Laserfiche WebLink
WORK REQUEST FORM <br /> Date of Request: 112596 Requested Completion Date: 120596 <br /> Prod Name: K.O.K. Realty Proj No: 94-334 Phase:001 <br /> Site Addres:2403 West Navy Dr. Stockton Ca. Activity: 10 <br /> Project Manager: Jeanne Homsey Field Tech: Alex Flores <br /> Client Contact: Phone No: <br /> Regulatory Contact: Mary Meas Phone No: 209-468-0337 <br /> Approval: Completion Date: tgosq6 >0� <br /> Notify client and regulator 48 hrs prior to site work. <br /> Monitor DTW/DTB 7 wells In order, MW-7,5,6,3,4.1&2. <br /> Pure and sample--MW-5,3.1 & 2 4 th. QM). <br /> Sample for BTEX/TPH2 with MTBE with lower D.L. and TPHd. <br /> Samples to Argon Mobile Labs. <br /> Wells are 29' deep. Water is at 13" Wells are 2" <br /> MW2 has had free product in the past. Use interface probe and take bailer cut. <br /> Take a long baler to purge this well if it doesn't have product. <br /> Contain purge water. Reuse drums from MW-7 & 6 N/D last round of sampling. <br /> If there is product in MW-2. Bail and store on site in double container. <br /> Note amount of product stored on site <br /> Prepare purchase order request.�-A <br /> AFLORESW-WORK doc <br />