Laserfiche WebLink
KEY NOTES GENERAL EROSION CONTROL N <br /> / TES <br /> O INSTALL FIBER ROLL, SEE DETAIL 1,THIS SHEET. ""''` i€el evl0ae <br /> • _ - _. <br /> 1. PROHIBITION OF MOST NON-STORM WATER DISCHARGESLL <br /> ONLY STORM WATER FROM THE PROJECT SITE SHALL BE ALLOWED TO FLOW INTO THE PUBLIC <br /> O INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCEIEXIT PIER CALTRANS STORMWATER STREET SYSTEM. CLEAN, NON-CHLORINATED WATER FROM THE FLUSHING OF FIRE HYDRANTS, <br /> / WATER MAINS,AND STORM DRAINS MAY BE DISCHARGED TO THE STREET IF IT IS NOT ALLOWED TO <br /> BEST MANAGEMENT PRACTICE HANDBOOK(BMP} DETAIL TC-1. _ <br /> / COLLECT DIRT, DEBRIS AND TRASH WHILE FLOWING TO THE STREET. <br /> e:°w�..�Vie.s `I :.m.�; ;:.m�•��° '' <br /> I O INSTALL TEMPORARY GRAVEL BAG STORM DRAIN INLET PROTECTION PER CALTRANS 2. SOURCES OF STORM WATER POLLUTANTS <br /> STORMWATER BMP DETAIL SC-14. STORM WATER POLLUTANTS INCLUDE SOIL SEDIMENT AND NUTRIENTS,OIL, GREASE, TOXIC <br /> • / POLLUTANTS, HEAVY METALS, PAINT,AND STUCCO.SOURCES OF STORM WATER POLLUTANTS '•�`" I?°°� I°~a°g�ia°aa��` ��°'�'':�`''':_=''°<I <br /> 4 INSTALL TE P INCLUDE SOIL EROSION BY WATER AND/OR WIND; CLEARING OF VEGETATION; GRADING VEHICLE <br /> M ORARY VEHICLE AND EQUIPMENT CLEANING AREA F'ER CALTRANS STORMWA _............. ......... <br /> TER <br /> BMP DETAIL NS-8MIXERSAND EQUIPMENT REFUELING AND MAINTENANCE;WASHING OF CONCRETE TRUCKS, MIXERS AND a...r. c.,.,.h° i.•.,t,a cF t u r e <br /> . HANDLING REQUIREMENT; , ,ADHESIVES; LANDSCAPING WORK; ROOFING AND <br /> PAINTSSOLVENTSe n g i n e e r i n g <br /> / BUILDING MATERIALS;AND PETROLEUM PRODUCTS, <br /> / O INSTALL TEMPORARY CONCRETE WASTE MANAGEMENT AREA PER CALTRANS STORMWATER BMP JJ-1B � .�ssociafes� Ltd./ DETAIL V11M-8. 3. EROSION AND SEDIMENT CONTROLS <br /> / <br /> / A. COVER EXPOSED STOCKPILES OF SOILS, CONSTRUCTION MATERIALS,AND LANDSCAPING <br /> / <br /> MATERIALS WITH HEAVY PLASTIC SHEETING' 867 Pacific Street, Suite 120 <br /> / B. IN LANDSCAPING AREAS WHERE THE VEGETATION HAS NOT ESTABLISHED GROWTH AND TAKEN San Luis c Street, <br /> CA Suite <br /> 12 <br /> HOLD, CONSTRUCT SANDBAG OR DIRT BERM'S OR SILT FENCES AROUND THEIR PERIMETER TO <br /> / ENSURE THAT WATER WILL BE CONTAINED INSIDE THE LANDSCAPING AREA AND THAT IT WILL ph 805.540.5244 <br /> NOT BE CONVEYED TO A STORM DRAIN INLET. fax 805.540.5241 <br /> + C. RE-VEGETATE AREAS WHERE LANDSCAPING HAS DIED OR NOT TAKEN HOLD www.LHBassoc.com <br /> / D. DIVERT STORM WATER RUNOFF AROUND DISTURBED SOILS WITH BERM'S OR DIRT SWALES. <br /> D / 4, OTHER CONTROLS <br /> O A, WASTE DISPOSAL <br /> / 0 1. KEEP SOLID WASTE DISPOSAL CONTAINERS COVERED TO PREVENT ENTRY OF STORM <br /> / WATER. PROF ESS/0 <br /> P2. PROVIDE FOR THE WEEKLY(OR MORE FREQUENT,AS NECESSARY) DISPOSAL OF WASTE <br /> 3 O <br /> / CONTAINERS. �'C S B�7q <br /> 3, PROVIDE CONTAINERS AT CONVENIENT LOCATIONS AROUND THE SITE. <br /> O c- <br /> B. SWEEPING OF SITE il_� <br /> No,78918 <br /> / 1. PROVIDE WEEKLY(OR MORE FREQUENT,AS NECESSARY)SWEEPING BY HAND OR <br /> Q ' <br /> � � 1 MECHANICAL MEANS TO KEEP THE PAVED AREAS OF THE SITE FREE OF DUST, DIRT,AND exp. 43118 <br /> DEBRIS. <br /> 2. DISPOSE OF ACCUMULATED DIRT IN WASTE CONTAINERS, OR HAUL IT OFF THE SITE TO A <br /> / LANDFILL. �2 Q <br /> 3 C <br /> PORTABLE TOILETS AND OTHER SANITARY FACILITIES SHALL BE SERVICED WEEKLY(OR MORE 0 CA <br /> SANITARY SEPTIC L�FQ <br /> FREQUENT,AS NECESSARY)AND PUMPED CLEAN BY A WASTE DISPOSAL COMPANY, NO TOXIC <br /> SANITARY HAZ RDSOUS WASTES SHALL BE DISPOSED OF IN A PORTABLE TOILET OR IN THE OWS7E <br /> "- LL D. SPILLS <br /> 1. STORE ADEQUATE ABSORBENT MATERIAL, RAGS, BROOMS, SHOVELS,AND WASTE CONSULTANTS <br /> o CONTAINERS ON THE SITE TO CLEAN-UP SPILLS OR MATERIALS SUCH AS FUEL, PAINT <br /> SOLVENTS, OR CLEANERS. EAN UP MINOR SPILLS• c 2. FOR REPORTABLE QUANTITES OF A HAZARDOUS OR IMMEDIATELY. <br /> SUBSTANCES,SECURE THE <br /> SERVICES OF QUALIFIED PERSONNEL FOR CLEAN-UP AND DISPOSAL. <br /> 3 E. CONTROL OF ALLOWABLE NON-STORM WATER DISCHARGES <br /> LANDSCAPING IRRIGATION, EROSION CONTROL MEASURES, PIPE FLUSHING AND TESTING <br /> I PAVEMENT WASHING,AND DE-WATERING ARE ALLOWED IF THEY CANNOT FEASIBLY BE <br /> I 4 a ELIMINATED, COMPLY WITH THIS PLAN, DO NOT CAUSE OR CONTRIBUTE TO A VIOLATION OF <br /> WATER QUALITY STANDARDS,AND ARE NOT REQUIRED TO BE PERMITTED BYTHE LOCAL <br /> i a a <br /> REGIONAL WATER QUALITY CONTROL BOARD. <br /> o F. VEHICLES AND EQUIPMENT <br /> n Q <br /> 1. FIX LEAKS OF FUEL, OIL,AND OTHER SUBSTANCES IMMEDIATELY, <br /> 2. PERFORM REFUELING AND SERVICE OF VEHICLES OR EQUIPMENT OFF-SITE WHEN <br /> / <br /> POSSIBLE. IF REFUELING OR SERVICE OF EQUIPMENT IS PERFORMED ON-SITE, THEN <br /> a 4 <br /> PROVIDE AN IMPERVIOUS,CONTAINED AREA WHERE ANY SPILLS CAN BE CONTAINED <br /> / 4 4 <br /> / a ° WITHOUT FLOWING 70 A STORM WATER INLET OR INTO THE GROUND. <br /> a 3. USE DRIP PANS 70 CATCH LEAKS AND SMALL SPILLS. <br /> G. CONCRETE TRUCKS, MIXERS,AND HAULING EQUIPMENT <br /> 4 5 1, DISPOSE OF WASHOUT FROM THE WASHING OF CONCRETE TRUCKS AT ASSIGNED <br /> WASHOUT AREAS. <br /> / ° a 2. PROVIDE A HOLDING TANK TO RECEIVE ANY WASHOUT FROM CONCRETE EQUIPMENT, <br /> l a a DISPOSAL OF TANK CONTENTS SHOULD BE CONDUCTED BY A WASTE HAULING FIRM. <br /> 3, PROVIDE A DESIGNATED AREA FOR WASHING ANY VEHICLES OR EQUIPMENT; DRAINAGE <br /> FROM THIS AREA SHOULD FLOW TO THE HOLDING TANK. <br /> .! 4 <br /> H. LANDSCAPING OPERATIONS <br /> 1. USE ONLY THE MINIMUM AMOUNT OF LANDSCAPING FERTILIZERS, NUTRIENTS,AND OTHER <br /> CHEMICALS THAT a <br /> 4 RE NEEDED <br /> 2. DO NOT OVER WATAER FERTILIZED OR TREATED LANDSCAPE AREAS, MINIMIZE RUNOFF OF <br /> 4 Q 4 I. STORM WATER IRRIGATIOnINLETS <br /> 2 WATER FROM LANDSCAPING.KEEP ALL ON-SITE STORM WATER INLETS CLEAN AND FREE OF DIRT SILT,AND DEBRIS, C. IN <br /> r THE EVENT THAT SEDIMENT AND DEBRIS MAY FLOW TO AN INLET, PRTREVISIONS PLAN CHECK#16-3684OVIDE A 6-INCH(MINIMUM} 1 <br /> SANDBAG BERM AROUND THE INLET TO TRAP THE DIRT AND DEBRIS AND ALLOW ONLY CLEAN 07 DECEMBER 2416 <br /> STORM WATER TO ENTER THE INLET(EROSION CONTROL PLAN). <br /> a <br /> / / 4 5 UINTERVAL INSPECTION INSPECTION EN <br /> El A REGULAR ON AND INSPECTION BEFORE AND AFTER STORM <br /> 4 1. VISUALLY INSPECT THE SITE WEEKLY TO ENSURE THAT STORM WATER INLETS ARE FREE <br /> OF DIRT AND DEBRIS. <br /> I a a <br /> 2. BEFORE A STORM, INSPECT THE 517E TO ENSURE THAT STORM WATER POLLUTION <br /> o t� CONTROL MEASURES ARE IN PLACE. <br /> / a 3, AFTER A STORM, INSPECT ALL STORM WATER INLETS TO ENSURE THAT THEY ARE CLEAR <br /> OF DIRT AND DEBRIS. CLEAN THE STORM WATER INLETS THAT ARE NOT CLEAR AND FREE <br /> OF 3 <br /> 4 4, THE REGIONAL WATER BOARD MAY REQUIRE THE DISCHARGER TO CONDUCT ADDITIONAL <br /> I ° SITE INSPECTIONS, SUBMIT REPORTS AND CERTIFICATIONS, OR TO PERFORM SAMPLING <br /> O O AND ANALYSIS. <br /> SUBMITTAL DATES <br /> v r O I I 5 THE DISCHARGER <br /> TRUCT ON SITE PRIOR TO ANTICIIPATED STTORM IS REQUIRED TO EUCT OVENTS AND AF <br /> N OF THE <br /> CONSTER ACTUAL STORM O OWNER:f EVENTS TO IDENTIFY AREAS CONTRIBUTING TO A STORM WATER DISCHARGE AND TO <br /> � rx EVALUATE WHETHER MEASURES TO REDUCE POLLUTANT LOADINGS IDENTIFIED IN THE 03/29/2016 <br /> LL SWPPP ARE ADEQUATE AND PROPERLY IMPLEMENTED IN ACCORDANCE WITH THE TERMS <br /> �O I OF THE GENERAL PERMIT AND WHETHER ADDITIONAL CONTROL PRACTICES ARE NEEDED. REG. AGENCIES <br /> 71 <br /> / I r Q�P� �� 6. NTROLS <br /> AAI OMAINTENANCE AND REPAIR -- <br /> ?�� O.T.B.: <br /> ALL CONTROLS AND MEASURES INDICATED ON THIS PLAN SHOULD BE MAINTAINED IN GOOD <br /> AND EFFECTIVE CONDITION BY THE CONTRACTOR. IF ANY CONTROL OF MEASURES ARE -- <br /> f DAMAGED OR REMOVED, THEY SHOULD BE PROMPTLY REPAIRED OR RESTORED. <br /> OQ B. PLAN REVISIONS <br /> rQ� s I IF CONSTRUCTION ACTIVITY OR CONDITIONS CHANGE FROM THOSE SHOWN IN THIS PLAN THEN PROJECT NO, <br /> w THIS PLAN SHOULD BE REVISED TO REFLECT THE CURRENT CONDITIONS. 15-13-001 <br /> FINAL STABILIZATION AND POST-CONSTRUCTION CONTROLS <br /> 3 A. AFTER CONSTRUCTION HAS BEEN COMPLETED, THE SITE SHALL BE SWEPT CLEAN, STORM DRAWN BY. <br /> WATER INLETS(GRATES AND BASIN)SHALL BE CLEANED,AND ALL WASTE AND LEFTOVER AFS <br /> 0 11 MATERIALS SHALL BE REMOVED FROM THE SITE. CHECKED BY: <br /> B. ALL LANDSCAPING AND PLANTING AREAS SHOULD BE WELL MAINTAINED TO PREVENT EROSION. <br /> AVOID OVER-WATERING OF LANDSCAPING. ARB <br /> C. ALL PAVED AREAS SHOULD BE SWEPT WEEKLY EITHER BY HAND OR BY MECHANICAL MEANS TO <br /> KEEP THE SITE CLEAR OF DIRT, DUST,AND DEBRIS. <br /> w D. WASTE MATERIALS ON-SITE SHOULD BE STORED IN COVERED CONTAINERS WHICH ARE <br /> m CLEANED OUT REGULARLY. <br /> W — E TESTING OF FIRE HYDRANTS ON-SITE SHALL NOT BE CONDUCTED UNTIL THE AREA WHERE THE <br /> WATER DISCHARGES HAS BEEN SWEPT CLEAN OF DIRT AND DEBRIS. <br /> L.Lr F STOARRM O RAIN LINES SHOULD BE CHECKED AND CLEANED ANNUALLY TO KEEP THEM CLEAN AN <br /> G, ALL ON-SITE STORM WATER INLETS SHOULD BE CLEARLY MARKED WITH 4"BLUE LETTERS ON <br /> WHITE FIELD"STORM WATER ONLY,THIS DRAINS TO THE OCEAN", <br /> BOJ ~� �'� 8. ALL CONSTRUCTION ACTIVITIES INCLUDING GRADING,VEGETATION REMOVAL,STOCKPILING, <br /> EQUIPMENT STORAGE ETC. SHALL REMAIN OUTSIDE OF THE 20-FOOT CREEK SETBACK LINE AT ALL <br /> V J f Q0�Q�' TIMES UNLESS AN EXCEPTION FOR SUCH CONSTRUCTION HAS BEEN APPROVED BY THE c j <br /> COMMUNITY DEVELOPMENT DEPARTMENT.THE GREEK SETBACK LINE SHALL BE ESTABLISHED BY M0 s" THE CITY'S NATURAL RESOURCE MANAGER AND MARKED IN THE FIELD.THE SETBACK AREA SHALL Uj <br /> Z BE FENCED WITH ORANGE CONSTRUCTION FENCING,AND SHALL BE IN PLACE PRIOR TO THE W <br /> O �p BEGINNING OF CONSTRUCTION AND THROUGHOUT THE DURATION OF CONSTRUCTION. < Q <br /> co <br /> Q ��� ���� ®� EROSION CONTROL NOTES w Q <br /> r' L <br /> 1vC11 1. EROSION CONTROL MEASURES SHALL BE IMPLEMENTED AND MAINTAINED TO THE SATISFACTION OF <br /> � s:�^�;�{ii��.:I � � ' ..�.��? ,°.� ?i.. ,`,.-. ..'t °:L3�. ;,i <br /> �' THE BUILDING OFFICIAL AND PUBLIC WORKS DIRECTOR DURING ALL DEMOLITIONS, CONSTRUCTION V <br /> 0 $ AND GROUND DISTURBING ACTIVITIES. <br /> 2. THE CONTRACTOR SHALL PROVIDE DUST CONTROL DURING ALL PHASES OF THE WORK AND SHALL < L} <br /> s' MAINTAIN TO THE SATISFACTION OF THE CITY OF MANTECA. W <br /> Q H <br /> 3. PROVIDE EROSION CONTROL PLANTING FOR ALL FRESH CUT AND FILL SLOPES AND ON ALL Z <br /> a DISTURBED SURFACES OTHER THAN PAVED OR GRAVEL SURFACES. PERMANENT VEGETATION Q <br /> i O w SHALL BE ESTABLISHED PRIOR TO FINAL INSPECTION, 2 <br /> ° 4. CONTRACTOR SHALL BE RESPONSIBLE FOR THE PLACEMENT AND MAINTENANCE OF ALL EROSION <br /> _n S CONTROL DEVICES AS SPECIFIED BY THE CITY ENGINEER. THESE DEVICES SHALL BE IN PLACE OR <br /> X BE READY TO PLACE. IN THE EVENT THAT THE DEVICES ARE NOT PERMANENTLY IN PLACE THEY <br /> EMERGENCYSHALL BE PLACED IN THE EVENT A FORECAST FOR RAIN EXCEEDS 30%. AN EMERGENCY CREW <br /> � SHALL BE AVAILABLE 24 HR.A DAY IN THE EVENT AN EROSION PROBLEM SHOULD OCCUR. A <br /> RESPONSIBLE PERSON AND HIS RHONE NUMBER SHALL BE NAMED HERE UPON. <br /> AE <br /> �./ <br /> PHONE NUMBER <br /> LL5. THE ADJOINING STREET SHALL BE CLEANED BY SWEEPING TO REMOVE DIRT, DUST, MUD AND <br /> a CONSTRUCTION DEBRIS AT THE END OF EACH DAY, <br /> 6. L DISTURBED SURFACES SLOPED FOUR HORI <br /> a <br /> _. ...__. _. . . -,_,.... ,. _. .. -, �.... _ .. AL(4:1 AND GREATER AND <br /> SHEET TITLE <br /> AREAS USED TO CONVEY CONCENTRATED D <br /> � ..:.. ...... .._, ..::., ......-__ ....., .. ._,.,,_ _:...,.... _ . .. _,.._ _ ,..., , :.: .:... . . , .. .. ..._ _ _,, .. _.;; 3! �, P DRAINAGE PREPARED <br /> 4x2 x2'WOOD STAKE AND MAINTAINED TO <br /> � ,.... ._ . _. __..._ __::.: .......... . ... ... ... ._ _ . .._. _. _, . . ,. _ ., ��. CONTROL EROSION BY EFFECTIVE PLANTING TO BE COMP <br /> LETED NO LATER THAN 34 DAYS PRIOR <br /> A REQUEST F O ti <br /> OR FINAL INSPECTION APPROVAL. <br /> � ,,.,. _.__ , .._: __, .. _ ._.. _..:, .. .... ..... . ..... . ...... . . .. .. ._ ,, ...... ._ .. , , . .. _ - ,. __ .... ..,_.:. .. _. _,.. _.._... <br /> (2" <br /> DRIVING <br /> EXPOSED AFTER <br /> _..__. ,..,.,. ._.. ..... . . . ... __. . .__. . ._.. . ,, . ...:::_ DRIVINGSTAK <br /> E MPORARY EROSION CONTROL MEASURES SHALL BE RE <br /> IMPROVEMENTS PLANTINGS, <br /> � _ _.. .. _ ..._ _... ._, _.,.. .... ,.. :: ._. .. _, .. _ . . ,.: .:. . ...,, FACILITIES ARE IN PLACE. TEMPORARYMEASURES <br /> SHALL BE <br /> AND <br /> REMOVED PRIOR TO FINAL INSPECTION_. ;,::. r., ,. 9 x2 L C ON APPROVALS- <br /> .,. ;. ,., , . . . .,.. _ ,,,. <br /> _ O 5 FIBER ROLL � <br /> ' - -- ALL PERI <br /> I METER PROTECTIONSv <br /> LE. SILT FEN <br /> ARE <br /> CONSIDERED PHASE ON <br /> n - ,.,.. / CONTROLS AND SHALL <br /> A .. ,, .. __ __. 1 � BE INSTALLED PRIOR TO THE BE <br /> ,,. : ..:..._ . _..._ _... _ _..... GINNING OF WORK ON THE SITE A v <br /> _ _ / I I <br /> S <br /> _ _ . . ,. :: , -: PRACTICABLE <br /> PROPOSED <br /> „ :.:.:: ,....... ,. S. Q <br /> .: ,;. ,:.:I '; / GRAVEL BA <br /> GS AND FIBER ROLL <br /> ED AREAS SHALL BE IN CONT <br /> STALLED AS PR CONTROL P <br /> 3 <br /> AGTICABLE AND IN o LAN <br /> CONFORMANCE WITH R <br /> IN CONDITIONS. iu <br /> 14. ALL DETAILS FOR E <br /> EROSION DEVICES SHOWN ON THIS <br /> , <br /> WIND EROSION PREVENT#ON MEA <br /> SURES PER CALTRANS STORM <br /> . : <br /> WATER BMP DETAIL if PUTWE-1 SHALL 8E ❑ <br /> IN ACE THROUGHOUT PROJECT. 0 <br /> f <br /> R <br /> FR <br /> u <br /> 00 _ NOTE: SHEET NO, <br /> LO z / PLACE NET-WRAPPED FIBER ROLL IN TRENCH. <br /> WATTLE TO BE TIGHTLY BUTTED END TO EO <br /> BUT NOT OVERLAPPING, MINIMUM(6)STAKES o <br /> 1 PER 25' ROLL. <br /> � FIBER ROLL <br /> Cl A <br /> d> <br /> 1 SCALE: N.T.S. <br />