i
<br /> i
<br /> ABBREVIATIONS ARCHITECTURAL SYMBOL LEGEND PROJECT CONTACTS GENERAL NOTES INDEX OF SHEETS -•
<br /> AIC AIR CONDITIONING - _ LEGEND: X-SHEET ISSUED
<br /> ACT ACOUSTICAL CEILING TELE
<br /> MAILING STARBUCKS COFFEE COMPANY 1. THE DRAWINGS AND PROJECT MANUAL TOGETHER CONSTITUTE THE R - SHEET ISSUED FOR REFERENCE AND COORDINATION ONLY
<br /> ADDRESS: 2401 UTAH AVENUE SOUTH
<br /> ADJ ADJUSTABLE CONTRACT DOCUMENTS FOR CONSTRUCTION. ALL GENERAL
<br /> _ MS STOP: S-SD10 REQUIREMENTS ARE TD BE MET AND ALL MATERIALS FINISHES AND SEE TITLEBLOCK FOR REVISION ISSUE DATE(S)
<br /> AFF ABOVE FINISHED FLOOR N SEATTLE, WASHINGTON 98134 SYSTEMS ARE TO BE INSTALLED AND PERFORM PER SPECIFICATIONS SHEET SHEET TITLE
<br /> AMP AMPERE scam x-x 206 318-1575
<br /> ARCH ARCHITECT ( ) UNLESS OTHERWISE NOTED. —.......-.
<br /> NORTH GRAPHIC DATUM EXTERIOR INTERIOR DESIGN YUMI CHON 2. GENERAL CONTRACTOR SHALL VISIT THE SITE, REVIEW THE BUILDING GENERAL
<br /> BOH BACK OF HOUSE ARROW SCALE POINT ELEVATION ELEVATION MANAGER: STARBUCKS COFFEE COMPANY SHELL DRAWINGS AS SUBMITTED BY THE LANDLORD OR STARBUCKS G001 GENERAL INFORMATION
<br /> CAB CABINET
<br /> CALL-OUT CALL-OUT 60 SPEAR STREET, 7TH FLOOR AND BECOME THOROUGHLY FAMILIAR WITH THE SITE CONDITIONS G002 LIFE SAFETY ACCCESSIBILITY PLAN CL CENTER LINE SAN FRANCISCO, CA 94105 PRIOR TO CONSTRUCTION.
<br /> P- (415)537-7204 G002.1 OCCUPANCY LOAD DIAGRAM
<br /> LG CEILING F: (415)265-8975
<br /> G003 ACCESSIBILITY NOTES ©2011 STARBUCKS COFFEE
<br /> CM STARBUCKS X. E. YCHON@STARBUCKS.COM 3. GENERAL CONTRACTOR SHALL CONSULT WITH STARBUCKS GDD4 ACCESSIB€CITY NOTES
<br /> CONSTRUCTION MANAGER �'� -" (XXL XXXX AFF � CONSTRUCTION MANAGER TO RESOLVE ANY CHANGES, OMISSIONS
<br /> CTR CENTER CONSTRUCTION JASON VOYER OR PLAN DISCREPANCIES PRIOR TO CONSTRUCTION, STARBUCKS COFFEE
<br /> ARCHITECTURAL
<br /> CX COMMISSIONING SECTION DETAIL SHEET ABOVE FINISH FINISH FACE TO REVISION MANAGER: STARBUCKS COFFEE COMPANY 4. ALL WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH A001 OVERALL SITE PLAN COMPANY
<br /> CXA COMMISSIONING AGENT CALL-OUT CALL-OUT NOTE FLOOR FINISH FACE CLOUD 60 SPEAR STREET, 7TH FLOOR LOCAL, COUNTY, STATE AND FEDERAL CODES AND ORDINANCES. AOD2 ARCHITECTURAL SITE PLAN 2401 UTAH AVENUE SOUTH
<br /> DEG DEGREE
<br /> CALLOUT HEIGHT TAG DIMENSION SAN FRANCISCO, CA 94105
<br /> DET DETAIL P: (415)254-3249 5. GENERAL CONTRACTOR SHALL VERIFY THE LOCATION OF ALL A043 ARCHITECTURAL SITE DETAILS SEATTLE, WASHINGTON 98134
<br /> DIA DIAMETER E: JVOYER@STARBUCKS.COM UTILITIES. A101 BUILDING FLOOR PLAN (206) 31$_1575
<br /> DIM DIMENSION A102 BUILDING FLOOR PENETRATION PLAN
<br /> DM STARBUCKS LANDLORD: MICHAEL SINGELYN
<br /> 6, GENERAL CONTRACTOR TO VERIFY ALL DIMENSIONS, INCLUDING A103 BUILDING ROOF PLAN THESE DRAWINGS AND SPECIFICATIONS ARE
<br /> DESIGN MANAGER PXXX-ES I"'I DiXXXXx7 (WXXXXX; MLMMA INC., TEXAS LLC CLEARANCES REQUIRED BY OTHER TRADES AND NOTIFY STARBUCKS A201 BUILDING EXTERIOR ELEVATIONSCONFIDENTIAL AND SHALL REMAIN THE SOLE
<br /> DN DOWN
<br /> CONSTRUCTION MANAGER OF ANY DISCREPANCIES PRIOR TO PROPERTY OF STARBUCKS CORPORATION, WHICH IS
<br /> - - 9517 APROCEEDING WITH THE WORK. ALL DIMENSIONS ARE TO THE FACE A202 BUILDING EXTERIOR ELEVATIONS THE OWNER OF THE COPYRIGHT IN THIS WORK.
<br /> REVISION PAINT DESIGN ID DOOR WINDOW DALLASS,, TTX X 775523388ICK OF THE FINISHED SURFACE UNLESS NOTED OTHERWISE. ALL A301 BUILDING SECTIONS THEY SHALL NOT BE REPRODUCED (IN WHOLE OR IN
<br /> EA EACH TAG TAG TAG TAG TAG P: (310)480 8509 DIMENSIONS TO BE TAKEN FROM DESIGNATED DATUM POINT. DO NOT A401 ENLARGED PLANS & ELEVATIONS PART), SHARED WITH THIRD PARTIES OR USED IN AN
<br /> EL ELEVATION E: MJSINGELYN@SBCGLOBAL.NET MANNER ON OTHER PROJECTS OR EXTENSIONS TO
<br /> EQ EQUAL
<br /> SCALE DRAWINGS. A501 BUILDING DETAILS THIS PROJECT WITHOUT THE PRIOR WRITTEN
<br /> EXTEXIST EXISTING ARCHITECT CHRIS LEE 7ARCHITECTURE . GENERAL CONTRACTOR SHALL PATCH AND REPAIR ALL EXISTING A502 DRIVE THRU & SITE DETAILS CONSENT OF STARBUCKS CORPORATION- THESE
<br /> A503 DRIVE THRU & SITE DETAILS DRAWINGS AND SPECIFICATIONS ARE INTENDED TO
<br /> EXTERIOR OF RECORD: MC PAC F CA, SUITE 280 WALLS, FLOORS, CEILINGS, OR OTHER SURFACES IDENTIFIED TO EXPRESS DESIGN INTENT FOR A PROTOTYPICAL
<br /> IRVINECA 92618
<br /> FF&E FURNITURE,
<br /> AERIAL MAP , REMAIN THAT MAY BECOME DAMAGED DURING THE COURSE OF THE A601 WINDOW AND DOOR SCHEDULES & DETAILS STARBUCKS STORE (WHICH 15 SUBJECT TO CHANGE FIXTURE, AND EQUIPMENT P: (949)553-1117 WORK. AT ANYTIME)AND DO NOT REFLECT ACTUAL SITE
<br /> _(D FLR FLOOR F: (949)474-7056 INTERIORScio
<br /> CONDITIONS. NEITHER PARTY SHALL HAVE ANY
<br /> FOH FRONT OF HOUSE E: CLEE@MCGARCHITECTURE.COM 8. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR OBTAINING 1101 FF& E PLAN OBLIGATION NOR LIABILITY TO THE OTHER(EXCEPT
<br /> FOIC FURNISHED BY OWNER, PERMITS FOR FIRE PROTECTION, PLUMBING, MECHANICAL, AND STATED ABOVE) UNTIL A WRITTEN AGREEMENT IS
<br /> E INSTALLED BY CONTRACTOR ELECTRICAL SYSTEMS PRIOR TO INSTALLATION OF SUCH SYSTEMS. 1102 CASEWORK PLAN FULLY EXECUTED BY BOTH PARTIES.
<br /> MEP GREGORY SCHNACKEL
<br /> 1103 REFLECTED CEILING PLAN
<br /> INSTALLED BY OWNER
<br /> O
<br /> f— FOTO FURNISHED BY OWNER CONSULTANT SCHNACKEL ENGINEERS 9. GENERAL CONTRACTOR SHALL RETAIN ONE SET OF PERMIT PLANS
<br /> 1104 RCP LIGHTING DIMENSION PLAN
<br /> OF RECORD: 1585 KAPI'OLANI BLVD.
<br /> FT FOOT/FEET ON-SITE TO DOCUMENT ALL CHANGES MADE DURING CONSTRUCTION. 1105 FLOOR FINISH PLAN
<br /> Z HONOLULU, HI 96814 ARCHITECT OF RECORD
<br /> P: (808 892 3660 THE RECORD DRAWINGS SHALL BE ISSUED TO THE OWNER AT 1201 INTERIOR FINISH ELEVATIONS & SCHED. o �,
<br /> Q G GROUND ) PROJECT CLOSE-OUT AS DESCRIBED IN THE GENERAL
<br /> o D: (808)829-3665 1202 INTERIOR FINISH ELEVATIONS& SCHED. �
<br /> REQUIREMENTS OF THE PROJECT MANUAL. U —
<br /> GC GENERAL CONTRACTOR E: GSCHNACKEL@SCHNACKEL.COM 1203 INTERIOR FINISH ELEVATIONS & SCHED.
<br /> GWB GYPSUM WALLBOARD L L,
<br /> co
<br /> 10. GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING 1401 ENLARGED RESTROOM PLAN C
<br /> LO HC HOLLOW COREDELIVERY OF MATERIALS FROM STARBUCKS CONTRACTED THIRD 1402 ENLARGED RESTROOM ELEVATIONS
<br /> b,
<br /> HDW HARDWARE PARTY LOGISTICS DISTRIBUTION SERVICES AND VENDOR DIRECT 1501 FLOOR FINISH DETAILS
<br /> 06 HM HOLLOW METAL SHIPMENTS. SEE THE PROJECT MANUAL FOR ADDITIONAL
<br /> HORIZ HORIZONTAL 1502 CONSTRUCTION DETAILS
<br /> INFORMATION. mcg a r c h i t e c u r
<br /> HR HOUR ... m 1503 WALL FINISH DETAILS 111 Pacifica,Suite 280,Irving, CA 92618
<br /> HT HEIGHT 11. RESPONSIBILITY FOR SUPPLY AND DELIVERY OF MATERIALS AND 1504 CASEWORK DETAILS P: 949.553.1117 F 949.474.7056
<br /> JI HVAC HEATING, VENTILATING EQUIPMENT IS IDENTIFIED IN THE DRAWING SCHEDULE SHEETS 1505 CEILING DETAILS
<br /> CC) AIR CONDITIONING r UNDER THE COLUMN LABELED "RESPONSIBILITY". 1601 FF& E SCHEDULES ARCHITECT STAMP
<br /> A R'�` r L. 141.r 4 1C
<br /> N 1.D. INSIDE DIAMETER '� 12, FOR THE PURPOSE OF THE DOCUMENTS, TO "INSTALL", SHALL MEAN 1602 CASEWORK AND EQUIP. SCHEDULES eD APC
<br /> r�a� W I!y�yi;
<br /> BLOCKING,€ E ELECTRICAL CONNECTIONS, PLUMBING CONNECTIONS ELECTRICAL
<br /> V G 40�
<br /> XCD LEED LEADERSHIP IN ENERGY � � Cl
<br /> AND ENVIRONMENTAL DESIGN AND OTHER ITEMS REQUIRED FOR A COMPLETE AND OPERATIONAL E-0001 ELECTRICAL SPECIFICATIONS A
<br /> I
<br /> LL LANDLORD INSTALLATION, UNLESS OTHERWISE NOTED. E-0002 ELECTRICAL SPECIFICATIONS 9
<br /> LO LV LOW VOLTAGE E-0003 ELECTRICAL SPECIFICATIONS
<br /> P ,2019
<br /> 13. ALL ITEM SUBSTITUTIONS MUST BE APPROVED BY THE STARBUCKS l'\
<br /> N E-0004 ELECTRICAL NOTES& LEGENDS
<br /> CONSTRUCTION MANAGER. `" -�— ���,•
<br /> cQ MAX MAXIMUM E-1100 ELECTRICAL SITE PLAN OF
<br /> MEP "MECHANICAL, ELECTRICAL E-1101 POWER&SYSTEMS PLAN
<br /> N AND PLUMBING"
<br /> ii MFR MANUFACTURER E-1102 ENLARGED ENGINE POWER/SYSTEMS PLAN
<br /> E-1103 LIGHTING PLAN 5—
<br /> MIN MINIMUM a SCOPE OF WORK SITE INFORMATION E-1104 LUTRON CONTROL DIAGRAMS W
<br /> fY NIC NOT IN CONTRACT s E-1105 ILUTRON CONTROL DIAGRAMS
<br /> NIL NIGHT LIGHT
<br /> O
<br /> p NTS NOT TO SCALENEW STORES. CODE AUTHORITIES: E-1106 LUTRON CONTROL DIAGRAMS
<br /> ~ �
<br /> E-6001 PANEL SCHEDULES &ONE-LINE DIAGRAM Q
<br /> OC ON CENTER TENANT IMPROVEMENT OF LANDLORD DELIVERED SHELL FOR A
<br /> '° BUILDING CODE: 2016 CALIFORNIA BUILDING CODE E-7001 T24 ENERGY CALCULATIONS
<br /> cYj �
<br /> U O.D. OUTSIDE DIAMETER STARBUCKS COFFEE COMPANY. Z
<br /> PLUMBING CODE: 2016 CALIFORNIA PLUMBING CODE MECHANICAL W Q
<br /> PLC PLACE VICINITY PLAN WORK SHALL INCLUDE INTERIOR PARTITIONS, INTERIOR FINISHES, MECHANICAL
<br /> SCHEDULES& SPECIE(CATIONS ❑
<br /> EQUIPMENT, LIGHTING, HVAC, AND RELATED. MECHANICAL CODE: 2016 CALIFORNIA MECHANICAL CODE J
<br /> C)
<br /> Z REF REFERENCE """" NO SITE WORK INCLUDED. ELECTRICAL CODE: 2016 CALIFORNIA ELECTRICAL CODE M-1102 HVAC DETAILS O
<br /> REQ'D REQUIRED M-5001 HVAC SPECIFICATIONS 0 Q
<br /> REV REVISION ENERGY CODE: 2016 CALIFORNIA ENERGY CODE M-5002 HVAC SPECIFICATIONS
<br /> U RNID ROUND 1 LO ILL W
<br /> � Jr3aGum Sharpe L
<br /> € PefenseDepozSanry :- a FIRE CODE: 2016 CALIFORNIA FIRE CODE
<br /> M-6001 T24 ENERGY CALCULATIONS O co
<br /> 1' �
<br /> 0 SB STARBUCKS
<br /> SC SOLID CORE HEALTH CODE: CALIFORNIA RETAIL FOOD CODE PLUMBING no, ❑
<br /> CU SF SQUARE FEET 06 P-0001 PLUMBING SPECIFICATIONS W LJ W0
<br /> SHT SHEET
<br /> ACCESSIBILITY CODE: 2016 CALIFORNIA BUILDING CODE(ADA R-0002 PLUMBING SPECIFICATIONS p Z _j
<br /> SPEC SPECIFICATION ZONING:
<br /> u?I SIM S€ P-0003 PLUMBING SPECIFICATIONS
<br /> 06Q W rn
<br /> n Q O
<br /> SQ SQUARE P-0004 PLUMBING SPECIFICATIONS z V J
<br /> Lathrop
<br /> v7 PARCEL NUMBER: 191-190-64 P-1000 PLUMBING SCHEDULES U U v >"
<br /> TEMP TEMPORARY P-1101 PLUMBING SUPPLY PLAN LU �
<br /> TYP TYPICAL "' PERMITTED TYPE OF USE: RETAIL SALES AND SI=RVICE
<br /> _jI P-1102 PLUMBING WASTE &VENT PLAN O O O W Q
<br /> 00
<br /> UC UNDER COUNTER u'°° SPRINKLED: NO P-1103 PLUMBING DETAILS IL J W 0— U
<br /> LINO UNLESS NOTED OTHERWISE P-1104 PLUMBING DETAILS
<br /> 00
<br /> X VERT VERTICAL LEASABLE AREA: 2,438 SF _P-1 105 PLUMBING RISER DIAGRAMS STORE #: 58278
<br /> m VIF VERIFY IN FIELD CONSTRUCTION TYPE: V-B
<br /> PROJECT #: 83794-001
<br /> LO PROPOSED USE: RETAIL SALES AND SERVICES CASEWORK CONCEPT:
<br /> N ISSUE DATE: 50% CHECKSET
<br /> 00 RESPONSIBILITY PROGRAM MANAGER: Y. CHON
<br /> wa�n,anSupwcenterQ DEFERRED SUBMITTALS: x
<br /> xLEGEND Pelr9ssuinnulytarn y, Bessrreshop} (�} STORE DESIGNER: L. KULiS
<br /> LEED�AP: NIA
<br /> �1 C
<br /> m -
<br /> 0 GC GENERAL CONTRACTOR CHECKED BY:
<br /> o LL LANDLORD v •,o,..J
<br /> CD SB STARBUCKS MGG PROJECT#:
<br /> v WH STARBUCKS WAREHOUSE (3PL) MCG PROJ. MANAGER-vD STARBUCKS VENDOR DIRECT SAN JOAQLfIN COUNTY MCG PROD. SPECIALIST:
<br /> ,�`"tet ENVIRONMENTAL HEALTH DEPARTMENT
<br /> 1868 E. HAZELTON AVE.
<br /> 0 Revision Schedule
<br /> '
<br /> STOCKTON, CA 95205 O
<br /> C
<br /> (209)468-3.42,0 Rev Date By Description
<br /> ❑ oved
<br /> Approved with changes: See Remarks
<br /> ❑Disappro d: See Rem s
<br /> Remark
<br /> Q
<br /> CD Dat SHEET TITLE:
<br /> Approval a tends only a that which is shown and described
<br /> hereon and does not authorize or approve any omission or GENERAL INFORMATION
<br /> rn
<br /> 0 deviation from requirements of state laws or local ordinances.
<br /> rn
<br /> SCALE:AS SHOWN
<br /> O
<br /> N
<br /> �f3 SHEET NUMBER:
<br /> T
<br /> (Y}
<br /> G001
<br />
|