Laserfiche WebLink
1C13yt011 <br /> d('Roue SERviC[5 <br /> ' 4.0 SUMMARY AND CONCLUSIONS <br /> Based on the requirements of the PHD/EHD, the fourth quarterly groundwater <br /> monitoring event was conducted at the site Groundwater samples were analyzed for <br /> TPH-gas, TPH-diesel, BTEX, and MTBE <br /> The groundwater samples did not contain TPH-gas, benzene, ethylbenzene, or MTBE <br /> above analytical detection limits Concentrations of toluene and xylene(s) were detected <br /> in the groundwater sample from MW-2 at concentrations of 0 78 pg/L and 0 87 p.g/L <br /> ' respectively and are below the maximum contaminant levels (MCLS) for drinking water <br /> for these constituents Concentrations of diesel were detected in groundwater from each <br /> of the three groundwater monitoring wells at concentrations ranging from 120 pg/L to <br /> 250 pg/L These diesel-range hydrocarbons are within the range detected by analysis in <br /> the previous three 2003 quarterly sampling events Based on the limited diesel fuel, <br /> ' toluene and ethylbenzene impact in the purge water,we recommend that it be discharged <br /> to the local Publically Owned Treatment Works through the onsite treatment system after <br /> approval by the PHD/EHD Groundwater flow direction is consistent with the third <br /> ' quarter 2003 result The groundwater gradient decreased from 0 0067 feet/feet to 0 0051 <br /> feet/feet this quarter when compared with the third quarter of 2003 <br /> This groundwater monitoring event concludes the quarterly groundwater monitoring <br /> program requirements of the PHD/EHD No MTBE was detected above the laboratory <br /> detection limits in groundwater below the site during the past four quarterly monitoring <br /> events, demonstrating that no significant migration of fuel-related compounds is <br /> occurring On behalf of the Learner Company, we request the PHD/EHD require no <br /> further action for the groundwater at the site Following issuance of a"No Further <br />' Action" letter by the PHD/EHD, the Learner Company will abandon the wells in <br /> accordance with the project workplan <br /> 1 <br />' 3 <br /> S\Proj\P02263\Q4 Rpt doc <br />