Laserfiche WebLink
r <br /> . WORK REQUEST FORM <br /> Date of Request: 013098 Requested Completion Date-, 031298 <br /> Proj Name K O K Realty ._ _ Prol No 62581 0001 <br /> Site Addres:2403 West Navy Dr. Stockton Ca Task: <br /> Project Manager: Tom Lutterman Field Tech Alex Flores <br /> Client Contact: Sheldon Basch Phone No 914-631-6900 <br /> Regulatory Contact _ _ Phone No 209-468-0337 <br /> Approval ompletion Date 03 I z l? a ;Aw <br /> Ep II <br /> Notify-client and regulator 48 hrs prior to site work. <br /> Also notify Swift Trucking Co at 943_,1476 to move trailers parked over wells <br /> • Monitor DTW/DTB 7 wells In order, MW-5.7,4.6.3.1&2 <br /> Purge and sample MW-7,6,41 & 2 (1st !M) r^wZ 0 <br /> Sample for_BTEX/TPHg with MTBE (with lower D L ) and TPHd <br /> Samples to AEN_Labs. <br /> Wells are 29'-deep Water is at 13" Wells are 2" <br /> MW2 has had free product in the past. Use interface probe and take bailer cut_ _ <br /> Take a long bailer to purge this well if it doesn't have product <br /> Contain purge water Reuse drum from MW--5 ND last QMS 12/97 <br /> Remove _free_product from skimmer in MW-2 and store on site Bring_a new <br /> salvage drum for free product containment Note amount of product removed and <br /> total amount stored on site A <br /> Prepare purchase requisition form for samples Af <br /> AFLORESIF-WORK do,. <br />