Laserfiche WebLink
Describe any trees or vegetation to be removed: A few oak trees will be <br /> removed. Large Oak groves will be retained. <br /> Describe the haul route to the public road and the means of dust <br /> control : Gravel road will be oiled. <br /> Amount and source of water used: S acre pond average dept. 12 feet. <br /> Processing plant needs about 3 million gallons/day. Well water needs are <br /> 300,000 gallons per day. <br /> Describe the method of water disposal : Pond water reused in processing. <br /> Describe the means of preventing water pollution and turbidity <br /> increases in ground and surface water : No chemicals to be used. No <br /> streams to be excavated. No increase in runoff to off-site streams to be caused <br /> by excavation. Final grade to be lower than surrounding area. <br /> If the project adjoins any river course, levee, floodplain or other <br /> water feature, describe the hydrology and proposed means of pro- <br /> tecting the watercourse• Rate of runoff will decrease as hills are <br /> replaced by flater terrain. <br /> REHABILITATION <br /> Describe the ultimate use of the property when the project is <br /> complete• Will be retured to pasture or fish ponds. Any area retured <br /> to pasture will be revegetated as recommended y the Stockton SCS Office. <br /> Describe the rehabilitation schedule. If the excavation will be <br /> conducted in phases , clearly describe the phasing. Attach charts , <br /> maps, or diagrams to show what operations will be conducted in each <br /> area during each phase• 16.6 acres per year will be processed. Total <br /> of 30 years. <br /> Refer to exhibit. <br /> State the proposed means of financial Ty guaranteeing rehabilitation <br /> of the excavation: Rehabilitation will be done as material is removed. A <br /> faithful performance $20,000 bond will be put up per phase. <br /> Quarry Excavation - 12 - ( 7/84 ) <br />