								    - HOOD ELECTRICAL PLAN NOTES 
<br />DIVISION 16 - GENERAL ELECTRICAL - 
<br />GENERAL 
<br />1 INSTALL ALL ELECTRICAL IN THIS WORK PER LATEST NEC AND CITY OF STOCKTON BUILDING DEPT. 
<br />REQUIREMENTS. FLEXIBLE CONDUIT MAY BE USED BUT MUST CARRY GROUND WIRE TO BOX. SWITCH 
<br />LIGHTING AS INDICATED ON DRAWINGS. ALL CIRCUITS SHALL BE MARKED TO INDICATE AREAS SERVED. 
<br />PROVIDE ADDITIONAL CIRCUITS AS REQUIRED BY OTHER TRADES. GENERAL ELECTRICAL MAYBE RUN IN 
<br />FLEXIBLE METAL CONDUIT, MC OR EMT. SETSCREW FITTINGS ON EMT. MC CABLE TO USED IN CONCEALED 
<br />WALL OR CEILING. INSTALL ALL FIXTURES PER MFG REQ. USE ONLY APPROVED AND LISTED EQUIPMENT. 
<br />CONDUCTORS SHALL BE COPPER CONDUCTORS TYPE THWNITHHN. USE CONNECTORS APPROVED FOR 
<br />RELATED WIRE SIZE. THE USE OF STRANDED OR SOLID APPROVED. USE STRANDED FOR SIZES #8 OR 
<br />LARGER 
<br />3. ALL WORK SHALL CONFORM TO THE CEC 2013 EDITION AND TO THE APPLICABLE REQUIREMENTS OF LOCAL, 
<br />STATE, AND FEDERAL CODE(S) AND/OR AGENCIES HAVING JURISDICTION; AND SHALL TAKE PRECEDENCE 
<br />OVER WORK SHOWN. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTIONOF THE DESIGNER 
<br />PRIOR TO THE INSTALLATION OF WORK. 
<br />4 ELECTRICAL CONTRACTOR SHALL VERIFY DIAGRAMMATIC LAYOUT OF ELECTRICAL WORK WITH OWNER 
<br />PRIOR TO INSTALLATION. 
<br />5• SEE ELECTRICAL SYMBOLS, VERIFY ALL SYMBOLS AND CONDITIONS AS REQUIRED PRIOR TO INSTALLATION. 
<br />JOB CONDITIONS 
<br />ELECTRICAL DRAWINGS: THE ELECTRICAL DRAWINGS, AS CONTAINED, ARE ESSENTIALLY 
<br />6. DIAGRAMMATIC AND ALTHOUGH THE SIZE AND LOCATION OF EQUIPMENT ARE SHOWN TO SCALE 
<br />WHEREVER POSSIBLE CONTRACTOR SHALL MAKE USE OF ALL DATA AND VERIFY THIS 
<br />INFORMATION AT THE BUILDING SITE. THE DATES INDICATED ON THE DRAWINGS AND IN THE 
<br />JOB CONDITIONS AND DECISIONS OF THE DESIGNER WILL GOVERN EXACT LOCATIONS, 
<br />DISTANCES, LEVELS, AND OTHER CONDITIONS. 
<br />OPERATION: 
<br />7 THE SYSTEM SHALL BE COMPLETE AND FULLY FUNCTIONING TO THE SATISFACTION OF THE DESIGNER AND 
<br />THE OWNER. INSTALL ALL CIRCUITS, J-BOXFS, WIRING DISCONNECTS AND ANY OTHER EQUIPMENT NEEDED 
<br />TO PROVIDE ELECTRICAL SERVICE FOR SIGNAGE. 
<br />g. DRAWINGS - 
<br />THE LAYOUT OF LIGHT FIXTURES ARE TO BE DIVIDED IN THE ROOM AS SHOWN ON THE PLANS. ANY Questions 
<br />ABOUT LAYOUT SHOULD BE DIRECTED TO THE ENGINEER. UPON COMPLETION OF THE INSTALLATION, 
<br />FURNISH A SET OF 'RECORD' (AS -BUILT) DRAWINGS TO THE DESIGNER CLEARLY MARKED WITH THE 
<br />CHANGES AUTHORIZED DURING CONSTRUCTION, CUTTING NOTCHING DRILLING CONTRACTOR SHALL BE 
<br />RESPONSIBLE FOR ALL WORK HEREIN INCLUDING CUTTING, BORING, NOTCHING, FURRING AND DRILLING AS 
<br />NECESSARY TO COMPLETE THIS PROJECT. "NOTE: NO CUTTING, BORING, NOTCHING, FURRING AND 
<br />DRILLING OF TRUSS OR OTHER STRUCTURAL MEMBERS WILL BE ALLOWED. CONTRACTOR SHALL 
<br />COORDINATE WITH OTHER TRADES TO ALLOW FOR GROUP RUNS AND ELIMINATE ANY OVERLAPPING OR 
<br />OBSTRUCTION. 
<br />9. 
<br />WORKING CLEARANCES 
<br />WORKING CLEARANCE REQUIREMENTS FOR ALL ELECTRICAL EQUIPMENT INCLUDING DISCONNECTS WILL BE 
<br />MAINTAINED AS PER CEC 2010 ARITCLE 110.26 
<br />10 COMPLETION OF WORK AND TEST 
<br />THE ENTIRE ELECTRICAL SYSTEM SHALL BE FREE FROM ANY SHORT CIRCUITS, AND IMPROPER GROUNDS. 
<br />DEMONSTRATE WITH THE OWNER AND DESIGNER THAT THE ENTIRE INSTALLATION IS COMPLETE AND IN 
<br />PROPER OPERATING CONDITION. 
<br />i 
<br />1. Dur;ng i of -,nal operation, both exhaust -fan 
<br />ant MaKeup a in on position 
<br />20 When Ansel Sys tem is acUva+ed, make up 
<br />air hooch lights c:nd all elect{ ice devices VV '11 
<br />the hood Will be cuterrc-Jtically -1.ur-ned Off. 
<br />H 0 0 D E X I A lil/ I- I_ A U 0 ISI A C �! Y B E 
<br />LJRN!ED 0, all elec;tri!;;a e guipmen-T, dev1ce S, 
<br />receptacles, lighting; etc. to be loca Led within 
<br />and under i.he hood footprint. 
<br />All receptacics (net,,, and existing) in all 
<br />l 
<br />kitchen food prep areas siia'll be GFC 
<br />prote(-ted. 
<br />FastlWraW"k' XL 
<br />AJ Them I Cemmics 
<br />C4mmer ia[ Kitchen Grease Duct Enclosure System 
<br />Air Ventilation Duct Ertctosure Systettt 
<br />f res:op art rated Rocr and wail assemblies FastWrap XL as UL 
<br />%IaGsilted and is port Df Lit.'s Lis;itig and Foilow-Up Service 
<br />Program to ensure the •;c-nilstent g%iahty essential to the criti- 
<br />cal nature of this fife -safety application.. 
<br />Product Features 
<br />• Zero clearance to ceni"vtibles at anY locaticn 
<br />Thin and Lightweight at 1-1)2 inch think, 6 pc.f density 
<br />• Contours easily to complex duct designs 
<br />• 
<br />Buttjointson Inside layer • Aa'rd labor, space, 3rd rAater,a: 
<br />• Fully rail encapsulated for fast and clean installation 
<br />Completely inorganic and non-aornbustiiaie 
<br />Contains 2C@0°F rated I bees For added safety margin 
<br />Contains na loin temperature rninerai or glass fibers 
<br />Wide variety of through penetration systems 
<br />Resistant to mold growth 
<br />• Extensive Listings and dat1114d installahon irstn:cticn.s 
<br />Oftrereel in 60 and 100 square fact roils 
<br />Available in 48 inch widths for less joints and installation 
<br />labor 
<br />Reference Standard Standard No. 
<br />Pe-rformance 
<br />Prcduot Data & Instaflatiort Guide 
<br />pass 
<br />t. Froiluct Description 
<br />Pass 
<br />6Cerarritls' new FlreMaster ;:MtVlrir '9L is the 
<br />Pass 
<br />tta;en"t and lightest flexible wrap rnaterial.availaiaie tat pass- 
<br />$ 
<br />es the AS -T64 E 2335 test:standard required by the 2000 IMC 
<br />Pass 
<br />and NFPA Lad for reduced ctearaneo enclosure matonals used 
<br />Pass 
<br />io provide I or 2 hour fire rating for kitchen exhaust ducts. 
<br />_ 
<br />f'astWrap XL is alas VL Ctassiried and Labe:ed per 130 0944 
<br />5�v 
<br />a9 ar alternative to a t or 2 hour rated e-nciosure for air vent!- 
<br />lation ducts The FaslWrap XL core blan$iet is manufactomd 
<br />4 2s :h 
<br />using Thermal Ceramics patented Suyerwooil� fiber. a 2400'F 
<br />Res'str: 
<br />rated, non-comt)u%tita!e, slkar:rte-earth 34:1icata wool with low. 
<br />Pass 
<br />biopersistence. FastWrap XL is the product of extensive 
<br />Pass 
<br />rosoarch and developrnont resuhing In break•thrcugh improva- 
<br />. N...,x 
<br />rnents in stgodicart tnhancerrnerts 
<br />in thermal properties beneficial to Eire protection apptleatiOns- 
<br />PastWrap XL when u*eti in t:vmbin,atlon with an approved 
<br />q;rostop sealant provides an o"ective through penetration 
<br />A. Performance 5peciCnations 
<br />f res:op art rated Rocr and wail assemblies FastWrap XL as UL 
<br />%IaGsilted and is port Df Lit.'s Lis;itig and Foilow-Up Service 
<br />Program to ensure the •;c-nilstent g%iahty essential to the criti- 
<br />cal nature of this fife -safety application.. 
<br />Product Features 
<br />• Zero clearance to ceni"vtibles at anY locaticn 
<br />Thin and Lightweight at 1-1)2 inch think, 6 pc.f density 
<br />• Contours easily to complex duct designs 
<br />• 
<br />Buttjointson Inside layer • Aa'rd labor, space, 3rd rAater,a: 
<br />• Fully rail encapsulated for fast and clean installation 
<br />Completely inorganic and non-aornbustiiaie 
<br />Contains 2C@0°F rated I bees For added safety margin 
<br />Contains na loin temperature rninerai or glass fibers 
<br />Wide variety of through penetration systems 
<br />Resistant to mold growth 
<br />• Extensive Listings and dat1114d installahon irstn:cticn.s 
<br />Oftrereel in 60 and 100 square fact roils 
<br />Available in 48 inch widths for less joints and installation 
<br />labor 
<br />Reference Standard Standard No. 
<br />Pe-rformance 
<br />Creast Duct Enclosure System ASTM i;.Z:30 
<br />pass 
<br />2,ect .• t8 l - .`on- A:T1.1 r— .t.. 
<br />G'OiY.lrStllvtl'ty 
<br />Pass 
<br />Ressance AaTM E,i'a 
<br />iwail'i 
<br />Pass 
<br />Esct:a*. `6.3 - Durab,lny 7+s; AwTM 'MA 
<br />Pass 
<br />Seen t5-< - "aural Fire Test ASTM c'.'3 6 
<br />Pass 
<br />rire Enii ^i 
<br />-duck ASTMc' 4E`I� 
<br />Pass 
<br />Surface Burning [IiaiaLOFfI5t1Gs 
<br />F dint Spead ii¢%'blar:hetl ASTM E54 
<br />5�v 
<br />_rrroke Develoce4 A3TM EEA 
<br />T-hemal es!stance iR-v«tue ASTtS .'fi 10 
<br />7D'F) 
<br />4 2s :h 
<br />Maid Grow* 17556 -95% A,TM D9328 
<br />humidity) 
<br />Res'str: 
<br />Air Ventilation must Enelasure 1 :� 11 4 
<br />Pass 
<br />Grease timet Enclosure System JUL t97,S' 
<br />Pass 
<br />nrr'M.•r .wt -I rY�. ni. r., ,k err .-M1-.s x•YNr-,. �.'�ernu 
<br />. N...,x 
<br />2. Applications 
<br />• Applied in 2 layers to provide i or hour fire protection to 
<br />grease ducts exhausting Type t hoods per 2006 WC. Nr FA S LtstiegsiMuitding Cndk Reports 
<br />0 and 2006 IAPMO. UMC 
<br />• Applied in t Payer as an akematwe to a T or 2 hour rated 
<br />sled uses 
<br />eri,60sure for air Ventilation oucis 
<br />3. Phy5imai Charaoteristias 
<br />Product 
<br />;Unrt Sixe 
<br />UnitlI YVf.7 
<br />Can- Ctrt. 
<br />Fs56� ry Xi 
<br />li '1-1:C^ N 24, X �5' 
<br />1 37 $1L�. 
<br />Fast"Nran Y1. 
<br />Rall t. 1''^ a �i v 24' 
<br />1 7 Ebs. 
<br />Fasr4'nno X� Cotiar 
<br />Rall I-tf=' s d' , `b' 
<br />4 37 ° lbs. 
<br />Caor 
<br />White btankel rrilh stwi'nil enaapstAafca 
<br />Li 
<br />Agency 
<br />11511119 
<br />`.'i5$ Duct f',nV1'J'iu re .o}fS:iiT: i�STC 
<br />Ieara�l�e} - AC I � -, ;F.3T)A E2:tir2s 
<br />AREA LOAD 112 
<br />v.-jra5*Duct Enc fas.fe::ySxm?Zerc 
<br />uk,JxJ trej -AF7,M E2?3'' 
<br />IGC -E,' 
<br />G3:R22!,; 
<br />Throuin?eretaacmEireS;opSy-ter^-ASTM1j,L 
<br />cc.4; L 
<br />5•seF!gWii 
<br />VenS3tan Duct Eerdosum System - ISO 6P.4 
<br />[JL 
<br />J' 3 
<br />91411 n!A CToi ItITI IDAI 11tH TC.viii 
<br />STRUCTURAL CALCULATION HOOD 'I 
<br />TRIBUTARY AREA: 114 (4 HANGING ANGLES, 1 AT EACH 
<br />CORNER) 
<br />HOOD LOAD: 449 LBS TOTAL 
<br />280 LBS (TOTAL HOOD WEIGHT) / 4 (TRIBUTARY AREA) = 112 LBS PER THREADED ROD 
<br />112 LBS < 60,000 LBS (THREADED ROD TENSILE STRENGTH CAPACITY) = OK 
<br />0 
<br />TRIBUTARY 
<br />AREA LOAD 112 
<br />LBS PER BOLT 
<br />4 
<br />0 
<br />�— MANUFACTURERS HOOD 
<br />HANGING ANGLES. SEE HOOD 
<br />DRAWINGS, SHEET H1 
<br />HOOD WEIGHT 
<br />DISTRIBUTION DIAGRAM 
<br />STRUCTURAL CALCULATION HOOD 2 
<br />TRIBUTARY AREA: 114 (4 HANGING ANGLES, 1 AT EACH 
<br />CORNER) 
<br />HOOD LOAD: 564 LBS TOTAL 
<br />564 LBS (TOTAL HOOD WEIGHT) 14 (TRIBUTARY AREA) = 112 LBS PER THREADED ROD 
<br />141 LBS < 60,000 LBS (THREADED ROD TENSILE STRENGTH CAPACITY) = OK 
<br />0 
<br />TRIBUTARY 
<br />AREA LOAD 141 
<br />LBS PER BOLT 
<br />o 
<br />O 
<br />- HOOD DETAIL'S 
<br />SCALE: 1" = V-0" 
<br />MANUFACTURERS HOOD 
<br />HANGING ANGLES. SEE HOOD 
<br />DRAWINGS, SHEET H1 
<br />-• — HOOD WEIGHT 
<br />DISTRIBUTION DIAGRAM 
<br />- (E) ENGINEERED 
<br />WOOD TRUSSES 
<br />(3) TOTAL DIAGONAL 
<br />STEEL L1 -112x1 -112x3116 
<br />WELDED SOLID 
<br />FRAMES (1 EACH 
<br />SHORT END AND 1 
<br />ACROSS FRONT OF 
<br />HOOD) 
<br />APEX 
<br />ARCHITECTURE 
<br />845 S. Commerce Street 
<br />Stockton, CA. 95206 
<br />(209) 662-4874 
<br />apexplanning@hotmail.com 
<br />Steven Anthony Torres II 
<br />Architect # C32553 
<br />PROPERTY OWNER 
<br />Francisco Javier Llamas 
<br />CONTRACTOR 
<br />tbd 
<br />EL GRULLITO 
<br />RESTAURANT T.I. 
<br />STOCKTON 
<br />1687 N. Californian Street, Suite #3 
<br />Stockton, CA. 95204 
<br />HOOD DETAILS 
<br />AR 
<br />EIC# C 32553 
<br />REN. 3-31 j9/s 
<br />�p � 
<br />fi c - 
<br />REV.# HATE tSSUED DESCRIPTION 
<br />APEX PROJECT 18-19 
<br />DATE:10-14-2018 
<br />All 
<br />DATE Copyright APEX 
<br />
								 |