My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
1031
>
2200 - Hazardous Waste Program
>
PR0528037
>
COMPLIANCE INFO_PRE 2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2020 3:48:04 PM
Creation date
4/16/2020 12:27:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2020
RECORD_ID
PR0528037
PE
2220
FACILITY_ID
FA0010542
FACILITY_NAME
Lopez Truck And Trailer Repair
STREET_NUMBER
1031
Direction
E
STREET_NAME
CHURCH
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15126035
CURRENT_STATUS
01
SITE_LOCATION
1031 E CHURCH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN <br />PART I <br />GENERAL SITE INFORMATION <br />1. Site Name: Bambu's Engine and 7 <br />Address: 1031 E. Church St., Stoc <br />Contact Person: Bimal Maharaj_ <br />Sweeps Number: <br />Proposed Date of investigation/ins <br />2. Description and brief narrative of ins <br />❑ New UST installation.. ❑ <br />❑ Tank Closure in Place.. ❑ <br />❑ Tank/Pipe Removal. ❑ <br />❑ Installation of Borings / Monitori <br />® Hazardous waste inspection ❑ <br />❑ Tiered Permitting inspection <br />3. Specific Site Information: <br />Tank No.: <br />Tank Content: <br />Other: <br />4. Type of Operation: Engine and <br />5. Release History: <br />Evidence of leaks / soil contamination: <br />Documented Groundwater contaminati <br />Background and description of any pre <br />COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br />SITE HEALTH AND SAFETY PLAN <br />Phone No: 463-9046 <br />)n: May 27, 2008 <br />;tion activity: <br />\R Investigation. <br />nk/Pipe Repair. <br />;-excavation. <br />Wells. <br />unpling <br />nk Capacity: <br />nk Age: <br />ssion rebuilding <br />❑ YES ❑ NO <br />n: ❑ YES ❑ NO <br />sous investigation or incidence: <br />6. Potential Health and Safety <br />Physical Concerns: (check all that appl <br />❑ Heat or Cold Stress: °F <br />❑ Noise Sources: <br />❑ Oxygen Deficiency: <br />❑ Excavation: (falls, trips, slipping, cav <br />❑ Handling and Transfer of a Hazardot <br />etc--)-- <br />❑ Confined space entry: (explosions): - <br />El Heavy equipment (physical injury & <br />equipment): <br />❑ Other, specify <br />7. Anticipated Biological Hazards: <br />❑ Snakes ❑ Insects ❑ Rodents <br />❑ Other/Unknown (specify): <br />8. Narrative (provide all information v <br />e.g., power lines, integrity of dikes, <br />EH 23081 (02/19/03) <br />describe) <br />;h ambient temp.) <br />Substance: (fire, explosions, <br />resulting from moving <br />❑ Poisonous Plants <br />uld impact Health and Safety, <br />etc.) <br />PART II <br />EVALUATION OF POTENTIAL HAZARDS <br />1. Chemicals Hazards <br />® Carcinogens: waste oil, used absorbents <br />❑ Corrosives: <br />❑ Dusts: <br />❑ Explosives: <br />❑ Flammables: <br />❑ Inorganic Gases: <br />❑ Metals: <br />❑ Oxidizers: <br />❑ PCB's: <br />PART III <br />REQUIRED PERSONAL PROTECTIVE EQUIPMENT <br />1. Monitoring Equipment (note: Monitoring instruments must be used for all <br />operations unless appropriate rationale or restrictions are provided) <br />❑ Combustible Gas/Oxygen Meter. <br />❑ Detector Tubes (Specify). <br />❑ Photo ionization Detector. <br />❑ Organic Vapor Analyzer. <br />❑ Other, specify. <br />If monitoring instruments are not used, rationale or activity / area restrictions: <br />2. Personal Protective Equipment <br />Level of Protection: ❑ A ❑ B ❑ C ® D <br />® Hard Hat. <br />® Safety Glasses/goggles. <br />® Steel toed/shank shoes or boots. <br />❑ Flame retardant coveralls. <br />® Hearing protection. <br />❑ Tyvek. <br />❑ Respirator: ❑ APR ❑ SCBA <br />A/P cartridge: <br />® Safety vest. <br />❑ Two-way communication. <br />PART IV - PLAN APPROVAL <br />Plan Prepared by: Ray von Flue Date: 5/27/08 <br />Plan Approved by: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.