0- I
<br />1 I
<br />« 6 -ss 4'YCO
<br />I
<br />GT -1
<br />I
<br />4'YCO
<br />( SV -1
<br />4'YCO
<br />I /
<br />PLUMBING SS, GAS, AND VENT FLOOR PLAN
<br />SCALE: 3/16"= V-0"
<br />J
<br />NORTH
<br />rR
<br />1
<br />15, SPILL 1' TAILPIECE FROM ESPRESSO MACHINE TO
<br />DEVLELOPED 'L'
<br />PIPE
<br />REVISIONS
<br />FS -L
<br />1/2'
<br />PLUMBING NOTES
<br />SIZES FROM TABLE
<br />1216,2(1)
<br />3/4'
<br />161 SPILL 1-1/4' TAILPIECE FROM 2CS-1 TO FS -1,
<br />al?l
<br />1Q PLANCHECK iPl - XX/XX/XX
<br />134
<br />PDC -
<br />CONNECT (N)4'SS TO (E)6'SS ON SITE,
<br />275
<br />POC -
<br />CONNECT (N)4'VENT TO (E)4'VENT ❑N SITE,
<br />18, SPILL 1--1/4' TAILPIECE FROM 1CS-1 TO FS -1,
<br />2'
<br />PDC -
<br />CONNECT (N)4'GL TO (E)4'GL ON SITE,
<br />2-1/2'
<br />191 SPILL 3/4'T&P RELIEF FROM WH -1 G'AFG,
<br />SPILL
<br />1-1/4' TAILPIECE FROM BS -1 TO ES -1.
<br />2240
<br />PLUS INC.
<br />SPILL
<br />1/2' TAILPIECE FRUM ICE BIN TO FS -1,
<br />4335-B
<br />NORTH
<br />SPILL
<br />1-1/4' TAILPIECE FROM SS=1 AND 1/2'
<br />TAILPIECE
<br />FROM ICE 3IN TO FS -1,
<br />SPILL
<br />1' TAILPIECE FROM GLASS WASHER TO FS -1.
<br />21 HOT PLATE 10 BURNER FURNISHED BY ETHERS,
<br />Feel
<br />SPILL
<br />1-1/4' TAILPTECE FROM L2 TO FS -1,
<br />0
<br />SPILL
<br />1-1/4' TAILPIECE FROM DISHWASHER TO
<br />ph. 209.577.4661
<br />FS -1,
<br />THIS DOCUMENT, AND THE IDEAS AND DESIGNS
<br />10
<br />SPILL
<br />1-1/2' TAILPIECE FROM 3CS-1 TO FS -1,
<br />INCORPORATED HEREIN, AS AN INSTRUMENT OF
<br />PROFESSIONAL SERVICE, IS THE PROPERTY OF
<br />11
<br />SPILL
<br />1/2' TAILPIECE FROM ICE BIN ANI) 3/4'
<br />11 api' AND IS NOT TO BE USED, IN WHOLE OR IN
<br />PART, FOR ANY OTHER PROJECT WITHOUT
<br />TAILPIECE FROM ICE MAKER TO FS -1,
<br />WRITTEN AUTHORIZATION.
<br />12,
<br />SPILL
<br />3/4' TAILPIECE FROM WF -1 TO FS -1,
<br />24, 18' FRYER FURNISHED BY ETHERS. 3/4'G
<br />PLANNING ■ ■ ■
<br />13:
<br />SPILL
<br />1' TAILPIECE FROM S❑DA GUN TO FS -1,
<br />C❑NNECTI❑N, 70 CFH,
<br />14
<br />SPILL
<br />1' TAILPIECE FROM COFFEE MACHINE TO
<br />ARCHITECTURE ■ ■ ■
<br />25, 18' STOCKPOT FURNISHED BY OTHERS, 1'G
<br />FS -1,
<br />■ ■
<br />15, SPILL 1' TAILPIECE FROM ESPRESSO MACHINE TO
<br />DEVLELOPED 'L'
<br />PIPE
<br />CFH
<br />FS -L
<br />1/2'
<br />34
<br />SIZES FROM TABLE
<br />1216,2(1)
<br />3/4'
<br />161 SPILL 1-1/4' TAILPIECE FROM 2CS-1 TO FS -1,
<br />al?l
<br />1'
<br />134
<br />17, SPILL 1-1/4' TAILPIECE FR❑M L3 T❑ FS -1,
<br />275
<br />1-1/2'
<br />412
<br />18, SPILL 1--1/4' TAILPIECE FROM 1CS-1 TO FS -1,
<br />2'
<br />794
<br />2-1/2'
<br />191 SPILL 3/4'T&P RELIEF FROM WH -1 G'AFG,
<br />ARCHITECTURE
<br />2240
<br />PLUS INC.
<br />4'
<br />4560
<br />4335-B
<br />NORTH
<br />STAR WAY
<br />20 RUN GAS UNDER CONCRETE THRU SLEEVE,
<br />MODESTO,
<br />CA 95356
<br />21 HOT PLATE 10 BURNER FURNISHED BY ETHERS,
<br />1-1/2'15 CONNECTION, 320 CFH,
<br />ph. 209.577.4661
<br />22, 18" PASTA CUEKER FURNISHED BY OTHERS, 1' G
<br />fx. 209.577.0213
<br />CONNECTION, 105 CFH,
<br />23, 36' GRIDDLE FURNISHED BY OTHERS, 1'G
<br />www.apiarc.com
<br />C❑NNECTI❑N, 90 CFH,
<br />24, 18' FRYER FURNISHED BY ETHERS. 3/4'G
<br />C❑NNECTI❑N, 70 CFH,
<br />25, 18' STOCKPOT FURNISHED BY OTHERS, 1'G
<br />FRAM; C. BOOTS
<br />L. SMITH
<br />C❑NNECTI❑N, 90 CFH,
<br />RODNEE EY CC.. ALONZO
<br />26, CONVECTION OVEN DOUBLE - IMPERIAL, FURNISHED
<br />ARCHITECTS
<br />BY OTHERS, 1'G CONNECTION, 100 CFH,
<br />27, 36' CHARBROILER FURNISHED BY OTHERS, 1'G
<br />LF
<br />C❑NNECION, 120 CFH,
<br />28, HOT PLATE 6 BURNER FURNISHED BY OTHERS,
<br />1-1/4' GAS CONNECTION, 192 CFH,
<br />29, 36' SALAMANDER FURNISHED BY OTHERS, 3/4' G
<br />CUNNLCTI❑N, 40 CFH,
<br />30, 3'RDDF DRAIN AND OVERFLOW, RUN ROOF DRAIN
<br />Z
<br />c
<br />D❑WN WALL AND DISCHARGE ABOVE FINISHED
<br />co
<br />C7
<br />1 j
<br />q; a) m 0
<br />GRADE, RUN OVERFLOW STRAIGHT ❑UT WALL AND
<br />m
<br />Z
<br />,
<br />N
<br />U) o 00 N
<br />DAYLIGHT,
<br />ti
<br />u_J
<br />N
<br />Z co
<br />co
<br />a) M.
<br />C
<br />C7
<br />�aUaQ
<br />C
<br />f0
<br />3:N fV
<br />O
<br />w
<br />c>s
<br />Q x -0
<br />0
<br />C -L
<br />CV �
<br />©
<br />L
<br />E
<br />GAS SIZING TABLE
<br />DEVLELOPED 'L'
<br />PIPE
<br />CFH
<br />200'-0'
<br />1/2'
<br />34
<br />SIZES FROM TABLE
<br />1216,2(1)
<br />3/4'
<br />71
<br />2016 CPC
<br />1'
<br />134
<br />1-1/4'
<br />275
<br />1-1/2'
<br />412
<br />2'
<br />794
<br />2-1/2'
<br />1270
<br />3'
<br />2240
<br />4'
<br />4560
<br />FIXTURES QUANTITY DFU'S
<br />3CS-1 1 9
<br />MS -1 1 3
<br />FD -1 2 4
<br />S-1 2 6
<br />COMPLEX IS SERVED BYASINGLE 1000GA.L
<br />GREASEINTERCEPTOR, MAXIMUM CONNECTED
<br />DFU'SiS,35. BASED ON T11E CHAPTER 10 OF THE.
<br />CPC, TABLE 10-3, THIS PROJECT ADDS TO THE
<br />INTERCEPTOR22DFU'S. THEEXISTINGTRAP
<br />rHAS ADEQUATE CAPACITY FOR THIS TI SPACE_
<br />api COPYRIGHT 2017
<br />//jONAL \\
<br />r
<br />oak.
<br />�9 CHAGP0
<br />0
<br />Ix
<br />z
<br />O
<br />CL
<br />re
<br />2i
<br />a
<br />im
<br />w
<br />W
<br />DATE: MARCH 2017
<br />JOB NO.:
<br />16038
<br />DRAWN:
<br />N. RANDOLPH
<br />CHECKED:
<br />G. DAVIS
<br />SHEET:
<br />P1.1
<br />
|