Laserfiche WebLink
Ground Zero Analysis, Inc. <br />SITE SAFETY PLAN <br />Physical Hazards <br />Task(s) <br />Hazard <br />Mitigation Measure <br />1,3 <br />Heavy Equipment (Noise & Physical <br />All heavy equipment used on this project will be in <br />contact) <br />good working order and operated in accordance <br />with recognized industry standards and Cal -OSHA <br />Title 8, Subchapter 4, Construction Safety Orders. <br />Hollow stem drilling equipment will be used and <br />non-essential personnel will be kept 20 feet from <br />equipment. <br />All equipment operators and ground crews <br />working in close proximity of heavy equipment will <br />be required to use hard hats, eye and ear <br />protection, gloves, and proper footwear. <br />1,3 <br />Dust <br />Dust will not be generated by direct push drilling <br />activities. Soil will be wetted as necessary to <br />control dust during excavation activities. If <br />weather conditions create dust, personnel will <br />avoid being downwind of direct push activities. <br />Fire and Explosion Hazards <br />List Flammable or Combustible materials on-site. Keep sources of ignition away from these materials. <br />Combustible (Flash Point >100<200 °F) <br />Diesel <br />Type and Location of Fire Extinguishers (Show on map for large projects) <br />Dry chemical fire extinguishers, Class A, B, and C, are stored in all GZA vehicles. <br />Other Hazards (Check if applicable) <br />M Noise Activities likely to generate noise exceeding 85 dB: <br />Wear hearing protection during these activities. <br />PAGE 5 <br />