Laserfiche WebLink
Comments: <br /> Initial inspection done on this date and the following was noted: <br /> No violations or areas of concern. <br /> Notes: <br /> 1.)TPID certificate is posted in the shop office. <br /> 2.)Waste tire manifests from "Delray Tire and Retreading"were on site and available for review. <br /> 3.) Permission to conduct inspection granted by Steve Garcia (Safety Director). <br /> 4.)Waste tires were counted directly. 11 waste (used)tires were stored inside of the shop and 23 waste tires <br /> were stored outside the shop. <br /> 5.) Retain all waste tire manifests, disposal receipts, and logs for 3 years. <br /> 6.) Facility only stores its waste tires at this location. <br /> 7.) Inspection report will be emailed to jdelgado@calfreight.com <br />