Laserfiche WebLink
SECONDARY LINE TESTING <br /> Test Method By: O Manufacturer • Industry Standard o Professional Engr o Other(see below) <br /> Test Method Uses: • Pressure o vacuum o Hydrostatic o Other(see below) <br /> Measuring Equipment Used: Pressure Gauge (range Oto 15 psig) <br /> Description Line#1 Line#2 Line#3 <br /> Tank product Gasoline-87 Gasoline-89 Gasoline-91 <br /> Pipe manufacturer Ameron Ameron Ameron <br /> Pipe material FRP FRP FRP <br /> Primary pipe diameter (inches) 2 2 2 <br /> Secondary pipe diameter (inches) 3 3 3 <br /> Method of secondary pipe isolation Clamshell/Boot Clamshell/Boot Clamshell/Boot <br /> Location of secondary pipe isolation Sump/UDC Sump/UDC Sump/UDC <br /> Estimated length of piping run (feet) 105 95 105 <br /> (include length of branch runs) <br /> Wait time for pressure to stabilize (hr:min) :10 :10 :10 <br /> Test start time 9:51 AM 9:53 AM 9:54 AM <br /> Initial pressure (psig) 5.0 5.0 5.0 <br /> Test end time 10:51 AM 10:53 AM 10:54 AM <br /> Final pressure(psig) 5.0 5.0 5.0 <br /> Test duration (hr:min) 1:00 1:00 1:00 <br /> Change in pressure (psig) 0.0 0.0 0.0 <br /> Pass/Fail threshold (psig) 0.5 0.5 0.5 <br /> TEST RESULT PASS PASS PASS <br /> Comments: <br /> ©2017 Walton Engineering,Inc. <br />