:Mop
<br /> GENERAL NOTES SIGNAGE GENERAL NOTES �, �.
<br /> SN1 MEN'S RESTROOM (REFERENCE A6.0) 1. ALL INTERIOR FINISHES TO BE CLASS 2 OR BETTER.
<br /> 1. OSB IS NOT AN APPROVED CONSTRUCTION MATERIAL AND SHALL NOT BE SUBSTITUTED FOR 5N2 WOMEN'S RESTROOM (REFERENCE A6.Q)
<br /> FIRE TREATED PLYWOOD. 2. CONTRACTOR TO FLOAT AND SCRAPE FLOOR TO BE LEVEL AND PREPARE FOR NEW
<br /> SN3 EMPLOYEES ONLY,
<br /> 2. ALWAYS WATERPROOF DEMISING WALLS IN WET AREAS, INCLUDING BEHIND COOLER/ FREEZER SN4 THIS DOOR IS TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED. (INOTE: THE SIGN SCHEDULED FINISH, AS REQUIRED.
<br /> AND BEVERAGE COUNTER. SHALL BE IN LETTERS 1 INCH HIGH ON A CONTRASTING BACKGROUND.) 3. CONTRACTOR TO RESERVE SPECIFIED FLOORING AND BASE UPON BEING AWARDED THE
<br /> SN5 EXIT TACTILE SIGN'PER LOCAL BUILDING CODE BID TO ENSURE AVAILABILITY AND TIMELY INSTALLATION. SUBSTITUTIONS ARE NOT -
<br /> 3. ALL SUBSTRATES ARE TO EXTEND TO DECK, UNLESS NOTED OTHERWISE. PERMITTED.
<br /> 4. ALL WALL FINISHES IN THE MERCHANDISE/SALES AREAS SHALL BE FRP WALL PANEL"FRP-A"
<br /> KEY NOTES 4. FLOORS IN WET AREAS TO SLOPE TO DRAINS 1/8" PER FOOT, TYP. n
<br /> UNLESS NOTED OTHERWISE ON THE FLOOR PLAN. (REFERENCE SHEET A3.0 FOR MATERIALS 5. PROVIDE A BEAD OF CAULK AT INTERIOR CONDITIONS PER OWNER DIRECTION AND
<br /> SCHEDULE). CONCRETE SLAB TO BE GROOND, SEALED, AND POLISHED WHERE INDICATED ON FINISH PLAN PROJECT NEEDS. CAULK IS TO MATCH COLOR OF ADJACENT MATERIAL.
<br /> - REF: A6.1 FOR MATERIALS SCHEDULE. CONTROL JOINTS TO BE PROVIDED IN CONCRETE PER o
<br /> 5. PROVIDE FULL HEIGHT CORDER GUARDS AND "T" MOLDING AS REQUIRED AT ALL OUTSIDE PLAN - REF: STRUCTURAL. 6. REFERENCE INTERIOR ELEVATIONS FOR WALL FINISHES.
<br /> CORNERS AND PANEL JOINTS. CORNER GUARDS SHOULD BE FOR MATERIAL FINISH SPECIFIED 7. REFERENCE SHEET A6.1 FOR BASE TYPES.
<br /> 5/8" HARDIBOARD 5/8" HARDIBOARD 3/4" FIRE TREATED IN FINISH AND MATERIAL SCHEDULES ON SHEET A6.0. F2.] IF TILE IS USED-TILE TO BE INSTALLED UP TO EDGE OF MOP SINK. s
<br /> 8. FIRE EXTINGUISHER: 910 CLASS ABC WITH UL HATING 4A-603C. SURFACE MOUNTED ON
<br /> ATTACHED W/ I" TYPE 'S' ATTACHED W/ I" TYPE 'S' PLYWOOD ATTACHED 1fl THRESHOLD TO BE SET IN FULL BED OF MASTIC. WALL WITH MANUFACTURERS ALL STEEL WALL BRACKET. JL INDUSTRIES INC. (COSMIC 10E)
<br /> 6. ALL INTERIOR FACE OF EXTERIOR SIP PANEL WALLS TO BE COVERED WITH 1/2" GYPSUM
<br /> SCREWS 8" O.G. ALONG SCREWS ® 8" O.G. ALONG W/ I" TYPE 'S' SCREWS OR APPROVED EQUAL WITH INSPECTION TAG AS REQUIRED BY LOCAL CODES.
<br /> EDGES, 12" O.G. IN THE EDGES, 12" O.G. IN THE C 16" O.G. ALONG BOARD FROM FLOOR TO ROOF DECK TO MEET FLAME SPREAD RATING. ATTACHED W/ 1" TYPE
<br /> FIELD OF THE BOARD. FIELD OF THE BOARD. EDGES IN THE FIELD C @ 4❑ FLOOR SINK/DRAIN PER PLAN, REF. DETAILS ON THIS SHEET& PLUMBING DRAWINGS FOR
<br /> S' SCREWS 8"O.C. ALONG EDGES, 12" O.C. IN THE FIELD OF THE BOARD. JOINTS ORIENTED 9. CONTRACTOR TO INSTALL 7-ELEVEN PROVIDED COAT HOOKS FOR EMPLOYEES. REFERENCE
<br /> LOCATION.
<br /> VERTICALLY AND STAGGERED ON OPPOSITE SIDES OF ASSEMBLY TO BOTTOM OF ROOF DECK. SHEET EF1ITEM 220. INSTALL 2 IN OFFICE AND 3 IN BACKROOM. LOCATION TO BE «
<br /> JOINTS ORIENTED JOINTS ORIENTED OF THE BOARD. v _
<br /> VERTICALLY AND VERTICALLY AND JOINTED ORIENTED ** IF TILE IS USED- CONTRACTOR TO CUT TILE STRAIGHT AND TRUE, NOT LESS THAN 1/2 A TILE. DETERMINED BY CONSTRUCTION PROJECT MANAGER. SEE DOOR HARDWARE SCHEDULES.
<br /> STAOGERED ON OPPOSITE STAGGERED ON OPPOSITE VERTICALLY AND 7• ALL SUBSTRATES ARE TO BE APPLIED OVER AND IN ADDITION TO THE WALLBOARD REQUIRED 10. APPLY 3M SUN CONTROL WINDOW FILMS @ALL SOUTH EAST AND WEST FACING GLASS
<br /> SIDES OF ASSEMBLY TO SIDES OF ASSEMBLY TO STAGGERED ON FOR FIRE RATED WALL CONSTRUCTION DESCRIBED ON THIS SHEET.** L
<br /> TEXTURED PORTION OF RAMP INDICATES DETECTABLE WARNING:ARMOR TILE TACTILE (3M-1). NOTE NO FILM SHOULD BE APPLIED TO THE STOREFRONT DOORS. (REFERENCE
<br /> BOTTOM OF ROOF DECK. BOTTOM OF ROOF DEGK. OPPOSITE 51DE5 OF SURFACE, BRICK RED. SIZE AND PATTERN SUBJECT TO LOCAL AND STATE REQUIREMENTS; SHEET A6.1 FOR MATERIALS SCHEDULE), �_
<br /> Ll
<br /> ASSEMBLY TO BOTTOM REF CIVIL SHEETS L 'E
<br /> OF ROOF DEGK. 11. G.C. TO FURNISH AND INSTALL RIS BACKBOARD AT ISP DESK. REFERENCE MATERIALS �, o O s
<br /> T-5 (REF MATERIAL FRP-I (REF MATERIAL FINISH LEGEND REFER TO CIVIL DRAWINGS FOR EXACT REQUIREMENTS FOR RAMP, STRIPING AND TACTILE SCHEDULE ON SHEET A6.1. r J _� N S
<br /> -
<br /> SCHEDULE) �-
<br /> ADHERE PER SCHEDULE) ADHERE PER SC-1 GRIND, SEAL AND POLISH CONCRETE SURFACE LAYOUT. 12. PROTECT SURROUNDING AREAS AND SURFACES FROM DUST, CONTACT WITH OVERSPRAY 0
<br /> MANUFACTURERS MANUFACTURERS FROM DENSIFIER, PROTECTIVE SURFACE TREATMENT, &JOINT FILLER, CLEAN SURFACES u?' E
<br /> j, REGOMMENDATIONS RECOMMENDATIONS SC-2 ONLY GRIND AND SEAL CONCRETE IF SIDEWALK DEPTH IS BETWEEN U-0"AND I IN FRONT OF EQUIPMENT, CURBSTOPS OR FROM DUST, DEBRIS, OIL, GREASE, CURING AGENTS,AND OTHER SURFACE CONTAMINANTS L -0 3
<br /> E \ BOLLARDS MUST BE PROVIDED ON PARKING SPACE' SIDE OF CURB. TYP. THAT MAY ADVERSELY AFFECT INSTALLTATION OF POLISHED CONCRETE. 3
<br /> ONLY SEAL CONCRETE ra.-+ � Ln
<br /> 01
<br /> 13.. REFERENCE SPECIFICATION SECTIONS 033000 CAST-IN-PLACE CONCRETE AND 033536
<br /> CONTROL/CONSTRUCTION JOINTS -SEE DETAILS ON S2.1. O
<br /> POLISHED CONCRETE FLOOR FINISH DATED 02-26-2018, PROVIDED BY 7-ELEVEN, FOR ALL
<br /> J
<br /> O O 10. ALTERNATE FLOORING FINISH- WHEN SEALED CONCRETE IS NOT APPLICABLE-8" (33%) NEW INTERIOR CONCRETE FLOORS.
<br /> OFFSET RUNNING BOND PORCELAIN TILE FLOOR PER MATERIAL SCHEDULE ON A6.1. 24" EDGE oc
<br /> OF TILE TO RUN PARALLEL WITH ENTRY STOREFRONT. BEGIN FULL SIZE TILE AT EDGE OF
<br /> FRP-1 (REF MATERIAL ENTRY THRESHOLD `
<br /> SGHEDULE) ADHERE
<br /> 1I.
<br /> ,
<br /> PER MANUFACTURERS
<br /> REGOMMENDATI ONS
<br /> �D ARC
<br /> 5/8" HARDIBOARD :............. ........................... ........................................................................................... h,
<br /> ,
<br /> ADHERED TO COOLER
<br /> d
<br /> D
<br /> T
<br /> �Ci e
<br /> G
<br /> C�
<br /> Q
<br /> n
<br /> VAULT. STAPLE .
<br /> a __._.._............................ - C 8827
<br /> „, „w ,,.,�.__._._.�
<br /> ` PERIMETER AT 12 O.G. I �,.,,,,,, .. cn Q
<br /> r._ °`I
<br /> c - m
<br /> Sc-3 PLY € ILEI R2 KEVVA
<br /> ... L o�
<br /> ELECTRICAL F �vson, F
<br /> P y
<br /> STORAGE p °� cA�
<br /> PLY ILf� ILIrIZ l L
<br /> IBU ONLY @ COOLER VAULT FRC ONLY @ COOLER VAULT PLY ® 107
<br /> ............................................................................................................................. 0 SC-2 i,.........................` ,,.....,....,,,.,..,...,, li.,
<br /> i
<br /> IBC -
<br /> ,;
<br /> IL�11 SIM / I.
<br /> I
<br /> ,
<br /> ,
<br /> 8. ... 1 x
<br /> ✓/8" GYP. BD. (PAINTED 5/8" GYP. BD. (PAINTED 5/8" OYP. BD. (PAINTED SC-1 TYPICAL FLOOR ;j
<br /> REF INTERIOR ELEVATIONS) REF INTERIOR ELEVATIONS) REF INTERIOR ELEVATIONS) I IBI; ® IBC GLEAN OUTS -SEE f
<br /> ATTACHED W/ I" TYPE 'S' ATTACHED Al I" TYPE 'S' uj
<br /> ATTACHED W/ 1" TYPE 'S' I<< I PLUMBING PLANS
<br /> ALL ®ENDER ILMI FOR EXACT
<br /> SGREW5 ® 5" O.G. ALONG 5GREW5 @ 8" O.G. ALONG SCREWS ® 8" O.G. ALONG RESTROOM II IX11 17
<br /> EDGES, @ 12" O.G. IN THE EDGES, ® 12" O.G. IN THE EDGES, @ 12" O.G. IN THE V_NLOCATIONS '*"
<br /> FIELD OF THE BOARD. FIELD OF THE BOARD. FIELD OF THE BOARD. 109
<br /> JOINTS ORIENTED JOINTS ORIENTED JOINTS ORIENTEDIL
<br /> IBG O ,`
<br /> VERTICALLY AND
<br /> VERTICALLY AND VERTICALLY AND
<br /> STAGGERED ON OPPOSITE 5TACGERED ON OPPOSITE STAGGERED ON OPPOSITE ": ': ;=,l,yuj
<br /> SIDES OF ASSEMBLY TO SIDES OF ASSEMBLY TO SIDES OF A5SEMBL.Y TO ' - TYPIGAL FLOOR j
<br /> BOTTOM OF ROOF DECK. BOTTOM OF ROOF PECK. BOTTOM OF ROOF DECK. HALLWAY SINKS -SEE q -', ■♦�
<br /> �3 ILAI1 110 PLUMBING PLANS \ �,. *„
<br /> `i`ll
<br /> :,• -,
<br /> T-2 (REF MATERIAL T-I (REF MATERIAL T-5 (REF MATERIAL FOR EXACT IN
<br /> SCHEDULE) ADHERE PER SCHEDULE) ADHERE PER SCHEDULE) ADHERE PER LOCATIONSuj
<br /> MANUFACTURERS MANUFACTURERS MANUFACTURERS lLtu41
<br /> RECOMMENDATIONS RECOMMENDATIONS RECOMMENDATIONS I co
<br /> .................. TYPICAL TYPICAL FLOOR :r:::..... .... :}. Y
<br /> I DRAINS -SEE ; `}
<br /> IBC PLUMBING PLANS I
<br /> ALL GEND�
<br /> 'II
<br /> 0 RESTROOM
<br /> FOR EXACT
<br /> IBC 111 ILN LOCATIONS MERCHANDISE 1' 0 Lu
<br /> ......i u � � 104
<br /> I ' SC-1 IBC I
<br /> REFER TO SHEET It
<br /> II` SC 1 A4.1 FOR FLOOR COOLER "r O
<br /> THROUGHOUT FINISHE5 (TYP) w VAULT
<br /> it
<br /> 5/8" MOISTURE RESISTANT 5/8" MOISTURE RE515TANT 5/8 MOISTURE RE515TANT , :€.....c........ ... <<
<br /> . , ._. 1 106
<br /> GREEN GYP BD GREEN GYP BD GREEN GYP BD _...._._._r.._ , m, m;;.;,' I ::
<br /> ATTACHED TO METAL ATTACHED TO METAL ATTACHED TO METAL SC-3 L
<br /> [t �� 1uj.
<br /> STUDS W/ 1-1/4 HOT DIPPED STUDS W/ 1-1/4 HOT STUDS W/ 1-1/4 HOT {FRPI I ` ^� 0 ,
<br /> GALVANIZED SGREW5 @ 8" DIPPED GALVANIZED DIPPED OALVANIZED F_
<br /> O.G. SGREW5 C� 8" O.G. SGREW5 @ 5" O.G.
<br /> FRP „_,,,,
<br /> H �
<br /> ® ._..............._ \ Z
<br /> W Q
<br /> i \Ki
<br /> z Q It?
<br /> Wuj
<br /> FRP1 _ POLISH GONGRETE POST TENSION \ > C
<br /> uj
<br /> L
<br /> ILLI ONLY @HOT FOODS ILf�1 IL2 SLAB CONSTRUCTION. DEVELOPER \ Q U
<br /> PREP AREA
<br /> 2
<br /> OF SHELL BUILDING WILL NOT :_ p = W
<br /> LLOW SAW GUT CONTROL JOINTSZf
<br /> IE A LIJ z
<br /> ------- _
<br /> FRP I v
<br /> 5/8" GYP. BD. (PAINTED 5/8" EYP. BD. (PAINTED SALES
<br /> :.................3 iu
<br /> c
<br /> 1azA-1 �E Lu
<br /> Z O
<br /> li
<br /> i......_ k � ,� T
<br /> REF INTERIOR ELEVATIONS) REF INTERIOR ELEVATIONS) I (V
<br /> FRP1....................... .........?-` BACK SC-1 \ F- ,- v>
<br /> ATTACHED W/ I" TYPE 'S' ATTACHED W/ I" TYPE 'S' €
<br /> SGREW5 @ 8 O.G. ALONG SGREW5 g 8 O.G. ALONG ;
<br /> EDGES, @ 12" O.G. IN THE EDGES, @ 12" O.G. IN THE ROOM I IN
<br /> IN
<br /> FIELD OF THE BOARD. FIELD OF THE BOARD. v, �
<br /> 103 , � REVISIONS.
<br /> JOINTS ORIENTED JOINTS ORIENTED FRP1 FFICE SC-2 `r
<br /> I SIM
<br /> IKI
<br /> 14 � F,,
<br /> VERTICALLY AND VERTICALLY AND I
<br /> FRP1 ; 8.
<br /> L
<br /> 5TAGC-�ERED ON OPPOSITE STAGGERED ON OPPOSITE 112
<br /> SIDES OF ASSEMBLY TO SIDES OF ASSEMBLY TO SC 2 FRPI ILM2
<br /> BOTTOM OF ROOF DEGK. BOTTOM OF ROOF DEGK,.
<br /> _L AlL
<br /> PAINT ABOVE FRP (REF, PAINT ABOVE FRP (REF. I FRP1 -
<br /> I
<br /> INTERIOR ELEVATIONS) INTERIOR ELEVATIONS)
<br /> P \t STORAGE L 1
<br /> 105oPIII L
<br /> 1114 DRANK: 0. MEDIA
<br /> U;
<br /> FRP1 ENTRY ILMd2 P SC-2
<br /> ry
<br /> 101 DATE: 01/10/2018
<br /> O 0 W
<br /> o p sc-1
<br /> >_
<br /> { , Ip1 ILM2 3 ILfrl2 ILkl2 P J FILE: 42-7-A43
<br /> T-I (REF MATERIAL
<br /> _ 1:.._L.' �LI JOB: -10.427
<br /> FRP-I (REF MATERIAL FRP-A (REF MATERIAL SGHEDULE) ADHERE PER -- -- -- -_ __..... _ _--
<br /> SCHEDULE) ADHERE PER SCHEDULE) ADHERE PER
<br /> MANUFACTURERS
<br /> MANUFACTURERS MANUFACTURERS
<br /> RECOMMENDATIONS _._._.................................................................................................................................... >
<br /> RECOMMENDATIONS
<br /> RECOMMENDATIONS ONS
<br /> 5/8" MOISTURE RESISTANT
<br /> GREEN CYP BD
<br /> NORTH WALL AND
<br /> ATTACHED TO METAL
<br /> STUDS W/ 1-1/4" HOT DIPPED
<br /> P-
<br /> 6ALVANI ZED SGREW5 @ 8" '
<br /> FLOOR FINISH
<br /> � IS
<br /> O.G.
<br /> " PLAN
<br /> FRP IBC ONLY @ RESTROOMS
<br /> . .I
<br /> ' �2
<br /> I <r w
<br /> 1? 1" SUBSTRATE AND WALL FINISH TYPES g 1,4°' WALL AND FLOOR FINISH PLANA4 . 3
<br /> �u
<br />
|