Laserfiche WebLink
0- I <br />1 I <br />« 6 -ss 4'YCO <br />I <br />GT -1 <br />I <br />4'YCO <br />( SV -1 <br />4'YCO <br />I / <br />PLUMBING SS, GAS, AND VENT FLOOR PLAN <br />SCALE: 3/16"= V-0" <br />J <br />NORTH <br />rR <br />1 <br />15, SPILL 1' TAILPIECE FROM ESPRESSO MACHINE TO <br />DEVLELOPED 'L' <br />PIPE <br />REVISIONS <br />FS -L <br />1/2' <br />PLUMBING NOTES <br />SIZES FROM TABLE <br />1216,2(1) <br />3/4' <br />161 SPILL 1-1/4' TAILPIECE FROM 2CS-1 TO FS -1, <br />al?l <br />1Q PLANCHECK iPl - XX/XX/XX <br />134 <br />PDC - <br />CONNECT (N)4'SS TO (E)6'SS ON SITE, <br />275 <br />POC - <br />CONNECT (N)4'VENT TO (E)4'VENT ❑N SITE, <br />18, SPILL 1--1/4' TAILPIECE FROM 1CS-1 TO FS -1, <br />2' <br />PDC - <br />CONNECT (N)4'GL TO (E)4'GL ON SITE, <br />2-1/2' <br />191 SPILL 3/4'T&P RELIEF FROM WH -1 G'AFG, <br />SPILL <br />1-1/4' TAILPIECE FROM BS -1 TO ES -1. <br />2240 <br />PLUS INC. <br />SPILL <br />1/2' TAILPIECE FRUM ICE BIN TO FS -1, <br />4335-B <br />NORTH <br />SPILL <br />1-1/4' TAILPIECE FROM SS=1 AND 1/2' <br />TAILPIECE <br />FROM ICE 3IN TO FS -1, <br />SPILL <br />1' TAILPIECE FROM GLASS WASHER TO FS -1. <br />21 HOT PLATE 10 BURNER FURNISHED BY ETHERS, <br />Feel <br />SPILL <br />1-1/4' TAILPTECE FROM L2 TO FS -1, <br />0 <br />SPILL <br />1-1/4' TAILPIECE FROM DISHWASHER TO <br />ph. 209.577.4661 <br />FS -1, <br />THIS DOCUMENT, AND THE IDEAS AND DESIGNS <br />10 <br />SPILL <br />1-1/2' TAILPIECE FROM 3CS-1 TO FS -1, <br />INCORPORATED HEREIN, AS AN INSTRUMENT OF <br />PROFESSIONAL SERVICE, IS THE PROPERTY OF <br />11 <br />SPILL <br />1/2' TAILPIECE FROM ICE BIN ANI) 3/4' <br />11 api' AND IS NOT TO BE USED, IN WHOLE OR IN <br />PART, FOR ANY OTHER PROJECT WITHOUT <br />TAILPIECE FROM ICE MAKER TO FS -1, <br />WRITTEN AUTHORIZATION. <br />12, <br />SPILL <br />3/4' TAILPIECE FROM WF -1 TO FS -1, <br />24, 18' FRYER FURNISHED BY ETHERS. 3/4'G <br />PLANNING ■ ■ ■ <br />13: <br />SPILL <br />1' TAILPIECE FROM S❑DA GUN TO FS -1, <br />C❑NNECTI❑N, 70 CFH, <br />14 <br />SPILL <br />1' TAILPIECE FROM COFFEE MACHINE TO <br />ARCHITECTURE ■ ■ ■ <br />25, 18' STOCKPOT FURNISHED BY OTHERS, 1'G <br />FS -1, <br />■ ■ <br />15, SPILL 1' TAILPIECE FROM ESPRESSO MACHINE TO <br />DEVLELOPED 'L' <br />PIPE <br />CFH <br />FS -L <br />1/2' <br />34 <br />SIZES FROM TABLE <br />1216,2(1) <br />3/4' <br />161 SPILL 1-1/4' TAILPIECE FROM 2CS-1 TO FS -1, <br />al?l <br />1' <br />134 <br />17, SPILL 1-1/4' TAILPIECE FR❑M L3 T❑ FS -1, <br />275 <br />1-1/2' <br />412 <br />18, SPILL 1--1/4' TAILPIECE FROM 1CS-1 TO FS -1, <br />2' <br />794 <br />2-1/2' <br />191 SPILL 3/4'T&P RELIEF FROM WH -1 G'AFG, <br />ARCHITECTURE <br />2240 <br />PLUS INC. <br />4' <br />4560 <br />4335-B <br />NORTH <br />STAR WAY <br />20 RUN GAS UNDER CONCRETE THRU SLEEVE, <br />MODESTO, <br />CA 95356 <br />21 HOT PLATE 10 BURNER FURNISHED BY ETHERS, <br />1-1/2'15 CONNECTION, 320 CFH, <br />ph. 209.577.4661 <br />22, 18" PASTA CUEKER FURNISHED BY OTHERS, 1' G <br />fx. 209.577.0213 <br />CONNECTION, 105 CFH, <br />23, 36' GRIDDLE FURNISHED BY OTHERS, 1'G <br />www.apiarc.com <br />C❑NNECTI❑N, 90 CFH, <br />24, 18' FRYER FURNISHED BY ETHERS. 3/4'G <br />C❑NNECTI❑N, 70 CFH, <br />25, 18' STOCKPOT FURNISHED BY OTHERS, 1'G <br />FRAM; C. BOOTS <br />L. SMITH <br />C❑NNECTI❑N, 90 CFH, <br />RODNEE EY CC.. ALONZO <br />26, CONVECTION OVEN DOUBLE - IMPERIAL, FURNISHED <br />ARCHITECTS <br />BY OTHERS, 1'G CONNECTION, 100 CFH, <br />27, 36' CHARBROILER FURNISHED BY OTHERS, 1'G <br />LF <br />C❑NNECION, 120 CFH, <br />28, HOT PLATE 6 BURNER FURNISHED BY OTHERS, <br />1-1/4' GAS CONNECTION, 192 CFH, <br />29, 36' SALAMANDER FURNISHED BY OTHERS, 3/4' G <br />CUNNLCTI❑N, 40 CFH, <br />30, 3'RDDF DRAIN AND OVERFLOW, RUN ROOF DRAIN <br />Z <br />c <br />D❑WN WALL AND DISCHARGE ABOVE FINISHED <br />co <br />C7 <br />1 j <br />q; a) m 0 <br />GRADE, RUN OVERFLOW STRAIGHT ❑UT WALL AND <br />m <br />Z <br />, <br />N <br />U) o 00 N <br />DAYLIGHT, <br />ti <br />u_J <br />N <br />Z co <br />co <br />a) M. <br />C <br />C7 <br />�aUaQ <br />C <br />f0 <br />3:N fV <br />O <br />w <br />c>s <br />Q x -0 <br />0 <br />C -L <br />CV � <br />© <br />L <br />E <br />GAS SIZING TABLE <br />DEVLELOPED 'L' <br />PIPE <br />CFH <br />200'-0' <br />1/2' <br />34 <br />SIZES FROM TABLE <br />1216,2(1) <br />3/4' <br />71 <br />2016 CPC <br />1' <br />134 <br />1-1/4' <br />275 <br />1-1/2' <br />412 <br />2' <br />794 <br />2-1/2' <br />1270 <br />3' <br />2240 <br />4' <br />4560 <br />FIXTURES QUANTITY DFU'S <br />3CS-1 1 9 <br />MS -1 1 3 <br />FD -1 2 4 <br />S-1 2 6 <br />COMPLEX IS SERVED BYASINGLE 1000GA.L <br />GREASEINTERCEPTOR, MAXIMUM CONNECTED <br />DFU'SiS,35. BASED ON T11E CHAPTER 10 OF THE. <br />CPC, TABLE 10-3, THIS PROJECT ADDS TO THE <br />INTERCEPTOR22DFU'S. THEEXISTINGTRAP <br />rHAS ADEQUATE CAPACITY FOR THIS TI SPACE_ <br />api COPYRIGHT 2017 <br />//jONAL \\ <br />r <br />oak. <br />�9 CHAGP0 <br />0 <br />Ix <br />z <br />O <br />CL <br />re <br />2i <br />a <br />im <br />w <br />W <br />DATE: MARCH 2017 <br />JOB NO.: <br />16038 <br />DRAWN: <br />N. RANDOLPH <br />CHECKED: <br />G. DAVIS <br />SHEET: <br />P1.1 <br />