Laserfiche WebLink
MONITCVING SYSTEM CERTIRf ATION <br />CERTIFICATION /TEST DATE: April 23, 2012 <br />A1. FACILITY <br />A2. OWNER <br />Name <br />Quik Stop Market #132 <br />❑ <br />Name <br />Quik Stop Markets, Inc. <br />Address <br />3555 W. Hammer Lane, Stockton, CA 95219 <br />[I <br />Address <br />4567 Enterprise Street, Fremont, CA 94538 <br />Phone # <br />510-657-8500 <br />❑ <br />Phone # <br />510-657-8500 <br />Contact <br />Michael Karvelot <br />El <br />Contact <br />Michael Karvelot <br />F. IN -TANK GAUGING / SIR EQUIPMENT: ■ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gaugung equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />Fj07No <br />* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ <br />Yes <br />El <br />No * <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />[I <br />Yes _ <br />❑ <br />No * <br />Was accuracy of system product level readings tested? <br />❑ <br />Yes <br />El <br />No * <br />_ __ <br />Was accuracy of system water level readings tested? <br />El <br />Yes <br />C3 <br />No * <br />_ <br />Were all probes reinstalled properly? <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />1:1 Yes El No * <br />ElNo* <br />[I <br />N/A <br />For electronic LLDs, does the turbine automaticallyshut off if the LLD detects a leak? <br />❑ Yes ❑ No* <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />G. LINE LEAK DETECTORS (LLD): <br />Complete the following checklist: <br />❑ Check this box if LLDs are not installed. <br />Fj07No <br />* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ <br />Yes <br />El <br />No * <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />[I <br />Yes _ <br />❑ <br />No * <br />Was accuracy of system product level readings tested? <br />❑ <br />Yes <br />El <br />No * <br />_ __ <br />Was accuracy of system water level readings tested? <br />El <br />Yes <br />C3 <br />No * <br />_ <br />Were all probes reinstalled properly? <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />1:1 Yes El No * <br />G. LINE LEAK DETECTORS (LLD): <br />Complete the following checklist: <br />❑ Check this box if LLDs are not installed. <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />I H. COMMENTS <br />Page 3 of 3 <br />■ <br />Yes <br />ElNo* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />El <br />N/A <br />(check all that apply) Simulated leak rate: ■ 3 g.p.h.; El0.1 g. p. h.; [10.2 g. p. h. <br />■ <br />Yes <br />ElNo* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />■ <br />Yes <br />❑ <br />No* <br />Was the testing apparatus properly calibrated? <br />For mechanical LLDs, does the LLD restrict product flow If it detects a leak? <br />■ Yes <br />ElNo* <br />[I <br />N/A <br />For electronic LLDs, does the turbine automaticallyshut off if the LLD detects a leak? <br />❑ Yes ❑ No* <br />■ <br />N/A <br />El <br />Yes <br />E]No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />■ <br />N/A <br />or disconnected? <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />❑ Yes <br />ElNo* <br />■ <br />N/A <br />or fails a test? <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />El Yes <br />❑ No* <br />■ <br />N/A <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />■ Yes <br />❑ No* <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />I H. COMMENTS <br />Page 3 of 3 <br />