Laserfiche WebLink
'1,,�Claytori <br /> CONTENTS <br /> Section Page <br /> 1.0 INTRODUCTION I <br /> 2.0 BACKGROUND 1 <br /> 3.0 SOIL BORINGS AND GROUNDWATER MONITORING WELL <br /> INSTALLATION 3 <br /> 31 PRE-DRILLING ACTIVITIES 3 <br /> 32 SOIL BORINGS 3 <br /> 33 GROUNDWATER MONITORING WELL INSTALLATION 4 <br /> 34 WELL DEVELOPMENT 4 <br /> 4.0 GROUNDWATER MONITORING AND SAMPLING 5 <br />' 5.0 INVESTIGATION RESULTS 6 <br /> 51 SUBSURFACE CONDITIONS 6 <br /> 52 SOIL ANALYTICAL RESULTS 6 <br /> 5 3 GROUNDWATER ANALYTICAL RESULTS 6 <br /> 6.0 SUMMARY AND CONCLUSIONS 6 <br /> Figures <br /> 1 Site Location Map <br /> 2 Site Plan <br />' 3 Groundwater Monitoring Wells, First Quarter 2003 <br /> 4 Well Construction Diagram <br />' Appendices <br /> A Health and Safety Plan <br /> B Well Permit <br /> C Boring Logs <br /> D Well Development Logs <br /> E Groundwater Sampling Data Sheets <br />' F Laboratory Reports and Chain-of-Custody Forts <br />' S\ProjW22W\Q1 Rpt&c <br />