My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
6970
>
2300 - Underground Storage Tank Program
>
PR0231833
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2024 2:53:51 PM
Creation date
4/27/2020 12:23:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0231833
PE
2361
FACILITY_ID
FA0003874
FACILITY_NAME
Meineke Car Care Center # 4130
STREET_NUMBER
6970
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
02
SITE_LOCATION
6970 WEST LN STE 130
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231833_6970 WEST_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
477
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
441 <br />(7) Before being oovered, enclosed, or placed in use, all <br />underground storage tanks and piping shall be tested <br />for tightness hydrostatically or with air pressure at <br />not less than 3 pounds per square-inoh (20.68 k Po) and <br />not more than 5 pounds per square-imob (34.48 k Pa). <br />Pressure piping @ball be hydrostatically tested to 150 <br />percent of the ms:imus anticipated pressure of the <br />system, or pneumatically tested to 110 percent of the <br />maximum antioloeted pressure of the system, but not <br />less then 5 pounds per square inch (34.48 kPa) gauge at <br />the highest point of the system. This test shall be <br />maintained for a sufficient time to complete visual <br />inspection of all Joints and connections, but for at <br />least 10 minutes, In lieu of the above, a test using <br />accepted engineering practices shall be used. Some <br />acceptable test methods for testing pipelines are <br />Provided in Appendix I of this subchapter. Double - <br />walled underground storage tanks are exempt from the <br />requirements of this section provided that the annular <br />space is monitored using either pressure or vacuum <br />testi <br />(d) Allmon or 9 programs ahall include the following: <br />(1) A written routine monitoring procedure which includes, <br />when appliosbles the frequency of performing the <br />monitoring method. the methods and equipment to be used <br />for performing the monitoring, the location(s) from <br />which the monitoring will be performed, the name(s) or <br />title(s) of the person(@) responsible for performing <br />the monitoring mod/or maintaining the equipment. and <br />the reporting format. <br />(2) A •:pons• plan developed by the permit applicant which <br />dem natratea, to the satisfaction of the loco genoy, <br />that y unauthorized release will be remov from the <br />asoon:a container within the short eot ssible time <br />and no to or than the tin* can$isten with the ability <br />` ®' of the aero ary container to cont n the hazardous <br />(l G� c substance. T response plan s 1 include, but is not <br />l limited to, the :allowing - <br />(A) A description o t proposed methods and <br />equipment to be for removing the hasardous <br />substance. in uding @A ovation and availability <br />of the req red equips* , if not permanently on- <br />site, an an equipment ■e enance schedule for <br />the eq psent located on-olt <br />(8) Yh name(s) or titles) of the per n(s) <br />eaponsibis for authorizing the work o be <br />performed. <br />Authority: HL3C 25799.3 <br />Reference: HASC 25281, 25291 <br />3.9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.