Laserfiche WebLink
to sample collection, any void created by the Soil Probe Urut will be grouted to the surface with a <br /> neat cement grout Any soil cuttings generated during sampling activities will remain on site in <br /> covered 5-gallon buckets pending analytical results of soil samples <br /> Corrective Action Plan Preparation <br /> Following receipt of laboratory results, a Corrective Action Plan (CAP) will be prepared <br /> summarizing the findings of the subsurface investigation and discussing remediation alternatives <br /> for soil and groundwater contamination for submittal to the client and PHS/EHD Any pilot tests <br /> for remediation alternatives will be conducted on-site prior to preparation of the CAP PHS/EHD <br /> will be notified prior to conducting any pilot testing <br /> Smith Environmental, on behalf of KOK Realty, is currently evaluating disposal/treatment <br /> alternatives for soil and groundwater currently stored on-site from field investigative and sampling <br /> activities Appropriate personnel at Stockton's Waste Water Treatment Facility have been <br /> contacted for approval to discharge the stored purge water to the sanitary sewer for treatment <br /> Analytical data has been supplied to the City and we are currently awaiting a response <br /> All work described in this proposal will be performed under the direct supervision of a California <br /> Registered Civil Engineer All field work will be completed in accordance with the field <br /> procedures contained in Attachment 1 and the Site Safety Plan on file with PHS/EHD <br /> • <br /> w 1943341wp-0796 doc 3 <br /> • <br /> SMTH <br />