My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013185
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PELTIER
>
7099
>
2600 - Land Use Program
>
PA-1900304
>
SU0013185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2020 11:38:01 AM
Creation date
4/17/2020 11:38:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013185
PE
2625
FACILITY_NAME
PA-1900304
STREET_NUMBER
7099
Direction
E
STREET_NAME
PELTIER
STREET_TYPE
RD
City
ACAMPO
Zip
95220-
APN
00526061
ENTERED_DATE
4/15/2020 12:00:00 AM
SITE_LOCATION
7099 E PELTIER RD
RECEIVED_DATE
4/15/2020 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sshih
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'ZIa <br /> SA NA 0 A 0 U 1 N Community Development Department <br /> —COUNTY— PlanningBuilding Neighborhood Preservation <br /> ifo <br /> Greotness grows here. 9 9 <br /> APPLICATION REFERRAL: RE-REFERRAL: <br /> Public Hearing Revised Site Plan <br /> Project Planner: Alisa Goulart Phone: (209)468-0222 FAX: (209)468-3163 Email: alisa.goulart@sjgov.org <br /> The following project has been filed with this Department: APPLICATION NUMBER: PA-1900304 (UP) S00013185 7-s <br /> 2625- Minor <br /> PROPERTY OWNER: Lani Jean APPLICANT: Dillon & Murphy <br /> 7099 East Peltier Road Attn: Joe Murphy <br /> Acampo, CA 95220-9605 PO Box 2180 <br /> Lodi, CA 95241-2180 <br /> PROJECT DESCRIPTION: A Use Permit application to expand an existing Small Winery on a 4.38-acre parcel to a <br /> Medium Winery in two (2) phases over five (5)years. Phase 1 includes the construction of a 13,800 square foot building <br /> for fermentation, storage, laboratory, breakroom and restroom. Phase 2 includes the construction of a 7,200 square foot <br /> storage building. Also proposed is an above ground waste tank and a fire suppression water tank. The winery is open to <br /> the public seven (7)days a week during peak season and five (5)days a week during the off-season, for six(6) hours per <br /> day. The winery is currently approved for Marketing Events (maximum of twelve [12] annually) with a maximum of 150 <br /> attendees, Small-scale Accessory Events (maximum of one [1] daily)with a maximum of eighty(80)attendees, and Wine <br /> Release Events (maximum of four [4] annually)with a maximum of 150 attendees at any given time. Indoor and outdoor <br /> amplified music is permitted at events with the condition the event ends by 9:00 p.m. No changes in events are proposed <br /> with this application. The project site utilizes a private well for water supply, an on-site septic system for sewage disposal, <br /> and on-site natural drainage for storm water. Access is from two (2)driveways off of East Peltier Road. <br /> The Property is zoned AG-40 (General Agriculture, 40-acre minimum) and the General Plan designation is A/G (General <br /> Agriculture) and OS/RC (Resource Conservation). <br /> PROJECT LOCATION: The project site is located on the north side of East Peltier Road, 1.7 miles east of North State <br /> Route 99, Acampo. (APN/Address: 005-260-61/7099 East Peltier Road, Acampo) (Supervisorial District: 4) <br /> ENVIRONMENTAL DETERMINATION: This is a Notice of Intent to adopt a Mitigated Negative Declaration for this project <br /> as described. San Joaquin County has determined that through the Initial Study that contains proposed mitigation measures <br /> all potentially significant effects on the environment can be reduced to a less than significant level. The Mitigated Negative <br /> Declaration and Initial Study can be viewed on the Community Development Department website at www.sjgov.org/commdev <br /> under Active Planning Applications. <br /> APPLICATION REVIEW: Recommendations and/or comments on this project must be submitted to the Community <br /> Development Department no later than May 21, 2020. Recommendations and/or comments received after that date may <br /> not be considered in staffs analysis and/or recommendation to the San Joaquin County Planning Commission for this <br /> application. <br /> NOTE TO SURROUNDING PROPERTY OWNERS: This project will be scheduled for a San Joaquin County Planning <br /> Commission hearing. Notification will be provided on the date, time, and place of the public hearing at a later date. <br /> NOTE TO REVIEW AGENCIES: In order to be notified of the San Joaquin County Planning Commission hearing date for <br /> this project, please contact the above noted Project Planner to be placed on the notification list. (Public agencies with <br /> recommendations and/or comments on the proposed project and/or environmental determination will automatically be <br /> placed on the notification list.) <br /> 1810 E. Hazelton Avenue I Stockton, California 95205 1 (209)468-3121 1 www.sjgov.org/commdev <br />
The URL can be used to link to this page
Your browser does not support the video tag.