My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
515
>
2300 - Underground Storage Tank Program
>
PR0231400
>
COMPLIANCE INFO_1985-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
4/27/2020 12:23:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2005
RECORD_ID
PR0231400
PE
2361
FACILITY_ID
FA0003539
FACILITY_NAME
S B GAS & MARKET
STREET_NUMBER
515
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23309031
CURRENT_STATUS
01
SITE_LOCATION
515 W ELEVENTH ST STE 301
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231400_515 W ELEVENTH_1985-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
553
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />the probe and monitor wiring during installation. The <br />conduit must be properly sealed in accordance with the <br />• National Electrical Code (NFPA 70) and the Automo- <br />tive and Marine Service Station Code (NFPA 30A) <br />since they pass from a Class I, Division I or Division II <br />area into a non -hazardous area. <br />WEATHERPROOF <br />JUNCTION BOX <br />(1 PER PROBE) <br />1/2" RIGID <br />CONDUIT i Blk <br />• <br />TO FROM <br />MONITOR PROBE <br />+ Wht <br />Figure 38. Two -Wire Probe Field Wiring Installation <br />Diagram. <br />9. Seal wire nuts with epoxy sealant furnished with each <br />probe, using one bag for two wire nut connections. <br />(Refer to Figure 26, "Epoxy Sealant for Two -Wire <br />Connections.") <br />• CAUTION: IF MORE THAN TWO WIRE NUT <br />CONNECTIONS SHARE AN EPDXY SEALANT <br />BAG, THE CONNECTIONS WILL RESULT IN <br />INACCURATE PROBE READINGS AND POSSI- <br />BLY FALSE ALARM CONDITIONS. <br />WWARNING: EPDXY SEALANT MAY BE IR - <br />RITATING TO EYES AND SKIN. MAY <br />CAUSE SKIN SENSITIZATION IN SUS- <br />CEPTIBLE INDIVIDUALS. MAY BE AB- <br />SORBED THROUGH THE SKIN. EPDXY <br />SEALANT CONTAINS EPDXY RESIN AND <br />VINYL CYCLOHEXENEDIOXIDE. VINYL <br />CYCLOHEXENE DIOXIDE HAS CAUSED <br />SKIN CANCER IN ANIMAL TESTS. <br />PRECAUTIONS: AVOID EYE AND SKIN CON- <br />TACT. WEAR IMPERVIOUS GLOVES AND <br />SAFETY GLASSES. USE ONLY IN WELL VEN- <br />TILATED AREAS. <br />10. Tighten the cable bushing nuts on the probe riser cap <br />and junction box to ensure a water -tight seal at the <br />probe cable entry. <br />11. Secure the riser locking cap to the top of the riser pipe. <br />A padlock may be installed for added security. <br />F. PROBE INSTALLATION IN ABOVEGROUND <br />STORAGE TANKS <br />Install each probe in an aboveground storage tank as <br />follows (see Figure 39; "Magnetostrictive Probe Installa- <br />tion Requirements for Aboveground Storage Tanks"): <br />Site Preparation a Installation Instructions T <br />TLS-JPUST Monitoring System <br />WARNING: TO AVOID ELECTRICAL SHOCK <br />WHICH COULD KILL YOU, BE SURE AC <br />POWER TO THE MONITOR IS OFF DURING <br />INSTALLATION. <br />1. Turn OFF power to the TLS system. <br />2. Make sure any liquid other than the product to be <br />dispensed has been pumped out of the tank. <br />3. Be sure there is no sludge in the bottom of the tank. <br />Sludge can interfere with proper operation of the water <br />float. <br />CAUTION: HANDLE PROBES CAREFULLY! <br />STRIKING OR DROPPING PROBE WILL RESULT <br />IN LOSS OF CALIBRATION AND COULD CAUSE <br />PERMANENT DAMAGE. <br />4. Attach the probe cable connector to the mating plug on <br />the top of the probe. Be sure the connector is attached <br />securely by hand tightening the locking ring. <br />5. Place floats at bottom of probe before standing the <br />probe on end. <br />ifCAUTION: HANDLE PROBES CAREFULLY! <br />STRIKING OR DROPPING PROBE WILL RESULT <br />IN LOSS OF CALIBRATION AND COULD CAUSE <br />PERMANENT DAMAGE. <br />6. Carefully lower probe into the riser pipe until the boot <br />rests on the bottom of the tank. <br />STRAIGHT LIOUIDTIGHT <br />CONNECTORS are' <br />(SUPPLIED WITH AST KIT) <br />WEATHERPROOF <br />JUNCTION BOX WITH <br />INCH NPT THDS <br />Ih <br />16 CUBIC INCH <br />MINIMUM) <br />EPDXY SEAL <br />PER NFPA <br />SPEC <br />RISER DIMENSION <br />SHOULD BE 18" MIN. <br />TO THE BOTTOM OF <br />FLEXIBLE METAL CONDUIT <br />THE RISER CAP <br />SUPPLIED WITH AST KIT <br />SEE NOTE BELOW <br />4.00" A.P I. PIPE <br />SCHEDULE 40 <br />TANK <br />MAGNETOSTRICTIVE <br />PROBE <br />Note: Increase this minimum dimension if the tank <br />diameter does not match the probe length. <br />(Example: A 7'6" dia. tank will use an 8' <br />probe. The extra probe height will be lodged <br />in the riser pipe, which must be 6" longer <br />than the minimum in order to provide room.) <br />Figure 39. Magnetostrictive Probe Installation Require- <br />ments for Aboveground Storage Tanks. <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.