My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
515
>
2300 - Underground Storage Tank Program
>
PR0231400
>
COMPLIANCE INFO_1985-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
4/27/2020 12:23:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2005
RECORD_ID
PR0231400
PE
2361
FACILITY_ID
FA0003539
FACILITY_NAME
S B GAS & MARKET
STREET_NUMBER
515
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23309031
CURRENT_STATUS
01
SITE_LOCATION
515 W ELEVENTH ST STE 301
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231400_515 W ELEVENTH_1985-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
553
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
solid glass hard inner protective wall to the leaking vessel. <br />The corrosion -proof inner tank seals off the leaks and <br />becomes completely bonded to the entire tank. <br />The Glass Armor procedure for the repair of underground <br />gasoline storage tanks include the following: <br />1. Isolating the tank. <br />2. Gas freeing the tank. <br />3. Entering the tank. <br />4. Cleaning and sandblasting the tank. <br />5. Application of GA27P. <br />6. Sealing the tank. <br />To be certain that all Applicators take all the <br />necessary action required to succeed in this program, the <br />following specifications have been written. <br />SPECIFICATIONS FOR THE REPAIR OF PETROLEUM SERVICE <br />STATION TANKS BY COATING WITH GLASS ARMOR EPDXY RESINS <br />GENERAL <br />A. In addition to obtaining permits, etc., the Contractor <br />will obtain the approval of the Local Fire Marshal and/or <br />other regulating authorities, where required. <br />B. The scope of the contract covers a turnkey job including, <br />but not limited to, excavation, opening tank, safe <br />removal and disposal of bottom sediment and water, tank <br />surface preparation, coating application, testing, <br />closing tank and finishing of grade to its original <br />surface. <br />C. Bridgeport Chemical's instructions are to be followed in <br />the handling, mixing and application of the resin <br />compounds. <br />D. There will be a Contractor's employee on hand at all <br />times, who understands lead hazard and the fire and <br />explosion potential as he will be responsible for <br />maintaining a safe environment in the work area. <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.