Laserfiche WebLink
FROM <br />� UNIFIED PROC-RANI CONSOLIDATED FORM <br /> FAX NO. n. 14 2011 04:18PM P15 <br /> UNOERGROUND STORAGE TANK^ <br /> TYPE OF ACTION CHANGE Of WFORMATION <br /> rJ-k. w. d7) 2-THIS PLAN COVERS ONLY THE FOIJOWING UST <br /> [3] En 11 0 0 0 11 <br /> BUSINESS NAME(Ume ag Abao Name or 3. <br /> D" SO Gas and Ma0ket <br /> BUSINESS SITE (-ITY <br /> ADDRESS 515 W 11th St Tracy <br /> sm <br /> The eauwnma manuhctums,g=MM or oe�ft whichever is mom ft!Ent-Such work mu!d he patfommel by c"rwd pmsojmcJ,123 CCk Be?,3W A)l <br /> JMW <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY 0 99,OTHER(Specily), <br /> 1.New gme PLOT PLANmAp SUBMITTED wrrm THIS KAN 0 1 SrIli PLOT PLAN&W PREVIO(BLY SUBMITTM 123 CCR 62A3Z 26341 <br /> LJ 1,CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(JNT�RSTITIAL)SPACR(S)OR SWONDARY CONTAINMR41'VAULT(S) 490-1 <br /> WITH AUD03LE AND VISUAL ALARMS.V3 cm poz 26341 41". <br /> .5i$CONDARY COM-ANMENT IS: DRY b,LIQUID FILLED PRESSURIZED 13 d.UNDER VACUU <br /> Ll 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR Awoz WALL luccRuffm 490-11. <br /> PANEL MANUFACTURER, 490-1 Z MODEL#., <br /> IN-TANK PROBE MANUFACTURER: 4"It MODEL#(S): <br /> LEAK TEST FREQUENCY: El a.CONTINUOUS Ll b.'DAILY/NIGI ITLY 0 c.WEEKLY 490616. <br /> 1:1 d.MONT14LY e-01TIER(Specify): 40-17. <br /> U 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION m cm 6264&n 490-M <br /> El 4.WmWLY L2615 TESTING PERIOD, 0a.36 HOURS b.60 HOURS <br /> LJ 5.TANK INTEGRITY TESTING PER p3 cat pbo.il 49044. <br /> TEST FRRQ_MNCY-. ANNUALLY 11 b.BIENNIALLY El c,OTHER fttc�: 4W25. <br /> OTHM <br /> LJ i.comiNuousmoNrroRiNr5OFPHVMMJGSUMM.)ANOUMFUt-,FJOC)NI)ARYC'OilrrAI'NMENrWrrHAUDIBL)z&VlStJALALAPMS. <br /> PANm.mANuFAcTuREP-Incon 4w- "4 MODEL#- TS-1 000 EFI 49&31. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,*nJRBINE)SHUTDOWN. 13 a.YES 0 b.NO 490-24 <br /> FAILURE/DJSCONNECIION OF THE MONITORING SYSTEMIU10"ItS AUTOMATIC KJMP SHUTDOWN. 11 &YES Cl b.No 490-11. <br /> LJ 2.MEC14ANICAL LINE LPAK DMC`rM(MLLD)THAT ROUTINPLY PRRFORM.S 3,0 gph,[ZAK TESTS AND RESTRICTS OR SHUTS OFF 4w3'o' <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.w ocR§2636i <br /> muD mANuFAcTuRER(s)-Red Jacket,VMl 49&37. MODEL#(SI.- FXIV 490-1& <br /> Ll 3.FjBcTRoNic LINE LEAK DETEcm(ELW)THAT ROUTINELY PERFORMS 3.0 gp.h.LEAK TINM p.3 cotpaq 490,39. <br /> ELLD MANUFACTURP-RM- 490-40. MODEL#(S). 49041. <br /> PROCTRAMMM IN LINE LEAK TEST: Ela.MINlMUMMOl-MILY0.2gp.& El b.MINIMTTM ANNUAL 0.1".IL 490-& <br /> 811D DIFTECTION OF A PIPING LEAK TRJGGERS AuTomA:ric Pump SHUTDOWN. 11 L YES 0 b.NO -' <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AtFrOMAT[C PUMP SHUTDOWN. YOS El b.No 490-44 <br /> 4.PIPE INTWRITY TESTING. 49"S. <br /> REQUENCY: 11 &ANNUALLY El b EVERY 3 YEARS c,OTHER(�L�ff 400-K <br /> -0-37-isuAL PIPE MONITORING. 4004& <br /> FREQUENCY: 0 &DAILY 11 b.WMKLY c.MrN,MONTHLY&EACHIIMBSYMMM OFERATED. 49049. <br /> 6.SUCTION PIPING h=- S EXEMPTION CRTMRIA,t23 ccR uoowg 4W,% <br /> Ll 7.NO REGULATED PIPING PER HEALTH AND SmKnL�CpDH,DMSION 20.CHAPTER 6.7 IS C0NNaCTED TO TIM TANK SYSTEM. 490-51. <br /> 99,OTHER(SpeciiN) 4ftst <br />