Laserfiche WebLink
VI. OESCRIP'TION OF ENVIRONMENTAL EFFECTS P�9Q 1I <br /> Describe all effects which were Identified in <br /> Identify Possible mitigation measures for eachssitnin'�� <br /> and which are or may be significant. <br /> EFFECT <br /> # FROM SECTION V g flcant effect. <br /> MITIGATION MEASURES <br /> A. I. a, b, c, d. Project involves the permanent removal of eight <br /> million cubic yards of material, covering ± 500 <br /> ° Provide additional details on stream <br /> acres. Will result in the permanent modification location and incorporate in the site <br /> of the site. Site is crossed b 11 �� design. <br /> (per USGS topo) with intermittant flow.minostreams <br /> for erosion and siltation as a result of thisntial o Provide detailed reclamation <br /> Plan <br /> use, both on- and off-site. (could be incorporated in an EIR) . <br /> Scale of the project could be lessened; <br /> scale down the project to remain out- <br /> A.2.c. side of the stream areas. <br /> Grading, quarrying, processing, truck traffic <br /> will create dust. Project is located in a <br /> remote <br /> will partially mitigate;otherdust aconhich <br /> .trolling measures such as revegetation <br /> of all cut or exposed slopes, and <br /> A-3-a(2) & sealing internal access roads can beaus d'. <br /> D.2 Project will use approximately three million <br /> gallons of water per daAdditional <br /> Of <br /> which information is needed to ensure <br /> that there are no potentially significant <br /> gallons will be pumped fromground wa00tter (from <br /> on-site well) . Potential for drawdown of the effects. <br /> aquifer and of other wells in the area being <br /> affected. <br /> A.3.b(1) , (2) , (3) Several streams cross site <br /> as Several <br /> streams" (Per USGS, classified Additional information <br /> Gated as such on the siteSelaaVe not been indi- drainage and the effectseofathe nuse oon <br /> will substantially alter site. Proposed use the watercourses ieses necessary. It may <br /> watercourses as a result of the use aare ct ounknown. also be appropriatey <br /> Project may also result in drainage-related neartheto minimize grading/ <br /> quarrying near the existing watercourses. <br /> problems on- and off-site. Amount of increase in <br /> on-site runoff is unknown. <br />