Laserfiche WebLink
A , <br />8,1 /02/1995 03:27 209754 22 <br />CALAVERA5 ENV ICALTH PAGE 03 <br />116i.,lterr;ng system Certiflcatlov <br />Facdity Name: ✓ r►c of i catlIIg,J�t� t. <br />F. In -Tank Gauging Equipment: D Check this box if tank gauging is used only for invcatory control - <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitories& <br />Software version Installed_ <br />Yu <br />Q No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />a <br />11 No, <br />Were an oink gauging probes visually inspected for damage and residue buildup? <br />Yes <br />Q No• <br />Was accuracy of systcm product/waste level readings tested? <br />Q No' <br />Was accuracy of system water level readings tested? <br />FYeses <br />Xes <br />Q No* <br />Were all alatrnt activated and did they function properly? <br />® No• <br />Wem all items on the equipment manufacturer's maintenance checklist completed? <br />" In the Section $ below, describe hour and when these dciaeienefes were or will be corrected - <br />13 Check this box if LLDs are not installed. <br />Com IetC the fe <br />Yes a Noa W" a leak simulated to verify LLD perfom"ce?(Check all thar apply) <br />Sinn aced leak rate: 3 g-p_b.; 0 0. l &-p-h-; 130.2 g -p -h- <br />es 0 No, Were all LLDs cmilroed opCrAnOM at and accurate within regulatory requirements? <br />Ycs ® No` Was the testing apparatus properly cahbnted? <br />3 Yes No" For mechanical LLDs, does clic LLD restrict product flow if it detects a leak? <br />® N/A <br />❑ Yes j_D No• j For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />O Yes <br />®Me <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />N/A <br />or disconnected? <br />❑ Yes <br />®No• <br />For electronic LLDs, does the turbine automaticaUy shut off if any portion of the monitoring system <br />N/A <br />rnat ions or fails a test? <br />® Yes <br />❑ No' <br />For eleeo-onic LLDs, have all accessible wiring connections been visually uispected? <br />NIA <br />Yes <br />No• <br />If necessary to proper equipment operation. arc fuel filters in good condition. <br />® WA <br />it -es D '=jWere all items on the equipment manufacturer's maintenance chcckhst completed? <br />* In the Section H. below. describe stow and when. these deficiencies were or will be corrected. <br />CALK -Of <br />Page 3 <br />