER
<br />1-J'xl-1h'x1a GA TO SUPPORT STRAP
<br />SEISMIC BRACE
<br />-LOCATE EVERY 40' 1-'x24 GA BELLY
<br />AND AT CHANGES IN BAND AROUND PIPE
<br />DIRECTION OF PIPE - DUCT IS EXPOSED
<br />LATERAL BRACE 80'
<br />❑C AND AT CHANGE
<br />LATERAL BRACE OF DIRECTION
<br />40' ❑C AND AT
<br />CHANGE OF
<br />DIRECTION I -
<br />'B' SEISMIC ANCHORAGE DETAIL
<br />DUCT DUPPORTS
<br />D ETAI L
<br />FLEX DUCT TO MAIN RUN TO BE
<br />MIN 312' LENGTH S❑ THAT THE
<br />DUCT SIZE AND INSULATION
<br />VALUE IS SHOWN ON ALL DUCTS
<br />AND MAX LENGTH TO BE 10'0' FOR
<br />OSHPD AND 5'0' FOR ALL OTHERS.
<br />12' GI DUCT EXTENSION
<br />AB❑VE CEILING
<br />INSULATION, FLEX
<br />DUCT TO MAIN RUN
<br />f24 GAUGE GI REGISTER
<br />CAN
<br />SCREW CAN To
<br />BLOCKING - 4 TOTAL
<br />REGISTER - SEE PLAN
<br />FOR SIZES - PROVIDE
<br />1/2' SOUND LINER IN
<br />REGISTER CAN
<br />CEILING REG DETAIL
<br />DETAIL
<br />JOB # 2019-018
<br />GDMD ENGINEERING, INC
<br />Mechanical and Safety Engineers
<br />212 W Pine St, Ste 4
<br />Lodi, Ca 95242
<br />Ph 209-357-0899
<br />Fax 209-367-0898
<br />E-mail:gdmdengrinc@sbcglobal.net
<br />dpi COPYRIGHT 2019
<br />REVISIONS
<br />Q PLANCHECK #1 - XX/XX/XX
<br />THIS DOCUMENT, AND THE IDEAS AND DESIGNS
<br />INCORPORATED HEREIN, AS AN INSTRUMENT OF
<br />PROFESSIONAL SERVICE, 15 THE PROPERTY OF
<br />"opl" AND IS NOT TO BE USED, IN WHOLE OR IN
<br />PART, FOR ANY OTHER PROJECT WITHOUT
<br />WRITTEN AUTHORIZATION.
<br />PLANNING ■ ■ ■
<br />ARCHITECTURE ■ ■
<br />ARCHITECTURE PLUS INC.
<br />4335-B NORTH STAR WAY
<br />MODESTO, CA 95356
<br />ph. 209.577.4661
<br />fx. 209.577.0213
<br />www.aplarc.com
<br />FRANK C. BOOTS
<br />JOSEPH L. SMITH
<br />RODNEY C. ALONZO
<br />ARCHITECTS
<br />uj
<br />W .j
<br />0a
<br />= 0
<br />W IlX
<br />ix
<br />Z W
<br />L
<br />W
<br />N
<br />N
<br />N
<br />/�\ ON A(G. FA
<br />O � ,
<br />A
<br />a
<br />U
<br />0
<br />+tL
<br />DATE :
<br />2'x24 GA GI DUCT SUPPORT STRAP
<br />JOB NO.:
<br />18115
<br />WITHIN 2' ❑F REGISTER - MIN FLEX
<br />G. DAVIS
<br />CHECKED :
<br />DUCT LENGTH IS 3'2' SO THAT ALL
<br />DUCTS SHALL DISPLAY THE DUCT
<br />IZE AND INSULATION VALUE AND
<br />MAX LENGTH IS 10' FOR OSHPD, 5'0'
<br />FOR ALL OTHERS ALL ELBOW
<br />RADIUS'S TO BE 1,5 DUCT DIAMETER,
<br />FLEX DUCT TURNS TO BE 2.0 DUCT
<br />DIAMETER
<br />AT CEILING SYSTEM
<br />-
<br />AIR OUTLET - WT<1011#
<br />#7 SM SCREW OR 41112
<br />GA SLACK WIRE ON
<br />OPPOSITE CORNERS
<br />NOTE:
<br />SECURE CEILING OUTLET TO S.A,T,
<br />-_
<br />CEILING GRID WITH (2) #10x1/2' S/M
<br />SCREWS THRU OUTLET FLANGE To
<br />GRID RUNNER AND AT DIAGONAL
<br />- CORNERS INSTALL (2) #12 GA: SLACK
<br />WIRES ATTACHED TO STRUCTURE
<br />ABOVE USING CLOSED LOOP EYEBELTS,
<br />WIRE AND SCREWS ARE REQUIRED ON
<br />ALL REGISTERS.
<br />T -BAR
<br />REGISTER
<br />3
<br />DETAIL
<br />AAfS
<br />JOB # 2019-018
<br />GDMD ENGINEERING, INC
<br />Mechanical and Safety Engineers
<br />212 W Pine St, Ste 4
<br />Lodi, Ca 95242
<br />Ph 209-357-0899
<br />Fax 209-367-0898
<br />E-mail:gdmdengrinc@sbcglobal.net
<br />dpi COPYRIGHT 2019
<br />REVISIONS
<br />Q PLANCHECK #1 - XX/XX/XX
<br />THIS DOCUMENT, AND THE IDEAS AND DESIGNS
<br />INCORPORATED HEREIN, AS AN INSTRUMENT OF
<br />PROFESSIONAL SERVICE, 15 THE PROPERTY OF
<br />"opl" AND IS NOT TO BE USED, IN WHOLE OR IN
<br />PART, FOR ANY OTHER PROJECT WITHOUT
<br />WRITTEN AUTHORIZATION.
<br />PLANNING ■ ■ ■
<br />ARCHITECTURE ■ ■
<br />ARCHITECTURE PLUS INC.
<br />4335-B NORTH STAR WAY
<br />MODESTO, CA 95356
<br />ph. 209.577.4661
<br />fx. 209.577.0213
<br />www.aplarc.com
<br />FRANK C. BOOTS
<br />JOSEPH L. SMITH
<br />RODNEY C. ALONZO
<br />ARCHITECTS
<br />uj
<br />W .j
<br />0a
<br />= 0
<br />W IlX
<br />ix
<br />Z W
<br />L
<br />W
<br />N
<br />N
<br />N
<br />/�\ ON A(G. FA
<br />O � ,
<br />A
<br />a
<br />U
<br />0
<br />+tL
<br />DATE :
<br />JANUARY 2019
<br />JOB NO.:
<br />18115
<br />DRAWN:
<br />G. DAVIS
<br />CHECKED :
<br />G. DAMS
<br />SHEET:
<br />
|