My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
6970
>
2300 - Underground Storage Tank Program
>
PR0231833
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2024 2:53:51 PM
Creation date
4/27/2020 12:23:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0231833
PE
2361
FACILITY_ID
FA0003874
FACILITY_NAME
Meineke Car Care Center # 4130
STREET_NUMBER
6970
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
02
SITE_LOCATION
6970 WEST LN STE 130
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231833_6970 WEST_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
477
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aug 06 04 08s48a T RCCUTITE 650 952-7631 p. 4 <br /> m <br /> .APT secondary test boots are designed C TM <br /> for testing the integrity of Poly-TexhTm roly— <br /> Te h <br /> secondarily-contained flexible piping, <br /> such as P-175-SC. Each boot has an Secondary <br /> t <br /> air chuck for applying air pressure to <br /> the secondary containment jacket. <br /> Placing a boot on each,end of the Boots <br /> secondary containment jacket forms <br /> an airtight chamber for testing.Amer <br /> the testing is completed,slide the <br /> boots back on the pipe to open the <br /> secondary system.The boots remain <br /> available for periodic testing as <br /> required by local regulations. •;'1 `� <br /> h <br /> Secazr <br /> o <br /> _ t <br /> dar}'Test Boo <br /> for P-050-SC <br /> through P-250-SC <br /> 0-SC <br /> S <br /> econdary <br /> dary test boots slip over the endote prior to installation of end <br /> fittings. <br /> Boots are manufactured using fuel- <br /> resistant nitrile rubber,and employ <br /> brass air chucks and stainless steel <br /> clamps for maximum corrosion <br /> resistance. Test Boo <br /> for P-300-SC <br /> Boots are easily clamped down with a P-400-SC <br /> screwdriver or 5/16"nutdriver,fo <br /> an airtight chamber between the ._ <br /> primary pipe i and the secondary jacket. <br /> The secondary chamber is pressurized Model No. Desai tion <br /> to 10 psi through the air chuck to test STB-050 Secondary Test Boat for P-050-SC Pipe <br /> system integrity. STB-075 Secondary Test Boot for P-075-SC Pipe <br /> After pressure testing,the boots remain STB-100 Secondary Test Boot for P-100-SC Pipe <br /> for future use but are ed STB-150 Secondary Test Boot for P-150-SC Pipe <br /> on the i o _ Teat Boot for P 175-SC Pipe <br /> pipe Secondary p <br /> TB 175 s <br /> back to permit back-flow of fuel leaks S ' <br /> STB-200 Secondary Test Boot for P-200-SC Pipe <br /> to the tank sump. STB-250 Secondary Test Boot for P-250-SC Pipe <br /> ATB-300 Air Test Boot for P-3o0-SC Pipe <br /> BTB,300 Blank Test Boot for P-300-SC Pipe <br /> ATB400 Air Test Boot for P-400-SC Pipe <br /> BTB4o0 Blank Test Boot for P-400-SC Pipe <br /> 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.