Laserfiche WebLink
RESPONSE PLAN 7/21/93 <br />SHOP NO 130 - 6970 WEST LANE STOCKTON CALIFORNIA <br />In the event that the Leak Detector Alarm is triggered, the Shop <br />Manager, Mr. Rey Nabayan, shall open the door and check to see how <br />many sensors are alarming. An alarm may be caused by many reasons <br />other than a tank, -or piping, leak. In the event of a suspected <br />leak, Rey will pull the appropriate inspection cover, raise the <br />probe, and check that the probe is functioning properly by dipping <br />it in waste oil. If the probe is working properly, Rey will pump <br />out any liquid present in the containment area and inspect the <br />liquid. If the liquid is waste oil, all waste oil will be removed <br />from the tank & piping within 24 hours. No further waste oil will <br />be placed in the underground tank and/or piping until the tank <br />and/or piping can be replaced to current standards. In the <br />interim, waste oil will be stored in appropriately labled 55 <br />gallon drums. All waste oil will be recycled by Evergreen <br />Environmental Services, our regular authorized hazardous materials <br />hauler. <br />If the liquid is not waste oil, Rey shall arange to have the <br />liquid tested. Any liquid determined to contain hazardous <br />materials shall be stored in appropriately labled drums, and <br />properly disposed of once the liquid is identified. The source of <br />the liquid shall be identified, and the leak sealed, prior to <br />reinstallation of the probe. <br />If the High Level Alarm is triggered, Rey shall arrange to have <br />the tank pumped out by Evergreen Environmental Services within 24 <br />hours. The two (2) rolling drain pans will be used for temporary <br />interim storage. <br />In the event that a waste oil leak is discovered, and confirmed, <br />appropriate notification shall be made per the Hazardous Materials <br />Management Plan. Rey Nabayan, the Shop Manager, is the Primary <br />Contact Person in the event of a leak, and will notify Fred <br />Waechter, Vice President of Planning & Construction, at (714)851- <br />2259, in the event of a confirmed waste oil leak. Mr. Waechter is <br />responsible for authorizing any work necessary , other than <br />pumping, under the Response Plan. <br />