My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
6970
>
2300 - Underground Storage Tank Program
>
PR0231833
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2024 2:53:51 PM
Creation date
4/27/2020 12:23:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0231833
PE
2361
FACILITY_ID
FA0003874
FACILITY_NAME
Meineke Car Care Center # 4130
STREET_NUMBER
6970
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
02
SITE_LOCATION
6970 WEST LN STE 130
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231833_6970 WEST_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
477
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-WRXTT N NIONITORING AND RESPONS , J�APt <br />STORAGE TANK MONITORI4ROGRAi>'I <br />UNDERGRO P tcm_The information on this =.rcor1itorcng program are <br />'I'h°s monitoring program must be kept at the UST location at all s. <br />Cor,,ditions of the operating permit. The peijdt hoidProcemust dures, notify s requ'ued to obtain approval or apcwAt <br />t b fc rz c �: titc R <br />wi nin 30 days of any changes to the monitorinocg p <br />tl e change. Required by CCR 2632 (d) and 2641 (h). <br />A(,1;,I'-I Y NAME <br />I� <br />. -- <br />FACILITY ADDl2LS <br />1 Natrre(s) and'I'itie{s) of the people responsible for performing the moniti)ri.n and/or m<�intenanco <br />)1I r <br />2.1) scribe the frequency of performing the monitoring for'. <br />TANKS _ AZA/_& 41- - <br />'..Describe tl:e location(s) of where the monitoring will be perforrrced, re: ocnliat; of se".sr�rs <br />i or ereunderground storagetank. <br />t.liescrtLe rle.follnvitg c iptrentf!- r A) (4,-w <br />elof Monitoring Panel <br />Narre andMod <br />1~l�!ute and Model of Line heakl:)etectors- <br />Nan;c and Model of Annular Sensors ------ <br />an6 Model of Piping Sensors <br />and Model of Dispenser ScrisOrs <br />of ov erfcll prevention <br />r:.!' 1' '`fit �t c•i` - <br />d Dis eraser I'at-1 Sensors shut down thc, turbine`? Yes1''i-,� N> � <br />.1)o the'T•urbine Sensors and p Yc _ X <br />1)c�es the turbine shut dos�tm if a sensor is disconnected'? !_, Nu -N f <br />Docs the turbine shut down is the monitoring panel loses power! Y'e. `�` <br />6.1Iow will the alarm llistory and subsequ nt maima*tCe be recorded? <br />recording for the rz�o;�itoring efclt�c.ip=,7ient. `dxthat , :l� ,<;;l <br />equipment must be performed at least once every t?.non rts. <br />.Maintenance of the monitoringV <br />Describe the preventive Inatntenance schedule an r S <br />al.tnual monitoring certification be performed rn.- <br />_._---.. _-------____--•-----------"` .nrte;,i nti�sf be tested 6 m� onths after irs;a!lati()n. �4I1 sec•�irrr:arycor,tc r:. <br />Note: For new i11stallalions the secondary contat. e med before ,lanuary 1, 2003. <br />rntst be rested once every 3G months witft initial testing rfar <br />teln, including pt ping, and tlie; <br />for tY,e operation of US's sys-' g <br />g. Describe the; training necessary _. <br />equipcnent.—_._�,1�ti!-�- <br />-��o-- <br />i:•u dt IIr,Us vi nonitoringpfan-doc <br />sr3oiza�2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.