My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3555
>
2300 - Underground Storage Tank Program
>
PR0231130
>
COMPLIANCE INFO_2009-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 10:37:32 AM
Creation date
4/27/2020 12:23:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2018
RECORD_ID
PR0231130
PE
2361
FACILITY_ID
FA0002232
FACILITY_NAME
QUIK STOP MARKET #3132*
STREET_NUMBER
3555
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
071-180-20
CURRENT_STATUS
01
SITE_LOCATION
3555 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231130_3555 W HAMMER_2009-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> SIMPLIFIED RESPONSE PLAN FOR THE REMOVAL OF UNAUTHORIZED <br /> RELEASES FROM INTERSTITIAL SPACE OF DOUBLE-CONTAINMENT UST <br /> SYSTEMS <br /> 1. Upon recognition of a suspected unauthorized release from the primary containment or a <br /> breach in the secondary containment,store personnel will notify the Quik Stop Director <br /> of Environmental Affairs,Mike Karvelot, at(510)657-8500. <br /> 2. The Director of Environmental Affairs will arrange for a qualified contractor to verify the <br /> suspected breach of primary or secondary containment and/or verify proper operation of <br /> the monitoring system. <br /> 3. Upon confirming the loss of tank system integrity,Regulatory Agencies will be notified, <br /> the tank system taken out of service,and product removed from the primary container. <br /> 4. The Director of Environmental Affairs will authorize all work necessary under this plan. <br /> In the case of a leaking tank,representatives of the tank manufacturer will conduct an <br /> inspection to determine if repairable. The most appropriate method to repair any failed <br /> product lines will be determined by field conditions. <br /> 5. All repairs to the failed tank system will be completed pursuant to the requirements of 23 <br /> CCR, Section 2661. Tank repairs,specifically,will be conducted under the direct <br /> supervision and approval of the tank manufacturer. A qualified contractor will conduct <br /> line repairs. <br /> 6. Upon completion of repairs,the tank and product line will be precision tested in <br /> accordance with the above regulation. The tank manufacturer will certify the tank for <br /> its intended use prior to bringing the tank back into service. <br /> 7. Unauthorized releases to the interstitial space between primary and secondary contain- <br /> ment will be removed in accordance with procedures specified by the tank manufacturer. <br /> The equipment required to accomplish this task will be designated and provided <br /> pursuant to the tank manufacturer's recommendation. <br /> 8. All hazardous materials and contaminated waste generated by the repair activities will <br /> be properly handled,transported, and disposed in accordance with all appropriate <br /> State and Local Regulations. <br /> 9. The interstitial monitoring system will be activated and certified prior to bringing the <br /> UST system back into service. <br /> Questions regarding this response plan should be directed to Mike Karvelot,Director of Environ- <br /> mental Affairs,at(510)657-8500. <br />
The URL can be used to link to this page
Your browser does not support the video tag.