Laserfiche WebLink
JNIPIED PROGRAJM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> Vi. UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1, UDC MONITORING 1S PERFORMED USING THE FOLLOWING METHOD 490,54. <br /> 1$ 1.CONTINUOUS ELECTRONIC MONITORING [12-FLOAT AND CHAIN ASSEMBLY r] 3.ELECTRONIC STAND-ALONE <br /> 490.74b <br /> ❑ 4.NO DISPENSERS 099.OTHER(Specify): -57 :MODEL i� <br /> PANEL MANUFACTURER: 490O 490-56. <br /> -------- ------ <br /> LEAK SENSOR MANUFACTURER: 470-57 MODEL#(S): — 490.58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLF AND VISUAL ALARMS �$a.YtS ❑b-NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP 5HUTDOWNa.YES ❑b.NO 490-60. <br /> FAILURE 1 DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a YES ❑b.NO 490-61 <br /> UDC.MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER a.YES b.NO 4042 <br /> 2.UDC CONSTRUCTION IS -63❑2.DOUBLE-WALLED 490-63 <br /> If DOUBLE WALLED: d9063'a' <br /> VUDC INTERSTITIAL SPACE IS MONITORED BY: ❑1_L1 UUID 2,PRESSUREQ 3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS Q a.YES ❑b.NO ` 497546 <br /> VII.PERIODIC SYSTEM TESTING <br /> 1, ELD TESTfNG: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARDTHA ENHANCED 49057. <br /> f, �D$TECTION fEL MUST BE PERFORMED, PERIODIC ELD iS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 CCR§2 <br /> 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 M__ONTHS. 490-66 <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490 67 t <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> 'EAlarm logs 49o-ra. ❑Visual inspection Records 490-68b q Tank integrity testing results 490-fisc <br /> SiR testing results(and supporting documentation records). 4%-68d ❑ Tank gauging results(and supporting documentation records). 49 8o <br /> ❑ATG Testing results(and supporting documentation records),490-68f ❑ Corrosion Protection 60-day logs 490-6S8 <br /> Equipment maintenance and calibration records. 490-68h <br /> IX TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490694 <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> THiS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)497-69b <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-690 <br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49o-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS M NUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"4W69f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"49"98 <br /> ❑ OTHER(Specify):M69h,1,169, <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the internatiott 1 Code Council(IJkh,)s <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annual Iv,and with 30 days of hire, <br /> training will include,but is not limited to,the following: <br /> > Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> P The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> Names of contact persm(s)for emergencies and monitoring alarms.490.70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring proced4res arc attached to this plan.490-71 <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenancelof UST leak detection equipme;covered b_ythis plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintain ed properly.The following p on(s)are risible for performing the monitoring Bund equipment maintenance <br /> NAME /a G 490-7a TITLE W E -vsNAME 490-74 TITLE -75The Designated Operator shall perform a monthly Yisual inspection of the facility, provide a report to the owner/operator,and inform the wner/oparty <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> r CERTIFICATION:I ce^that the infotmatio rovided herein is true and accurate to the best of my knoNviedge- <br /> APPLICANT SIGNATU 490-76 DATE: 490-77 <br /> Q act <br /> .F ility r/ rai r <br /> APPLICANT NAME(print): 490-78 APPLICANT TITLE: 4W79 <br /> UPCF UST-D(12/2007)3/4 <br />