Laserfiche WebLink
• <br />D. POWER WIRING CONNECTIONS. <br />-011 WARNING: IN INSTALLATION OF THIS <br />PRODUCT, COMPLY WITH THE NATIONAL <br />ELECTRICAL CODE; FEDERAL, STATE, AND <br />LOCAL CODES; AND ANY OTHER APPLI- <br />CABLE SAFETY CODES. IN ADDITION, TAKE <br />NECESSARY PRECAUTIONS DURING IN- <br />STALLATION, SERVICE AND REPAIR TO <br />PREVENT PERSONAL INJURY, PROPERTY <br />LOSS AND EQUIPMENT DAMAGE. <br />-011 WARNING: BE SURE POWER TO THE TLS -350 <br />CIRCUIT IS TURNED OFF BEFORE CON- <br />NECTING POWER WIRING. FAILURE TO DO <br />SO COULD RESULT IN DEATH, SERIOUS <br />PERSONAL INJURY, PROPERTY LOSS AND <br />EQUIPMENT DAMAGE. <br />Power Supply Rating: <br />Input Power: (LI, N, G); 120 VAC, 50/60 Hz, 100W Max. <br />Output Power: Alarm Relay Contacts, resistive load - <br />120 VAC, 2A Max.; or, 24 VDC, 2A Max. <br />1. Connect a # 12 AWG (or larger) barrier ground conduc- <br />tor from the ground lug closest to the conduit entry in <br />the monitor to the earth ground bus on the power panel <br />being used to supply AC line voltage to the TLS -350 <br />monitor (see Figure 11, "Power Wiring Diagram"). <br />NOTE: If connecting to a subpanel, be sure there is <br />an earth ground connection between the subpanel <br />and the main power panel in accordance with the <br />National Electrical Code. <br />2. Connect the power wires (LI and N) to the proper <br />terminals in the AC connector (see Figure 11). <br />3. Connect the chassis ground wire from the ground lug <br />closest to the conduit entry in the monitor to the earth <br />ground bus on the power panel being used to supply <br />AC line voltage to the TLS -350 monitor (see Figure 11, <br />"Power Wiring Diagram"). <br />GROUND LUG <br />1A FUSE 3AG SLO-BLO <br />o ® <br />M <br />o <br />MODULE <br />0 0 <br />CONNECTOR <br />GROUNDLUG <br />CLOSEST TO <br />CONDUIT ENTRY <br />MONITOR <br />RIGID a <br />CONDUIT—/ <br />_ a <br />m v <br />N L, <br />Figure 11. Power Wiring Diagram. <br />Site Preparation almunstallation Instructions <br />TLS-SWST Monitoring System F4 <br />4. Connect the power supply wires in the power panel to <br />a separate dedicated circuit. <br />5. Check to be sure that the electrical resistance between <br />the monitor ground terminal and a known good earth <br />ground is less than 152. <br />E. PROBE AND SENSOR WIRING CONNECTIONS. <br />10 WARNING: IN INSTALLATION OF THIS <br />PRODUCT, COMPLY WITH THE NATIONAL <br />ELECRICAL CODE; FEDERAL, STATE, AND <br />LOCAL CODES; AND ANY OTHER APPLI- <br />CABLE SAFETY CODES. IN ADDITION, TAKE <br />NECESSARY PRECAUTIONS DURING IN- <br />STALLATION, SERVICE AND REPAIR TO <br />PREVENT PERSONAL INJURY, PROPERTY <br />LOSS AND EQUIPMENT DAMAGE. <br />WARNING: BE SURE AC POWER TO THE SYS- <br />TEM IS OFF BEFORE OPENING THE <br />FRONT -PANEL COVER AND CONNECTING <br />PROBE AND SENSOR WIRES. IF HIGH VOLT- <br />AGE IS SHORTED ACROSS ANY BARRIER <br />TERMINAL, EXPLOSION AND FIRE COULD <br />RESULT. <br />Connectors are supplied with each sensor and probe <br />module. They provide screw terminations for each sensor <br />and probe. <br />CAUTION: ONCE PROBES AND SENSORS <br />HAVE BEEN CONNECTED AND THE SYSTEM <br />HAS BEEN STARTED AND PROGRAMMED, <br />MODULE POSITIONS, CONNECTOR POSITIONS <br />AND WIRE POSITIONS CANNOT BE CHANGED <br />WITHOUT REPROGRAMMING THE SYSTEM! <br />IMPROPER SYSTEM OPERATION WILL RESULT <br />IF ANY ONE OF THESE POSITIONS IS <br />CHANGED WITHOUT REPROGRAMMING. <br />Be sure to accurately record on the circuit directory the <br />type of module, and the location of each device wired to <br />the connector. <br />Identify each connector with a self-adhesive number la- <br />bel according to the slot number. <br />1. Two -Wire Probes and Sensors. <br />Connect the two color -coded or marked wires from <br />each probe or sensor to the appropriate terminals in <br />the probe or sensor module connectors (see Figure 12, <br />"Four Probe/Thermistor Interface Module Wiring Dia- <br />gram" and Figure 13, "Interstitial Liquid Sensor Inter- <br />face Module Diagram.") <br />Be sure to maintain proper polarity between the <br />probe wires and their respective module connector <br />terminations. Since interstitial liquid sensors are con- <br />tact switches, polarity is not a consideration when con- <br />necting field wires to interface modules. <br />2. Three -Wire Vapor Sensors. <br />Connect the three color -coded or marked wires from <br />each vapor sensor to the appropriate terminals in the <br />vapor sensor module connectors (see Figure 14, "Vapor <br />Sensor Interface Module Wiring Diagram"). Be sure <br />to maintain proper polarity between the vapor <br />sensor wires and their respective module con- <br />nector terminations. <br />17 <br />