Laserfiche WebLink
SAN JOAQ1.TN COUNTY ENVIRONMENTAL HEALTH• F.PARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN ® PAGE 1 <br /> -� <br /> Mot <br /> TYPE OF ACTION 1.NEV PLAN ❑ 2.CHANGE OF INFORMATION s _ <br /> PLAN TYPE ❑ MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br /> (("heck one iter only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION _ _T <br /> FACILITY ID#(Agency Use Only) - _ _.1_�T_�_L__�T _� <br /> FACILITY NAME - <br /> / �,.. Moo CITY Mos, <br /> FACILITY SITE ADDRESS <br /> IL EQUIPMENT TESTING AND PREVENTIVE MAINTENCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors.etc.)be performed in <br /> M06 <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. M07 <br /> MOM rORING EQUIPMENT IS SERVICED 01.ANNUALLY ❑ 99.OTHER(Specify): <br /> u_ III. MONITORING LOCATION <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is perfetmed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form Hazardous Materials Business Plan map,etc.)which shows all required information include it with this plan. _ <br /> IV, TANK MONITORING M1t10. <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHODS) (Check all that apply) <br /> 1.CONTINUOUS ELECTRONIC MONITGORINF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) MI i <br /> SECONDARY CONTAINMENT IS: a.DRY C] b.LIQUID FILLED ® e7 UNDER PRE.SSLIRE ❑ d.UNDER VACUUM, <br /> M13. <br /> M12. MODEL#: <br /> PANEL MANUFACTURER: /dtl C ptJ 'R �✓ - � IVIS <br /> LEAK SENSOR MANUFACTURER: M34 MODEL#(S): _. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR 5INGLF.WALL_LA1pd,K M <br /> PANEL MANUFACTURER: M16 MODEL#: <br /> _ MIS. M14. <br /> IN-TANK PROBE MANUFACTURER: __ MODEL#(S): <br /> M2o. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY Met <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): _ M22. M23 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify) M_'4❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2.646.I <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(NITG)PER 23 CCR§2645 M25 I <br /> TESTING PERIOD. ❑ a.36 HOURS ❑ b.64 HOURS <br /> ❑ S.INTEGRITY TESTING PER 23 CCR§2643.1 M2E R927 <br /> TEST FREQUENCY: a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): - <br /> ❑ &VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Requires agency approval) M2e <br /> ® 99.all-HERV. PIPE MONITORING _ <br /> M NITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE El d.UNDER VACUUM <br /> M31. <br /> �_ M11 MODEL#: � ,� W3PANEL MANUFACTURER: N135 <br /> LEAK SENSOR MANUFACTURER: tot PU4 MODEL#(S)' f <br /> a.YES EJ b.NO Mac <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN!'. <br /> M37 WILL FAILURE!DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN' ,�a.YES C] b.NO <br /> L!3 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETEC ED ® (•. ,, <br /> MLLD MANUFACTURER(s): -,1 __ Mas MODEL#(S): LSTP'" `` <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS f <br /> t440. MODEL#: Ist4 <br /> ELLD MANUFACTURER: h11El E] INI <br /> 1! <br /> PROGRAMMED LINE INTEGRITY TESTS: a.MINIMUM MONTHLY 0.2 g.p.h. b.MMUTA ANNUAL 0.1 g.p.h. <br /> a.YES ❑ b.NO <br /> X143 <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTORIATIC PUMP SHU"!DOWN• ❑ I <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? a.YES ❑ b.NO M44. <br /> 4.INTEGRITY TESTING <br /> Mss. Mas. <br /> TEST FREQUENCY: a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) <br /> ® 5.VISUAL MONITORING DONE: a.DAILY ❑ b.WEEKLY" ❑ c.MIN,MONTHLY&EACH TIME SYSTEM OPERATED" Mal. I <br /> A °Requires agency approval "Allowed fist manitoring of unburied emergency generator fuel piping only per HSC§25281 RbX?? 1 <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) Mott <br /> ❑ 99.OTHER4Specify) --- <br /> 07/23/03 <br /> SJCEHD-d(07/03)-1/4 <br /> L _ <br />