Laserfiche WebLink
11. Please include a copy of any studies ( soils , geology, marketing, <br /> etc. ) that you may have had prepared for this project or project <br /> site. NONE <br /> C. PROJECT CHARACTERISTICS <br /> 1. Services: Indicate how the following services will be provided <br /> for your project and availability of service. <br /> a . Water Supply: CEN T Rh L W ATE?- SY sTF M <br /> b. Sewage Disposal :_ S'EM C TW KS <br /> C . Storm Drainage: CEW-KhL PoIJD <br /> If an extension of any of the above is necessary, indicate <br /> which service( s ) , what agency will be providing the <br /> service(s ) , -and the distance of the extension( s ) : <br /> NoN E K-EQLA (QED <br /> d. Natural Gas : 14E <br /> e. Electricity: P. Cr. T, E <br /> f . Road/Access ( i .e . , paved, unpaved, public/private, road name ) : <br /> _ P AV ED , PUB l_l C , 806-G-(A MO ROAD <br /> g. Fire: WATE1ZLL)0 Distance to nearest fire..station: 3 �VItL�S <br /> h . Schools: LINDEN UNIFIED <br /> 2 . Describe any site alterations which result from the proposed pro- <br /> ject (specifically address the amount and location of grading, <br /> cuts and fills, vegetation removal, alterations to drainage, <br /> removal of existing structures, number of trees removed, etc. ) . <br /> MIn10(Z G-fzADIfJGr TO (�n NSTF-UCi ST(zE E i S <br /> hN D tL-KN INA GE <br /> 3 . Air Quality Information: <br /> Number and type of vehicles associated with completed project <br /> Types of emissions and sources associated with project <br /> Fuel sources (and amounts ) to be consumed by or as a result of the <br /> completed project <br /> Will the project result in substantial air emissions or deteriora- <br /> tion of ambient air quality? XNO YES <br /> 4 . How much agricultural land will be removed from production? <br /> 3-7 INCF-E S <br /> Irrigated X Not irrigated <br /> Major Subdivision - 9 - (6/86 ) <br />